Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000730/2009016 + (18:33:48, 8 January 2025)
- ML17228B321 + (18:33:50, 8 January 2025)
- ML17228B320 + (18:33:51, 8 January 2025)
- L-95-296, Requests Approval of Relief Request 19/20 for Units 1 & 2, Respectively + (18:33:52, 8 January 2025)
- ML17228B318 + (18:33:52, 8 January 2025)
- ML17228B316 + (18:33:55, 8 January 2025)
- ML17228B314 + (18:33:56, 8 January 2025)
- IR 05000335/1989025 + (18:33:58, 8 January 2025)
- ML17228B311 + (18:33:59, 8 January 2025)
- 05000389/LER-1995-004-02, :on 951010,RCS Instrument Nozzle Leakage Occurred.Caused by Primary Water Stress Corrosion Cracking. Completed Visual Insp of Other RCS Instrument Nozzles + (18:34:00, 8 January 2025)
- L-95-289, Forwards Engineering Rept Describing Event in Which Facility EDG Tripped Due to Reverse Power During Performance of Integrated Safeguards Testing on 951012 + (18:34:02, 8 January 2025)
- ML17228B308 + (18:34:02, 8 January 2025)
- ML17228B303 + (18:34:04, 8 January 2025)
- L-95-282, Provides Initial Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (18:34:06, 8 January 2025)
- ML17228B300 + (18:34:06, 8 January 2025)
- ML17228B296 + (18:34:09, 8 January 2025)
- ML17228B295 + (18:34:16, 8 January 2025)
- ML17228B294 + (18:34:18, 8 January 2025)
- ML17228B292 + (18:34:19, 8 January 2025)
- L-95-280, Monthly Operating Repts for Sept 1995 for St Lucie Units 1 & 2 + (18:34:20, 8 January 2025)
- ML17228B290 + (18:34:25, 8 January 2025)
- ML17228B289 + (18:34:26, 8 January 2025)
- L-95-274, Forwards Rev 1 to Plan to Improve Operational Performance at Plant + (18:34:27, 8 January 2025)
- L-95-246, Application for Amends to Licenses DPR-67 & NPF-16,removing SR Re Dune & Mangrove Surveys from TS + (18:34:28, 8 January 2025)
- L-95-252, Comment Supporting RG DG-1043,Rev 2 to RG 1.49, NPP Simulation Facilities for Use in Operator License Exams + (18:34:30, 8 January 2025)
- L-95-254, Withdraws Portion of Amend Request Involving Audits of Fire Protection Programmatic Controls,Fire Protection Equipment & Program Implementation + (18:34:31, 8 January 2025)
- 05000335/LER-1995-003, :on 950708,automatic Reactor Trip Occurred During Overspeed Surveillance Testing Due to Personnel Error.Counselled Operations Personnel Involved W/Event & Made Procedure Changes + (18:34:33, 8 January 2025)
- 05000335/LER-1995-008, :on 950828,HPSI Pump Operation During Plant Conditions Was Not Allowed by TS Due to Personnel Error. Notified Operations Dept Personnel of Lack of Clarity in TS Applicability Statement & TS Changes + (18:34:35, 8 January 2025)
- L-95-264, Grants NRC Permission to Copy Final Plant Specific Seismic Adequacy Evaluation of St Lucie Unit 1 to Resolve USI A-46 & GL 87-02 + (18:34:35, 8 January 2025)
- ML17228B278 + (18:34:37, 8 January 2025)
- L-95-259, Monthly Operating Repts for Aug 1995 for St Lucie Units 1 & 2 + (18:34:38, 8 January 2025)
- L-95-262, Forwards Matrix Including Description of Each Corrective Action & Current Status Re Series of Events at Facility + (18:34:40, 8 January 2025)
- ML17228B275 + (18:34:41, 8 January 2025)
- ML17228B273 + (18:34:43, 8 January 2025)
- ML17228B272 + (18:34:44, 8 January 2025)
- ML17228B271 + (18:34:45, 8 January 2025)
- ML17228B270 + (18:34:46, 8 January 2025)
- IR 05000335/1995016 + (18:34:54, 8 January 2025)
- ML17228B267 + (18:34:55, 8 January 2025)
- L-95-258, Special Rept:On 950812,post Hurricane Erin Beach Dune Survey Performed.Average Values of Results Greater than or within Range Provided in St Lucie Unit 1 Final Usar,Section 2.4.2.2 & Acceptable + (18:34:56, 8 January 2025)
- ML17228B265 + (18:34:58, 8 January 2025)
- ML17228B263 + (18:34:59, 8 January 2025)
- ML17228B261 + (18:35:00, 8 January 2025)
- ML17228B260 + (18:35:01, 8 January 2025)
- 05000335/LER-1995-007, :on 950817,inadvertent Containment Spray Via 1A Low Pressure SI Pump While Venting ECCS During Startup Due to Inadequate Procedure.Operators Stopped 1A LPSI Pump & Isolated SDC HX to Stop Spray + (18:35:04, 8 January 2025)
- IR 05000335/1995013 + (18:35:07, 8 January 2025)
- ML17228B252 + (18:35:08, 8 January 2025)
- ML17228B251 + (18:35:10, 8 January 2025)
- L-95-232, Forwards Responses to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity. Util Considers Submittal Complete Response to Requests in GL Supplement + (18:35:11, 8 January 2025)
- ML17228B249 + (18:35:11, 8 January 2025)
- L-95-230, Monthly Operating Repts for July 1995 for St Lucie Units 1 & 2 + (18:35:14, 8 January 2025)