Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17277B005 + (12:27:52, 8 January 2025)
- ML17277B003 + (12:27:53, 8 January 2025)
- ML17277B001 + (12:27:54, 8 January 2025)
- ML17277A999 + (12:27:55, 8 January 2025)
- ML17277A998 + (12:27:56, 8 January 2025)
- ML17277A997 + (12:27:57, 8 January 2025)
- ML17277A996 + (12:27:58, 8 January 2025)
- GO2-83-981, Forwards Info in Response to NRC Concerns Identified in 830413 Fire Protection Site Audit.W/Seven Oversize Drawings. Aperture Cards Are Available in PDR + (12:27:59, 8 January 2025)
- ML17277A993 + (12:28:03, 8 January 2025)
- ML17277A992 + (12:28:03, 8 January 2025)
- ML17277A990 + (12:28:05, 8 January 2025)
- ML17277A989 + (12:28:06, 8 January 2025)
- GO2-83-991, Requests Correspondence Be Directed to Gc Sorensen + (12:28:07, 8 January 2025)
- ML17277A984 + (12:28:11, 8 January 2025)
- ML17277A982 + (12:28:12, 8 January 2025)
- ML17277A981 + (12:28:13, 8 January 2025)
- GO2-83-982, Forwards Response to Revised FSAR Question 110.42 Re Support Design Adequacy for Anchor Group 37,including Procedure 3900-76, MEB-50 Phase II Study, Per NRC 831012 Request & SER Confirmatory Issue 7 + (12:28:14, 8 January 2025)
- GO2-83-984, Advises That Turbine Bldg Temp Monitoring Signal Being Deleted from Group I Isolation Instrumentation List. Instrument Will Remain to Provide Alarm Function Only. Reasons for Deleting Isolation Aspect Provided + (12:28:21, 8 January 2025)
- GO2-83-983, Documents Applicability of Battery Level Correction Only for Levels Out of Spec & Provides Basis for Not Applying Level Correction to Specific Gravity,Provided Battery Levels Maintained within Spec + (12:28:23, 8 January 2025)
- GO2-83-997, Forwards Addl Info Re Emergency Classification Sys & Emergency Action Levels,Per NRC 831005 Request.Due to Plant Design,Not Possible to Quantify Primary Coolant Leakage in Excess of Tech Spec Limits + (12:28:26, 8 January 2025)
- ML17277A972 + (12:28:29, 8 January 2025)
- GO2-83-968, Advises That Implementation of Changes Re Automatic Depressurization Sys Logic Identified in Util Can Be Accomplished During First Refueling Outage.Commitment Satisfies SER Outstanding Issue 1.7(9) + (12:28:30, 8 January 2025)
- GO2-83-966, Forwards Response to NRC Concerns in Sser Section 3.10.1.1 During Sqrt Audit Re Frequency Tests.Approaches Stated in GE Rept NDE-24788 Utilized + (12:28:32, 8 January 2025)
- GO2-83-967, Forwards Concerns & Responses Re Sqrt Audit Regarding Suppression Pool Outlet Valve HPCS-V-15,per NUREG-0892, Sser 3 + (12:28:34, 8 January 2025)
- GO2-83-969, Advises That Installation of Acoustic Monitoring Sys to Monitor Discharge of Safety Relief Valves & Provide Open/ Closed Info & Alarms in Control Room Completed,Per SER Confirmatory Item 18 & TMI Action Item II.D.3 + (12:28:36, 8 January 2025)
- GO2-83-935, Advises That Quality Processes Group Functions Can Be Assumed by Sys Completion Group in Const Mgt Organization. Quality Processes Group Will Be Disestablished + (12:28:38, 8 January 2025)
- ML17277A960 + (12:28:42, 8 January 2025)
- ML17277A957 + (12:28:43, 8 January 2025)
- GO2-83-730, Forwards Offsite Dose Calculation Manual + (12:28:44, 8 January 2025)
- ML17277A954 + (12:28:49, 8 January 2025)
- ML17277A952 + (12:28:50, 8 January 2025)
- ML17277A949 + (12:28:51, 8 January 2025)
- ML17277A947 + (12:28:51, 8 January 2025)
- GO2-83-923, Provides Documentation of Util Position Re Reactor Pressure Vessel Surveillance Program & Recently Amended 10CFR50 App H.Coupon Removal Sys Consistent w/1973 Version of ASTM-E185 + (12:28:54, 8 January 2025)
- GO2-83-929, Forwards Response to NRC Human Factors Engineering Preliminary Design Assessment Audit Rept of 830826 + (12:28:56, 8 January 2025)
- ML17277A943 + (12:28:56, 8 January 2025)
- ML17277A940 + (12:28:58, 8 January 2025)
- GO2-83-910, Clarifies Util Describing Emergency Operations Facility Ventilation,Per NUREG-0696.Charcoal Will Not Be Provided in Ventilation Sys + (12:28:59, 8 January 2025)
- ML17277A938 + (12:29:01, 8 January 2025)
- GO2-83-918, Forwards Rev 0 to Dissolved Gas Analysis. Implementation of post-accident Sampling Sys & Final Dissolved Gas Sampling Procedure Contingent Upon Receipt of Mod Equipment from GE to Be Delivered by 831130 + (12:29:02, 8 January 2025)
- GO2-83-876, Forwards Proprietary FSAR Table 3.9-2b Re SER Confirmatory Issues 9 & 10.Table Contains GE Proprietary Info.Table Withheld (Ref 10CFR2.790).Affidavit Requesting Info Be Withheld & GE Also Encl + (12:29:03, 8 January 2025)
- GO2-83-900, Request That NUREG-0123, Std BWR Tech Specs, Be Revised to Previous Format,Based on Need to Provide Adequate Time Frame for Completion of WPPSS-2 Power Ascension Testing Program. Susquehanna Test Duration Data Encl + (12:29:05, 8 January 2025)
- ML17277A929 + (12:29:05, 8 January 2025)
- GO2-83-875, Discusses History & Background of Use of Fire Dampers Not Fire Rated or Tested in Const of Facility,Due to state-of- the-art Const at Time of Installation.Fsar Will Be Revised Via Amend 33 to Document const.Marked-up Drawings Encl + (12:29:07, 8 January 2025)
- SECY-18-0049, Enclosure 1 -Draft-Management Directive and Handbook 8.4, Management of Backfitting, Issue Finality, and Information Collection + (12:29:13, 8 January 2025)
- ML17277A921 + (12:29:15, 8 January 2025)
- ML17277A920 + (12:29:16, 8 January 2025)
- GO2-83-907, Forwards Draft Amend 33 to FSAR Consisting of Solid Waste Mgt Sys Re Utilization of Interim Portable Solid Radwaste Solidification Sys.Submittal Will Be Incorporated in FSAR Amend 33.W/two Oversize Drawings.Aperture Cards in PDR + (12:29:17, 8 January 2025)
- GO2-83-860, Forwards Loose Parts Detection Sys Conformance Evaluation, Including Action Requested in NUREG-0892,SER Section 4.4.6 + (12:29:18, 8 January 2025)
- ML17277A916 + (12:29:20, 8 January 2025)
- GO2-83-908, Forwards Response to Telcon Request for Addl Clarification of Response to Question 640.01 a & B Re Emergency Operating Procedures Generation Package.Ser (NUREG-0892) Confirmatory Issue 15 Re Emergency Procedures Review Closed + (12:29:21, 8 January 2025)