Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17275A443 + (13:53:52, 8 January 2025)
- ML17275A442 + (13:53:53, 8 January 2025)
- CNL-17-124, Description of Changes in Revision 1 of the Browns Ferry Nuclear Plant Cyber Security Plan + (13:53:54, 8 January 2025)
- ML17275A438 + (13:53:55, 8 January 2025)
- ML17275A436 + (13:53:56, 8 January 2025)
- ML17275A435 + (13:53:57, 8 January 2025)
- ML17275A429 + (13:53:57, 8 January 2025)
- GO2-80-146, Requests Meeting W/Nrc to Discuss Containment Hydrodynamic Loads & Chugging Data Becoming Available from 4TCO Tests + (13:53:58, 8 January 2025)
- ML17275A427 + (13:54:00, 8 January 2025)
- ML17275A426 + (13:54:01, 8 January 2025)
- ML17275A425 + (13:54:02, 8 January 2025)
- ML17275A423 + (13:54:03, 8 January 2025)
- ML17275A421 + (13:54:04, 8 January 2025)
- HNP-17-076, Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements + (13:54:05, 8 January 2025)
- ML17275A420 + (13:54:05, 8 January 2025)
- ML17275A413 + (13:54:08, 8 January 2025)
- GO2-80-131, Forwards Addl Info Required for NRC to Complete Review of Partial Penetration Weld Substitution for Sacrificial Shield Wall.Includes Documents Re Shielding Correction for Shim Gaps at Elevation 541 Inches to 5 Ft & Detailed Drawings + (13:54:09, 8 January 2025)
- ML17275A411 + (13:54:14, 8 January 2025)
- ML17275A277 + (13:54:18, 8 January 2025)
- ML17275A264 + (13:54:19, 8 January 2025)
- ML17275A208 + (13:54:20, 8 January 2025)
- ML17275A202 + (13:54:22, 8 January 2025)
- ML17275A190 + (13:54:23, 8 January 2025)
- L-2017-173, Environmental Protection Plan Report, Unusual or Important Environmental Event - Turtle Mortality - 09/11/2017 Event + (13:54:26, 8 January 2025)
- MNS-17-038, Startup Ascension Summary Report Measurement Uncertainty Recapture Power Uprate + (13:54:27, 8 January 2025)
- L-17-302, Submittal of 2017 Discharge Monitoring Report + (13:54:29, 8 January 2025)
- ML17275A168 + (13:54:30, 8 January 2025)
- CNS-17-049, Submittal of Ufsar/Selected Licensee Commitment Changes Manual + (13:54:31, 8 January 2025)
- ML17275A126 + (13:54:33, 8 January 2025)
- ML17275A125 + (13:54:34, 8 January 2025)
- ML17275A069 + (13:54:37, 8 January 2025)
- IR 05000237/2017301 + (13:54:38, 8 January 2025)
- ML17275A061 + (13:54:38, 8 January 2025)
- ML17275A026 + (13:54:39, 8 January 2025)
- ML17274A000 + (13:54:40, 8 January 2025)
- ML17273A125 + (13:54:41, 8 January 2025)
- L-82-364, Forwards Revision 3 to Environ Qualification Rept & Guidebook, for safety-related Electrical Equipment.Includes Update of Various Component Evaluation Sheets,Definition of Plant Sys & Current Generic Industry Info + (13:54:42, 8 January 2025)
- L-82-280, Forwards Amend 5 to Environ Rept - OL Stage.Amend Responds to NRC 820118 Request for Add Info Re Third Intake Pipeline & Provides Revised Description of Circulating Water Sys + (13:54:43, 8 January 2025)
- ML17273A077 + (13:54:45, 8 January 2025)
- ML17273A076 + (13:54:46, 8 January 2025)
- ML17273A075 + (13:54:46, 8 January 2025)
- L-82-212, Forwards Revision to 811204 Comments on SER,NUREG-0843 + (13:54:47, 8 January 2025)
- L-82-200, Forwards Offsite Dose Calculation Manual Per Proposed Radiological Effluent Tech Specs + (13:54:49, 8 January 2025)
- L-82-203, Forwards Response to NRC Requesting Addl Info Re Control of Unit Through Total Loss of Ac Power + (13:54:51, 8 January 2025)
- L-82-188, Forwards Schedule for Completion of SER Commitments (NUREG-0843) + (13:54:52, 8 January 2025)
- ML17273A067 + (13:54:55, 8 January 2025)
- ML17273A068 + (13:54:55, 8 January 2025)
- L-82-181, Forwards Corrected Pages to Effluent & Waste Disposal Annual Rept,1980, Per .Remainder of Info Correct as Presented + (13:54:56, 8 January 2025)
- L-82-168, Forwards List of Engineering & Const Items Not Expected to Be Complete at Core Load,Consisting of NUREG-0737,Items I.D.2,II.B.1,II.B.2,II.B.3,II.E.1.2 & II.F.1 & FSAR Items. List Includes Justification for Operation Until Completion + (13:54:58, 8 January 2025)
- ML17273A063 + (13:54:59, 8 January 2025)
- L-82-158, Discusses Proposed Arrangement Between Util & NRC for Storing Facility Records.Ferc Regulations for Record Preservation Adopted.Specific Records List & PSC of Fl Order 8995 Encl + (13:55:03, 8 January 2025)