Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17212B789 + (20:39:42, 8 January 2025)
- L-82-289, Forwards Public Version of Lawnwood Medical Ctr Disaster Manual,In Response to Concerns Raised During 820408 Telcon Re Emergency preparedness.C-E Ltr of Agreement Re Support Svcs During Emergencies Encl + (20:39:43, 8 January 2025)
- ML17212B785 + (20:39:45, 8 January 2025)
- ML17212B783 + (20:39:49, 8 January 2025)
- L-82-311, Forwards Response to Base Plate Flexibility Action Items Noted in Summary of 820525 Meeting in Bethesda,Md + (20:39:50, 8 January 2025)
- L-82-316, Responds to NRC & Draft Technical Evaluation Rept Re Control of Heavy Loads.Responses Re Guideline 4 (Special Lifting Devices) & Guideline 7 (Crane Design) Require Info from Crane Vendors.Updated Status Expected by 820901 + (20:39:52, 8 January 2025)
- ML17212B774 + (20:39:53, 8 January 2025)
- L-82-314, Forwards Response to NRC Re Evaluation of Event Postulated in Question 1 Concerning Overpressure Mitigating Sys.Existing Design Adequately Addresses Scenario Postulated in Question 1 + (20:39:54, 8 January 2025)
- ML17212B773 + (20:39:54, 8 January 2025)
- ML17212B770 + (20:40:00, 8 January 2025)
- L-82-307, Informs of Plans to Construct Small Recreational Facility on Beach East of Blind Creek.Project Will Result in No Significant Safety Hazard.Maps Depicting Proposed Recreational Area Encl + (20:40:02, 8 January 2025)
- ML17212B768 + (20:40:02, 8 January 2025)
- L-82-297, Forwards Rept of Const/Startup Progress for June 1982. Fuel Load Target Date of 821028 Anticipated + (20:40:04, 8 January 2025)
- L-82-294, Forwards St Lucie Plant,Unit 1,updated Fsar,Vols 1-10.List of Plant Changes/Mods Made Under Provisions of 10CFR50.59 Encl + (20:40:06, 8 January 2025)
- ML17212B731 + (20:40:08, 8 January 2025)
- L-82-290, Forwards Interpretation of Processed Data Re Marine Seismic Investigation Conducted During Jul 1981.Changes to FSAR Resulting from Interpretation of Data Will Be Included in Amend 10 to FSAR + (20:40:09, 8 January 2025)
- L-82-283, Forwards Schedule of Open Items Resulting from Seismic Qualification Review team/pump-valve Operability Review Team Audit 820514 Exit Interview.Response to Four Open Items Encl + (20:40:10, 8 January 2025)
- L-82-277, Responds to 820701 Request for Info Re Pressurizer Safety Valves & Power Operated Relief Valves Per NUREG-0737 Item II.D.1.C-E Owners Group EPRI Test Program in Progress.Final Rept Will Be Provided by 821230 + (20:40:12, 8 January 2025)
- L-82-274, Advises of Delay for Submittal of Schedule for Preparing Procedures & Training to Address Postulated Loss of All Ac Power Event.Completion Expected by 820904.Description of Training Program & Procedures Will Be Submitted by 820904 + (20:40:14, 8 January 2025)
- L-82-279, Notifies That Response to NRC 820217 Request for Addl Info Re Equipment Qualification Referenced in Part a Will Be Provided by 820801.Part B Info Expected by Sept 1982 + (20:40:15, 8 January 2025)
- L-82-278, Forwards Minutes of 820623 Meeting Initiating Engineering Verification Program & Procedure EVP-001/SL-2, Engineering Verification Program, Revision 0 + (20:40:17, 8 January 2025)
- ML17212B716 + (20:40:20, 8 January 2025)
- L-82-272, Responds to Generic Ltr 82-10, Post-TMI Requirements. Status Provided for Items I.A.1.3.1 Re Limitations on overtime,I.A.1.3.2 Re Min Shift Crew & I.D.1 Re Control Room Design Review + (20:40:21, 8 January 2025)
- ML17212B714 + (20:40:24, 8 January 2025)
- ML17212B712 + (20:40:24, 8 January 2025)
- L-82-260, Application for Amend to License DPR-67,consisting of Proposed Change to Tech Specs by Increasing Min Shift Crew Composition.Proposed Change in Response to NUREG-0737,Item I.A.1.3, Shift Manning + (20:40:25, 8 January 2025)
- L-82-249, Application to Amend App a of License DPR-67 by Deleting Requirements to Test Buried Electrical Cable Periodically to Detect Potential Environ Damage.Class II Fee Encl + (20:40:27, 8 January 2025)
- ML17212B709 + (20:40:27, 8 January 2025)
- L-82-253, Forwards Const/Startup Monthly Progress Rept for May 1982 + (20:40:29, 8 January 2025)
- ML17212B695 + (20:40:31, 8 January 2025)
- ML17212B693 + (20:40:33, 8 January 2025)
- ML17212B694 + (20:40:33, 8 January 2025)
- L-82-246, Forwards Application for Amend to CPPR-144 for Addition of co-owner & co-applicant.Payment of Class III Fee Encl + (20:40:34, 8 January 2025)
- ML17212B686 + (20:40:36, 8 January 2025)
- ML17212B687 + (20:40:36, 8 January 2025)
- ML17212B684 + (20:40:37, 8 January 2025)
- ML17212B682 + (20:40:38, 8 January 2025)
- ML17212B683 + (20:40:38, 8 January 2025)
- ML17212B681 + (20:40:39, 8 January 2025)
- ML17212B680 + (20:40:39, 8 January 2025)
- ML17212B679 + (20:40:40, 8 January 2025)
- ML17212B678 + (20:40:41, 8 January 2025)
- ML17212B677 + (20:40:42, 8 January 2025)
- ML17212B676 + (20:40:42, 8 January 2025)
- ML17212B673 + (20:40:43, 8 January 2025)
- ML17212B674 + (20:40:43, 8 January 2025)
- L-82-238, Forwards Responses to Questions 2-5 Re Overpressure Mitigating Sys,Per 820412 Request.Testing Procedures Verifying Operability Will Be Developed by 820801.Response to Question 1 Will Be Provided by 820716 + (20:40:44, 8 January 2025)
- ML17212B670 + (20:40:47, 8 January 2025)
- ML17212B668 + (20:40:48, 8 January 2025)
- ML17212B667 + (20:40:48, 8 January 2025)
- ML17212B666 + (20:40:49, 8 January 2025)
- ML17212B665 + (20:40:50, 8 January 2025)