Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17229A941 + (18:05:24, 8 January 2025)
- ML17229A940 + (18:05:25, 8 January 2025)
- ML17229A939 + (18:05:26, 8 January 2025)
- ML17229A937 + (18:05:28, 8 January 2025)
- IR 05000335/1998010 + (18:05:31, 8 January 2025)
- ML17229A934 + (18:05:32, 8 January 2025)
- L-98-287, Requests Approval of Relief Request VR-17 Re Containment Spray Header Check Valve Disassembly & Insp,Per Provisions of 10CFR50.55a(a)(3).Approval Is Requested by June 1999 to Support Outage Planning for Fall 1999 Refueling Outage + (18:05:33, 8 January 2025)
- L-98-296, Informs That Listed Number of Tubes Were Plugged During Unit 2 Refueling Outage (SL2-11),per TS 4.4.5.5.a. Cumulative Tubes Plugged During Outage & Previous Outages, Submitted + (18:05:34, 8 January 2025)
- 05000389/LER-1998-005, :on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage + (18:05:36, 8 January 2025)
- 05000389/LER-1998-005-01, Forwards LER 98-005-01,describing How New MOV Methodology Caused Past PORV Block Valve Operation Problems.Revised LER Changes Safety Significance for Inoperable PORV Block Valves Based on Subsequent SS Analysis,Per LER 98-00 + (18:05:38, 8 January 2025)
- ML17229A927 + (18:05:40, 8 January 2025)
- L-98-278, Submits Response to GL 98-02, Loss of Reactor Coolant Inventory & Associated Potential for Loss of Emergency Mitigation Functions While in Shutdown Condition + (18:05:41, 8 January 2025)
- ML17229A925 + (18:05:42, 8 January 2025)
- L-98-283, Application for Amend to License DPR-67,revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 + (18:05:43, 8 January 2025)
- ML17229A921 + (18:05:45, 8 January 2025)
- ML17229A919 + (18:05:46, 8 January 2025)
- L-98-294, Withdraws Proposed TS 5.6.1 Previously Represented as Insert a in Attachment 3 to 981231 Request for Amend to License. Proposed TS in Attachment Suppl Original Submittal,Replacing Insert-A,Attachment 3 & Revises LCO 3.4.9.11 & Bases + (18:05:47, 8 January 2025)
- ML17229A916 + (18:05:47, 8 January 2025)
- ML17229A913 + (18:05:54, 8 January 2025)
- ML17229A911 + (18:05:55, 8 January 2025)
- L-98-291, Requests That NRC Add Addl Restriction to License SOP-20808 for RM Lamb,Per 10CFR55.25 & 10CFR55.23(b).Medical Exam Certification & Supporting Evidence Withheld,Per 10CFR2.790(a)(6) + (18:05:59, 8 January 2025)
- IR 05000335/1998013 + (18:06:01, 8 January 2025)
- ML17229A906 + (18:06:03, 8 January 2025)
- L-98-285, Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With + (18:06:07, 8 January 2025)
- ML17229A904 + (18:06:09, 8 January 2025)
- L-98-277, Forwards Initial Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment + (18:06:10, 8 January 2025)
- 05000335/LER-1998-008, :on 981008,inadequate Reactor Protection Sys Trip Bypass TS Was Noted.Caused by Poorly Worded Ts. Submitted LAR to Clarify Power Requirements for High Rate of Power Trips.With + (18:06:12, 8 January 2025)
- ML17229A901 + (18:06:14, 8 January 2025)
- L-98-276, Provides Supplement to Licensee Response to GL 96-06, Specifically Event Scenario,Event Description,Method Analysis,Input Parameters,Assumptions,Engineering Judgement & Uncertainties within Analysis + (18:06:15, 8 January 2025)
- ML17229A898 + (18:06:18, 8 January 2025)
- ML17229A896 + (18:06:19, 8 January 2025)
- IR 05000335/1998009 + (18:06:31, 8 January 2025)
- ML17229A890 + (18:06:33, 8 January 2025)
- L-98-242, Provides Responses to Concerns Raised in Sections O5.3 & O8 of 980723 Exam Repts 50-335/98-301 & 50-389/98-301, Administered on 980622-26 + (18:06:34, 8 January 2025)
- ML17229A887 + (18:06:36, 8 January 2025)
- ML17229A886 + (18:06:37, 8 January 2025)
- ML17229A884 + (18:06:39, 8 January 2025)
- ML17229A882 + (18:06:43, 8 January 2025)
- ML17229A880 + (18:06:44, 8 January 2025)
- ML17229A878 + (18:06:45, 8 January 2025)
- 05000389/LER-1998-006-01, :on 980918,inadvertent Afas Actuation Was Noted.Caused by Degradation of Multiple Afas Power Supplies. Replaced Afas Power Supplies & Revised Procedures.With + (18:06:46, 8 January 2025)
- 05000389/LER-1998-007-01, :on 980918,identified Discrepancies Between Fire Protection Design Requirements & Field Conditions. Caused by Inadequate Translation & Implementation of Fire Protection Requirements.Procedures Revised.With + (18:06:48, 8 January 2025)
- L-98-249, Forwards Addl Info to Support TS Rev Described in Ref License Amend Request,Per 980819 Telcon with NRC + (18:06:50, 8 January 2025)
- ML17229A875 + (18:06:50, 8 January 2025)
- L-98-264, Provides Info to Supplement Relief Request PR-12,per 10CFR50.55a(a)(3).Request Is Needed to Facilitate Implementation of Unit 1 Third Ten Year IST Program + (18:06:52, 8 January 2025)
- L-98-254, Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With + (18:06:53, 8 January 2025)
- L-98-250, NPDES Noncompliance Notification:On 980903,08,14 & 18 Differential Pressure Across Intake Travelling Screens Occurred.Caused by Excessive Jellyfish Buildup.Secured 1A1 Cw Pump & Throttled Three of Four Cw Pumps + (18:06:55, 8 January 2025)
- TAC:M98600 + (18:06:56, 8 January 2025)
- ML17229A870 + (18:06:58, 8 January 2025)
- TAC:M97209 + (18:06:59, 8 January 2025)
- L-98-247, Forwards Proposed Section 17.2.1 to St Lucie,Units 1 & 2 Ufsar,Revised to Accomodate NRC Request to Incorporate Util Commitment for Revising Quality Instructions And/Or Administrative Procedures Described in Licensee + (18:07:03, 8 January 2025)