Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:73939 + (19:27:44, 8 January 2025)
- ML17223A269 + (19:27:46, 8 January 2025)
- ML17223A267 + (19:27:47, 8 January 2025)
- ML17223A266 + (19:27:48, 8 January 2025)
- ML17223A264 + (19:27:48, 8 January 2025)
- ML17223A262 + (19:27:50, 8 January 2025)
- TAC:08923 + (19:27:51, 8 January 2025)
- ML17223A260 + (19:27:52, 8 January 2025)
- ML17223A258 + (19:27:53, 8 January 2025)
- TAC:67529 + (19:27:54, 8 January 2025)
- L-89-277, Marine Turtle Removals St Lucie Plant Intake Canal, Apr- June 1989 + (19:27:55, 8 January 2025)
- ML17223A256 + (19:27:55, 8 January 2025)
- L-89-276, Responds to NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. No Gross Discernable Distress or Structural Damage Identified in Pressurizer Surge Lines + (19:27:57, 8 January 2025)
- ML17223A253 + (19:27:59, 8 January 2025)
- IR 05000335/1989017 + (19:28:00, 8 January 2025)
- ML17223A246 + (19:28:01, 8 January 2025)
- ML17223A244 + (19:28:03, 8 January 2025)
- ML17223A243 + (19:28:06, 8 January 2025)
- L-89-273, Forwards Status of 10CFR50.62, Requirements for Reduction of Risk from ATWS Events for Light-Water-Cooled Nuclear Power Plants, Mods as of mid-Jul 1989,per NRC Request Made at 890301 Meeting + (19:28:07, 8 January 2025)
- L-89-264, Application for Amends to Licenses DPR-67 & NPF-16,revising Tech Spec Section 3.7 to Clarify Testing Requirements for Main Feedwater Line Isolation Valves & Main Steam Line Isolation Valves + (19:28:09, 8 January 2025)
- ML17223A241 + (19:28:09, 8 January 2025)
- ML17223A237 + (19:28:11, 8 January 2025)
- L-89-263, Application for Amend to License NPF-16,revising Action F of Tech Spec 3.8.1.1 for Consistency W/Emergency Diesel Generator Testing Action Requirements + (19:28:12, 8 January 2025)
- 05000389/LER-1989-005, :on 890626,reactor Tripped on Loss of Load from 22% Power During Turbine Startup Due to High Steam Generator Level in Steam Generator.Caused by Personnel Error.Personnel Counseled & Training Methods Evaluated + (19:28:14, 8 January 2025)
- ML17223A231 + (19:28:15, 8 January 2025)
- L-89-252, NPDES Noncompliance Notification:On 890517 & 25,iron Concentration from Radwaste Batch Discharge Exceeded Max Concentration Limit.Source of Iron in Effluent Stream Under Investigation + (19:28:16, 8 January 2025)
- 05000335/LER-1989-002-03, :on 890614,diesel 1B Fuel Oil Transfer Pump Discharge Found in Locked Closed Position.Caused by Personnel Error by Util non-licensed Operator.Valve Reopened & Locked Open & Operators Counseled + (19:28:18, 8 January 2025)
- ML17223A228 + (19:28:25, 8 January 2025)
- ML17223A226 + (19:28:26, 8 January 2025)
- ML17223A225 + (19:28:27, 8 January 2025)
- L-89-246, Forwards Outline of Spent Fuel Pool Boraflex Panels Integrity Assessment Program to Be Conducted by Util to Meet Condition Imposed by ASLBP + (19:28:28, 8 January 2025)
- ML17223A223 + (19:28:30, 8 January 2025)
- ML17223A222 + (19:28:31, 8 January 2025)
- IR 05000335/1989015 + (19:28:40, 8 January 2025)
- ML17223A216 + (19:28:42, 8 January 2025)
- 05000389/LER-1989-004-02, :on 890605,leak Rate on Containment Penetration 10 Exceeded Allowance,Per Tech Spec 4.6.1.7.3. Caused by Personnel Error.Technical Manual Change Request Submitted + (19:28:50, 8 January 2025)
- IR 05000335/1989010 + (19:28:51, 8 January 2025)
- L-89-232, Advises That Util & Consultant Conducted Air Quality Testing Per Generic Ltr 88-14.Air Quality Met Air Quality Requirements of Instrument Soc of America + (19:28:52, 8 January 2025)
- L-89-227, Forwards Results of Field Survey for Plant Beach Survey Procedure Completed on 890524 & Reduction of Field Survey Data Completed on 890605.Dune Condition Acceptable,Per Unit 1 Tech Spec 5.1.3 + (19:28:54, 8 January 2025)
- ML17223A210 + (19:28:57, 8 January 2025)
- ML17223A209 + (19:28:58, 8 January 2025)
- L-89-225, Informs That Resolution of Items Outlined in Section 5.2 of Technical Evaluation Repts Re NUREG-0737,Item II.D.1, Performance Testing of Relief & Safety Valves Will Be Completed by 891215 + (19:28:59, 8 January 2025)
- L-89-223, Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Plant Did Not Install Westinghouse Mechanical Plugs from Listed Heat Numbers + (19:29:01, 8 January 2025)
- L-89-204, Forwards Suppl to 1988 Annual Operating Rept + (19:29:03, 8 January 2025)
- ML17223A203 + (19:29:03, 8 January 2025)
- ML17223A200 + (19:29:05, 8 January 2025)
- ML17223A199 + (19:29:06, 8 January 2025)
- ML17223A198 + (19:29:06, 8 January 2025)
- L-89-210, Advises That Commitment Date for Implementing Emergency Operating Procedures Extended to 891031 Due to Rev & Validation Process & Training on Revs to Requalification Program,Per Insp Repts 50-335/88-08 & 50-389/88-08 + (19:29:08, 8 January 2025)
- ML17223A196 + (19:29:08, 8 January 2025)
- ML17223A193 + (19:29:10, 8 January 2025)