Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-82-377, Forwards Fee for 820628 Applications for Amends to Facility License,In Response to NRC + (20:37:16, 8 January 2025)
- ML17213A422 + (20:37:19, 8 January 2025)
- ML17213A420 + (20:37:20, 8 January 2025)
- L-82-392, Requests Concurrence by 820928 Re Use of ASME Code Case N-316 for Defining Allowable Code Dimensions for Socket Welds.Request Based on Failure of Fillet Leg Dimensions to Meet 1.09t ASME Code Requirement + (20:37:23, 8 January 2025)
- ML17213A418 + (20:37:25, 8 January 2025)
- L-82-394, Forwards Fire Protection Commitments Made During May 1982 Site Visit,Including Commitment to Add Automatic Smoke Detection Capability to Both safety-related Battery Rooms. Drawing Encl + (20:37:26, 8 January 2025)
- L-82-393, Forwards Revised Response to Question 410.10 Re Handling of Light Loads.Probability of Unacceptable Consequences Resulting from Drop of Light Load Over Open Reactor Vessel Is Very Low + (20:37:28, 8 January 2025)
- ML17213A409 + (20:37:30, 8 January 2025)
- L-82-380, Concurs W/Zr Rozstoczy Position That Util Clarification of SER (NUREG-0843) & Suppl,Section 3.11 Re Equipment Qualification Not Acceptable.Util Should Adhere to Category I Requirements,Per NUREG-0588 & CLI-80-21 + (20:37:31, 8 January 2025)
- ML17213A405 + (20:37:32, 8 January 2025)
- L-82-381, Forwards Addl Analyses Re Reactor Coolant Pump Seized Rotor W/Loss of Offsite Power W/Worst Single Active Failure & Loss of All Nonemergency Ac Power W/Worst Single Active Failure, Per L-81-484 + (20:37:33, 8 January 2025)
- ML17213A402 + (20:37:35, 8 January 2025)
- ML17213A401 + (20:37:38, 8 January 2025)
- ML17213A394 + (20:37:39, 8 January 2025)
- ML17213A391 + (20:37:40, 8 January 2025)
- ML17213A389 + (20:37:41, 8 January 2025)
- ML17213A382 + (20:37:43, 8 January 2025)
- ML17213A381 + (20:37:44, 8 January 2025)
- ML17213A380 + (20:37:45, 8 January 2025)
- ML17213A377 + (20:37:46, 8 January 2025)
- ML17213A376 + (20:37:46, 8 January 2025)
- L-82-368, Forwards Addl Info Re Emergency Action Levels,In Response to NRC + (20:37:47, 8 January 2025)
- L-82-359, Informs That Design of Containment Isolation Actuation Signal Has Been Revised Based on FSAR Review.Design Change Completed & Fully Implemented in Field + (20:37:49, 8 January 2025)
- ML17213A365 + (20:37:51, 8 January 2025)
- IR 05000341/2017007 + (20:38:03, 8 January 2025)
- ML17213A363 + (20:38:04, 8 January 2025)
- L-82-338, Application to Amend App a of License DPR-67.Amend Updates Offsite Mgt Organization to Reflect Recent Corporate Changes + (20:38:05, 8 January 2025)
- ML17213A361 + (20:38:05, 8 January 2025)
- L-82-353, Advises That NUREG-0737,Item II.D.1.B Satisfied by Power Operated Relief Valve Block Valve Info Package & Listed Info + (20:38:07, 8 January 2025)
- L-82-356, Forwards Const/Startup Monthly Status Rept for Jul 1982. Target Fuel Load Date Is 821028 + (20:38:09, 8 January 2025)
- ML17213A351 + (20:38:10, 8 January 2025)
- ML17213A348 + (20:38:11, 8 January 2025)
- L-82-355, Forwards Test Objectives & Results of Fire Stop Test Performed by Swri + (20:38:12, 8 January 2025)
- ML17213A343 + (20:38:14, 8 January 2025)
- ML17213A346 + (20:38:14, 8 January 2025)
- ML17213A341 + (20:38:15, 8 January 2025)
- ML17213A337 + (20:38:16, 8 January 2025)
- L-82-335, Responds to 820513 Request for Addl Info Re Responses to IE Bulletin 80-04, Analysis of PWR Main Steam Line Break W/ Continued Feedwater Addition. No Further Calculations Re Magnitude of Peak Pressure Necessary + (20:38:17, 8 January 2025)
- ML17213A334 + (20:38:19, 8 January 2025)
- ML17213A332 + (20:38:20, 8 January 2025)
- L-82-344, Forwards Bases for Using Containment High Range Radiation Monitor to Estimate Offsite Doses During Emergency,In Response to Div of Emergency Preparedness Request + (20:38:21, 8 January 2025)
- ML17213A325 + (20:38:23, 8 January 2025)
- ML17213A326 + (20:38:23, 8 January 2025)
- L-82-308, Forwards Amend 11 to FSAR + (20:38:24, 8 January 2025)
- ML17213A320 + (20:38:26, 8 January 2025)
- L-82-309, Forwards Amend 12 to FSAR + (20:38:27, 8 January 2025)
- L-82-320, Forwards Addl Info Re Use of Exxon Fuel in Cycle 6.Tech Spec Changes May Be Needed & NRC Approval Required Prior to Cycle 6 Startup.Proposed Changes Expected to Be Submitted No Less than 90 Days Prior to Startup + (20:38:29, 8 January 2025)
- L-82-329, Forwards Addl Info in Response to Question 7 Re Degraded Grid Protection,Per 820419 Request + (20:38:30, 8 January 2025)
- L-82-317, Forwards Addl Info on Containment Purging & Venting, in Response to NRC .Consequences of Even Gross Leakage Would Be Minimal Due to Containment & Bldg Design + (20:38:32, 8 January 2025)
- L-82-327, Advises That Util Will Respond to NUREG-0737,Item II.B.3, Post-Accident Sampling Sys, by 821206 + (20:38:34, 8 January 2025)
- L-82-328, Advises That Future Correspondence Re Engineering Verification Program Will Be Sent Directly from Engineering Verification Task Force + (20:38:36, 8 January 2025)
- L-82-315, Discusses NRC 820217 Request for Addl Info Re Environ Qualification of safety-related Electrical Equipment. Engineering Analysis I-2 in Item 2 Does Not Exist.Repts Withheld (Ref 10CFR2.790) + (20:38:37, 8 January 2025)