Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-83-085, Forwards Quality Verification Program,Vol 1:Overview Rept, Jul-Sept 1983 + (12:29:49, 8 January 2025)
- ML17277A822 + (12:30:04, 8 January 2025)
- GO2-83-814, Forwards WPPSS Unit 2 Single-Loop Operation Analysis. Rept Will Be Incorporated in Amend 32 to FSAR + (12:30:05, 8 January 2025)
- GO2-83-844, Forwards Response to Specific Issues Raised in Sser 3 (NUREG-0892) Addressing Seismic Qualification of safety- Related Electrical & Mechanical Equipment + (12:30:11, 8 January 2025)
- ML17277A811 + (12:30:20, 8 January 2025)
- ML17277A808 + (12:30:21, 8 January 2025)
- GO2-83-840, Clarifies Use of Quality Verification Instruction QVI-09 by Facility Project Visual Exam Acceptance Criteria for Reverification Insp of Welded Structures.Revised Page 3.8-190 to Be Incorporated Into Amend to FSAR + (12:30:22, 8 January 2025)
- GO2-83-833, Updates Response to Rev 1 to NUREG-0313 Re Intergranular Stress Corrosion Cracking in Bwrs.Summary of Selection Process Used to Determine Welds Receiving Induction Heating Stress Improvement Treatment Listed + (12:30:31, 8 January 2025)
- GO2-83-832, Advises of Util Decision to Add Auxiliary Steam Isolation Devices to Reduce Potential Reactor Bldg Accident Environ Conditions.Facility Can Be Operated Safely Until Mod Completed for Listed Reasons + (12:30:35, 8 January 2025)
- GO2-83-831, Forwards Response to SER (NUREG-0892),Confirmatory Issue 7, Question 110.42 Re Component Supports.Data Quantifies Difference Between Support Design Load W/ & W/O Inclusion of Thermal Loads + (12:30:39, 8 January 2025)
- ML17277A800 + (12:30:42, 8 January 2025)
- GO2-83-842, Forwards Environ Qualification Rept for safety-related Equipment.Justification for Interim Operation Included in Rev to Rept + (12:30:43, 8 January 2025)
- GO2-83-828, Restates Util Commitment to Install Diesel Starting Air Dryers at First Refueling Outage,Not by Fuel Load. Installation Unnecessary at Fuel Load to Complete Safe Reliable Station + (12:30:45, 8 January 2025)
- ML17277A797 + (12:30:49, 8 January 2025)
- ML17277A796 + (12:30:52, 8 January 2025)
- ML17277A795 + (12:30:53, 8 January 2025)
- ML17277A789 + (12:30:54, 8 January 2025)
- GO2-83-785, Provides Addl Response to Generic Ltr 83-24 Re TMI Action Plan Item I.G.1.Response Provides Justification for Elimination of Station Blackout Test & Restatement of WPPSS, Unit 2 Approach to Compliance w/I.G.1 + (12:30:55, 8 January 2025)
- ML17277A785 + (12:30:58, 8 January 2025)
- ML17277A784 + (12:30:59, 8 January 2025)
- GO2-83-727, Forwards Draft Test Procedure & FSAR Section Re Verification of UHS Performance.One Test Objective Is to Suppl & Extend Wind Speed Range of Previous Drift Loss Testing.Test to Be Conducted When Plant & Environ Conditions Optimum + (12:31:00, 8 January 2025)
- ML17277A780 + (12:31:04, 8 January 2025)
- ML17277A779 + (12:31:04, 8 January 2025)
- ML17277A777 + (12:31:06, 8 January 2025)
- ML17277A776 + (12:31:08, 8 January 2025)
- GO2-83-732, Forwards Info Describing Actions Taken to Resolve Const Issues Identified in IE Insp Rept 50-397/83-29,per 830715 Submittal.Schedules for Completion & Status of Programs Addressing Broad Issues Also Encl + (12:31:09, 8 January 2025)
- GO2-83-765, Advises That as of 830708,applicable Personnel Have Attended & Completed Mitigating Core Damage Training Classes or Equivalent,Per TMI Action Item II.B.4 & SER Confirmatory Item 21 Responses + (12:31:12, 8 January 2025)
- GO2-83-756, Advises That Jet Pump Holddown Beams Retensioned,Per 801204 Commitment & Section 3.9.5 of SER (NUREG-0892).Daily Jet Pump Operability Surveillance Testing & Periodic Insps Provide Addl Assurance of Proper Operation + (12:31:15, 8 January 2025)
