Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17215A718 + (20:14:32, 8 January 2025)
- ML17215A716 + (20:14:33, 8 January 2025)
- L-84-371, Rev 17 to Emergency Plan Implementing Procedure 3100021E, Duties & Responsibilities of Emergency Coordinator + (20:14:34, 8 January 2025)
- ML17215A712 + (20:14:37, 8 January 2025)
- ML17215A710 + (20:14:37, 8 January 2025)
- ML17215A709 + (20:14:38, 8 January 2025)
- L-84-344, Forwards Florida Audubon Soc & Natl Marine Fisheries Svc Comments on Draft Sea Turtle Entrapment Study Rept.Support in Soliciting Comments from Us Fish & Wildlife Svc,Epa & Dept of Natural Resources Requested + (20:14:40, 8 January 2025)
- ML17215A696 + (20:14:40, 8 January 2025)
- L-84-295, Application for Amend to License DPR-67,including Tech Specs for Containment Water Level & Containment Pressure Monitor, Per Generic Ltr 83-37 & NUREG-0737 + (20:14:42, 8 January 2025)
- ML17215A690 + (20:14:42, 8 January 2025)
- L-84-343, Advises That Intake Structure Pump Encl Fan Housing & Condensate Storage Tank Vent Hood Housing Modified,Per Sser 2 (NUREG-0843).Reactor Auxiliary Bldg Sliding Door Satisfies NRC Allowable Ductility Factor + (20:14:44, 8 January 2025)
- ML17215A680 + (20:14:50, 8 January 2025)
- ML17215A673 + (20:14:51, 8 January 2025)
- ML17215A676 + (20:14:51, 8 January 2025)
- ML17215A671 + (20:14:52, 8 January 2025)
- L-84-336, Advises That SPDS Installed & Operable in Accordance W/License Condition 2.C.179.1a & 840614 Confirming Order. Considerable Maint Effort May Be Required During First Yr of Operation + (20:14:54, 8 January 2025)
- ML17215A669 + (20:14:54, 8 January 2025)
- L-84-346, Forwards Rev 3 to Fire Hazard Analysis.Rev Includes New Exemptions & Changes to Existing Exemptions.Formal Disposition of Exemption Requested by Jan 1985,in Advance of NRC Audit Scheduled for Feb 1985 + (20:14:56, 8 January 2025)
- ML17215A661 + (20:14:58, 8 January 2025)
- L-84-354, Application for Amend to License NPF-16,changing Tech Specs to Increase Core Power Level from 2,560 MW to 2,700 MW + (20:14:59, 8 January 2025)
- ML17215A657 + (20:15:01, 8 January 2025)
- ML17215A654 + (20:15:03, 8 January 2025)
- L-84-340, Forwards Response to 840914 Request for Addl Info Re Inservice Insp Program.Drawings Undergoing General Rev for Incorporation of as-built Field Changes & Clarification + (20:15:04, 8 January 2025)
- L-84-333, Forwards Status of Resolution of License Conditions Covering Inservice Insp Program,Axial Growth & Fire Protection.Deletion of Completed Conditions in Future License Amend Requested + (20:15:06, 8 January 2025)
- ML17215A649 + (20:15:08, 8 January 2025)
- L-84-327, Forwards Addl Info Re Safe Loadpaths,Testing of Crane Controls & Special Lifting Devices,For Review of Response to NUREG-0612, Control of Heavy Loads at Nuclear Power Plants + (20:15:09, 8 January 2025)
- ML17215A643 + (20:15:11, 8 January 2025)
- ML17215A642 + (20:15:12, 8 January 2025)
- ML17215A640 + (20:15:13, 8 January 2025)
- ML17215A634 + (20:15:14, 8 January 2025)
- L-84-314, Forwards Fuel Rod Axial Growth Evaluation, Per License Condition 2.C.5.Results of Shoulder Gap Insp & Evaluation Assure Shoulder Gap Clearance Adequate for All Future Cycles + (20:15:15, 8 January 2025)
- ML17215A630 + (20:15:17, 8 January 2025)
- L-84-312, Forwards Thermal Shield Failure at St Lucie Nuclear Generating Station Unit 1 + (20:15:18, 8 January 2025)
- L-84-288, Forwards Response to Containment Sys Branch Request for Addl Info Re Cycle 2 Reload Safety Rept + (20:15:20, 8 January 2025)
- L-84-285, Forwards Addl Info Re Safety Parameter Display Sys Implementation Plan Submitted in Response to Generic Ltr 82-33 & 840914 Request.Info Covers Isolation Devices,Human Factors Program & Data Validation + (20:15:22, 8 January 2025)
- L-84-305, Forwards Info in Response to NRC Re Inadequate Core Cooling Instrumentation sys,NUREG-0737,Item II.F.2. Implementation Ltr Rept & Milestones for Implementation of Sys Included + (20:15:23, 8 January 2025)
- L-84-306, Informs of Nonconformance W/Vendor Equipment Technical Info Program Recommendations (Generic Ltr 83-28,Item 2.2.2) in Areas of Internal Handling of Vendor Svcs & Vendor Info. Revised Procedures to Be Incorporated by 841215 + (20:15:28, 8 January 2025)
- L-84-301, Provides Justification That Loss of One LPSI Pump Worst Active Failure,In Response to Amend 63 to SER for Cycle 6 Restart + (20:15:30, 8 January 2025)
- L-84-287, Ack Receipt of 840914 Request for Addl Info Re Inservice Insp Program.Requested Info Will Be Submitted by 841119 + (20:15:32, 8 January 2025)
- L-84-296, Advises That Complete Response to Re NUREG-0737, Item II.F.2, Inadequate Core Cooling Instrumentation Sys, Will Be Provided by 841031,per 841019 Commitment + (20:15:34, 8 January 2025)
- L-84-274, Responds to Item 2 of Generic Ltr 84-15 Re Improvement & Maint of Diesel Generator Reliability.Formal Log to Readily Meet Intent of Reg Guide 1.108 Implemented + (20:15:36, 8 January 2025)
- L-84-280, Application for Amend to License NPF-16,revising Tech Specs to Implement Hardware Change in Continuous Containment Purge Sys.Mod to Station Air Sys Planned to Replace Containment Isolation Valves I-V-18-794 & I-V-18-796 + (20:15:38, 8 January 2025)
- ML17215A610 + (20:15:38, 8 January 2025)
- ML17215A604 + (20:15:41, 8 January 2025)
- ML17215A597 + (20:15:42, 8 January 2025)
- ML17215A595 + (20:15:43, 8 January 2025)
- ML17215A594 + (20:15:45, 8 January 2025)
- ML17215A592 + (20:15:45, 8 January 2025)
- L-84-273, Advises That Re Spent Fuel Storage Inadvertently Numbered L-84-266.Number Should Be L-84-272 + (20:15:47, 8 January 2025)
- ML17215A591 + (20:15:47, 8 January 2025)
- L-84-262, Forwards Response to Requesting Addl Info Re Facility Cycle 2 Reload.Response to Item 13 Proprietary to C-E.Response to Item 13 Withheld (Ref 10CFR2.790) + (20:15:49, 8 January 2025)