Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17212A928 + (20:48:45, 8 January 2025)
- ML17212A924 + (20:48:46, 8 January 2025)
- ML17212A923 + (20:48:46, 8 January 2025)
- L-81-463, Forwards Response to Core Performance Branch Request for Addl Info Re Instrumentation to Detect Conditions of Inadequate Core Cooling.Updated Info in Response to 811019 Telcon Encl + (20:48:47, 8 January 2025)
- L-81-452, Forwards Four Completed Tables of Diesel Generator Reliability Data,In Response to NRC Request for Addl Info Re Station Blackout + (20:48:49, 8 January 2025)
- L-81-457, Forwards Minor Corrections to 810723 Analysis for Main Steam Line Break Event.Conclusions Remain Valid + (20:48:51, 8 January 2025)
- L-81-456, Forwards Monthly Status Rept for Const & Startup for Sept 1981 + (20:48:52, 8 January 2025)
- ML17212A918 + (20:48:54, 8 January 2025)
- ML17212A915 + (20:48:56, 8 January 2025)
- ML17212A914 + (20:48:56, 8 January 2025)
- ML17212A913 + (20:48:57, 8 January 2025)
- ML17212A911 + (20:48:58, 8 January 2025)
- ML17212A908 + (20:48:59, 8 January 2025)
- ML17212A906 + (20:49:00, 8 January 2025)
- ML17212A903 + (20:49:01, 8 January 2025)
- ML17212A902 + (20:49:02, 8 January 2025)
- ML17212A901 + (20:49:03, 8 January 2025)
- ML17212A896 + (20:49:04, 8 January 2025)
- L-81-438, Forwards Summary of Analysis Re 810928 Request for Tech Spec Changes for Mode 5 Shutdown Margin Requirements.Changes Recommended in Order to Address Boron Dilution Event W/ Reduced RCS Vol + (20:49:06, 8 January 2025)
- ML17212A888 + (20:49:06, 8 January 2025)
- L-81-440, Submits Clarification of Intended Configuration & Position Re 811007 Request for NRC Interpretation of Tech Spec Operation Requirements to Insure Compliance.Intended Action Involves Emergency Buses for Diesel Generators + (20:49:08, 8 January 2025)
- L-81-439, Confirms That Proposed Stretch Power Tech Spec Changes & Analyses Are Appropriate for Cycle 5 Operation at 2700 Mwt Core Power,Per NRC .No Further Tech Spec Changes Required + (20:49:13, 8 January 2025)
- L-81-436, Forwards Schedule for Simulator & Licensing Exams for 1982 & Jan 1983,in Response to Generic Ltr 81-29.Assumptions Used Include Consideration That All Senior Reactor Operator Upgrade Candidates Will Require Simulator Exam + (20:49:18, 8 January 2025)
- ML17212A877 + (20:49:20, 8 January 2025)
- ML17212A876 + (20:49:21, 8 January 2025)
- L-81-433, Forwards Response to Fire Protection Questions,Revision to Various 440 Series Questions & Revised FSAR Chapter 15, in Response to NRC Request for Addl Info.Responses Will Be Incorporated in Future FSAR Amend + (20:49:22, 8 January 2025)
- L-81-426, Forwards Responses to NRC Requests for Addl Info Re Fsar. Responses Will Be Incorporated Into FSAR Amend + (20:49:24, 8 January 2025)
- ML17212A865 + (20:49:24, 8 January 2025)
- L-81-429, Forwards Itemized Review of Compliance W/Significant Rules & Regulations,Per 10CFR,in Response to NRC 810929 Request + (20:49:26, 8 January 2025)
- L-81-428, Forwards Updated Interim Rept Re Review of Controls for Handling Heavy Loads Per NUREG-0612, Control of Heavy Loads at Nuclear Power Plants - Resolution of Tap A-36 + (20:49:28, 8 January 2025)
- ML17212A855 + (20:49:30, 8 January 2025)
- L-81-425, Application to Amend to App a of License DPR-67 Adding Limitations to Address Mode 5 Operation W/Rcs Partially Drained + (20:49:31, 8 January 2025)
- ML17212A852 + (20:49:31, 8 January 2025)
- ML17212A843 + (20:49:34, 8 January 2025)
- ML17212A845 + (20:49:34, 8 January 2025)
- ML17212A839 + (20:49:39, 8 January 2025)
- ML17212A837 + (20:49:40, 8 January 2025)
- ML17212A836 + (20:49:41, 8 January 2025)
- IR 05000335/1981015 + (20:49:44, 8 January 2025)
- ML17212A825 + (20:49:45, 8 January 2025)
- ML17212A824 + (20:49:46, 8 January 2025)
- L-81-392, Ack Receipt of IE Insp Rept 50-335/81-15,on 810622-0702. No Proprietary Info.Also Forwards Response to NRC Re Violation Noted in IE Insp Rept.Steps Taken to Store Records in Accordance W/Applicable Requirements + (20:49:47, 8 January 2025)
- ML17212A821 + (20:49:49, 8 January 2025)
- ML17212A817 + (20:49:50, 8 January 2025)
- ML17212A815 + (20:49:51, 8 January 2025)
- ML17212A814 + (20:49:52, 8 January 2025)
- L-81-393, Requests That Info Re Identity of Employees & Positions in IE Investigation Rept 50-335/81-06 Be Withheld Per 10CFR2.790.Info Should Be Deleted as Shown in Encl marked-up Rept + (20:49:53, 8 January 2025)
- L-81-406, Responds to NRC Re Violations Noted in IE Investigation Rept 50-335/81-06.Corrective Actions: Procedure Revised to Require Verification of Actions in Util Responses to Nrc.Procedure Will Be Issued by 811001 + (20:49:55, 8 January 2025)
- ML17212A810 + (20:49:57, 8 January 2025)
- L-81-414, Notifies That Util Will Continue to Use Previously Submitted Proposed Inservice Insp Program Until 910201,subj to Restrictions in NRC + (20:49:58, 8 January 2025)
- L-81-416, Informs of Progress Towards Implementing NUREG-0737 Item II.E.1.2 Safety-grade Equipment Associated W/Automatic Initiation of Auxiliary Feedwater Flow Will Be Installed During Current Refueling Outage + (20:50:00, 8 January 2025)
- ML17212A806 + (20:50:03, 8 January 2025)