- GO2-83-764, Confirms 830812 Telcon W/R Auluck Re Change in Current Projected Fuel Load of Early Nov 1983.Meeting W/Nrc Mgt to Discuss Fuel Load & Other Issues Requested + (12:31:18, 8 January 2025)
- GO2-83-748, Forwards Radwaste Bldg Ventilation Exhaust Flow Measurement Description in Response to Questions During Radiological Effluent Tech Spec Discussions + (12:32:03, 8 January 2025)
- ML17277A766 + (12:32:52, 8 January 2025)
- GO2-83-724, Advises That SER (NUREG-0892) Confirmatory Issue 22 Re TMI Items II.K.1.5, ESF Functioning & II.K.1.10, Safety- Related Sys Operability Status, Will Remain Open Until Corrective Actions Completed + (12:32:53, 8 January 2025)
- GO2-83-710, Responds to SER Licensing Condition 4 Re Inadequate Core Cooling (TMI Item II.F.2).Util Will Provide plant-unique Response Following Review of NRC Evaluation of BWR Owners Group Program.Resolution Should Not Affect Fuel Loading + (12:32:58, 8 January 2025)
- GO2-83-726, Closes SER (NUREG-0892) Confirmatory Issue 14,modifying RCIC Pipe Break Detection Circuitry Sys to Prevent Spurious Isolation of RCIC Sys.Changes Will Be Incorporated Into Next FSAR Amend + (12:33:02, 8 January 2025)
- ML17277A749 + (12:33:07, 8 January 2025)
- GO2-83-704, Forwards Proposed Environ Protection Plan for Nonradiological Programs + (12:33:08, 8 January 2025)
- ML17277A746 + (12:33:10, 8 January 2025)
- ML17277A740 + (12:33:11, 8 January 2025)
- GO2-83-705, Forwards Revised FSAR Figures Documenting Analyses of SER Confirmatory Issue 1 Re Final Pipe Break Locations & Design of Pipe Whip Restraints.Final Break Locations Based on Completion of as-built Programs & Final Stress Analysis + (12:33:12, 8 January 2025)
- GO2-83-580, Resubmits Amend 30 to FSAR Due to Printer Collation Problem + (12:33:14, 8 January 2025)
- GO2-83-696, Forwards Rev 1 to 830713 Response to NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Procedures for Moving Three Lower dryer-separator Storage Pool Step Plugs Revised to Specify Max Lifting Height + (12:33:16, 8 January 2025)
- GO2-83-684, Forwards Equipment Environ Qualification Files 018008, 256016,207002,207004 & 221001 Requested by a Masciantonio, for Review.W/O Encl + (12:33:22, 8 January 2025)
- GO2-83-693, Proposes to Replace Source Range Monitors at First Refueling,Per Reg Guide 1.97,to Allow Time to Complete & Qualify Replacement & Accommodate Replacement Into Plant Design,Maint & Operating Procedures + (12:33:24, 8 January 2025)
- ML17277A702 + (12:33:26, 8 January 2025)
- ML17277A696 + (12:33:27, 8 January 2025)
- ML17277A694 + (12:33:28, 8 January 2025)
- ML17277A693 + (12:33:29, 8 January 2025)
- GO2-83-629, Forwards River Seismic Reflection Survey, Detailing Acquisition,Processing & Analysis of Marine Seismic Reflection Line Along Columbia River,Per 820629 Request for Supplemental Geology/Seismology SER Input + (12:33:30, 8 January 2025)
- GO2-83-660, Advises That BWR Owners Group Option 2 Will Be Implemented Per SER (NUREG-0892) Outstanding Issue 1.7(9), Mods to Automatic Depressurization Sys Logic. Reliance on RCIC Sys as HPCS Backup for Selected Accidents Eliminated + (12:33:32, 8 January 2025)
- GO2-83-662, Forwards Listing of Preoperational & Acceptance Tests to Be Completed Past Fuel Load as Discussed at Caseload Forecast Panel 830712-14 Meetings.Completion of Tests Will Not Compromise Safety of Fuel Load & Startup Activities + (12:33:34, 8 January 2025)
- GO2-83-675, Forwards Response to NRC Request for Addl Info Re Procedures Generation Package + (12:33:36, 8 January 2025)