Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-90-110, Advises That Mods to Recirculation Pump Trip Sys Implemented During 1990 Spring Refueling Outage.Remaining ATWS Items to Be Resolved as Listed + (10:46:05, 8 January 2025)
- 05000397/LER-1990-011, :on 900521,HPCS Sys Pump Suction Valve Switchover Actuation Occurred During Annual Maint.Cause Unknown.Plant Procedure 7.4.3.3.1.58 Completed on 900603 + (10:46:07, 8 January 2025)
- 05000397/LER-1989-040, :on 890919,determined That Under Certain Meteorological Conditions Situation Would Be Created Not within Licensing Basis Consideration for Secondary Containment Performance + (10:46:08, 8 January 2025)
- GO2-90-105, Responds to NRC Evaluation Findings of Licensed Operator Requalification Program.Quality of Written Exam & Job Performance Measure Question Bank Testing Matls Will Be Improved to Meet Std Prior to Next Program Evaluation Cycle + (10:46:09, 8 January 2025)
- GO2-90-107, Forwards Rev 10 to EPIP 13.1.1, Classifying Emergency. Rev Includes New Format of Matrix Charts Intended to Improve Identification of Symptomatic & situation-based Emergency Conditions + (10:46:10, 8 January 2025)
- GO2-90-108, Advises That Util Intends to Utilize R-value of 0.13% Delta K/K in Cycle 6 Implementing Procedures.Should R-value Change in Final Startup & Operations Rept,Changed Value Shall Be Used Instead + (10:46:12, 8 January 2025)
- GO2-90-106, Advises of Appointment of AL Oxsen to Position of Deputy Managing Director,Effective 900601 + (10:46:13, 8 January 2025)
- ML17285B342 + (10:46:15, 8 January 2025)
- ML17285B341 + (10:46:16, 8 January 2025)
- ML17285B339 + (10:46:17, 8 January 2025)
- ML17285B338 + (10:46:18, 8 January 2025)
- ML17285B335 + (10:46:18, 8 January 2025)
- 05000397/LER-1990-010, :on 900517,secondary Containment Isolation Occurred During Reactor Refueling Outage.Caused by Inadequate Work Control.Work Control Procedures Will Be Reviewed to Determine If Addl Steps Needed + (10:46:20, 8 January 2025)
- GO2-90-103, Forwards Warrant for $50,000 in Response to Order Imposing Civil Monetary Penalty + (10:46:21, 8 January 2025)
- ML17285B331 + (10:46:21, 8 January 2025)
- ML17285B329 + (10:46:23, 8 January 2025)
- IR 05000397/1990013 + (10:46:24, 8 January 2025)
- GO2-90-098, Advises That Calculated Max Control Room Temp Re Station Blackout Will Be Provided by 900701 + (10:46:25, 8 January 2025)
- ML17285B326 + (10:46:25, 8 January 2025)
- IR 05000249/2017008 + (10:46:27, 8 January 2025)
- ML17285B323 + (10:46:28, 8 January 2025)
- IR 05000397/1990008 + (10:46:29, 8 January 2025)
- ML17285B315 + (10:46:30, 8 January 2025)
- ML17285B314 + (10:46:31, 8 January 2025)
- ML17285B309 + (10:46:32, 8 January 2025)
- NL-17-1443, License Amendment Request to Revise Technical Specification Section 5.5.17 Containment Leakage Rate Testing Program Final Response to NRC Requests for Additional Information + (10:46:33, 8 January 2025)
- ML17285B306 + (10:46:35, 8 January 2025)
- ML17285B302 + (10:46:38, 8 January 2025)
- ML17285B300 + (10:46:39, 8 January 2025)
- GO2-90-095, Responds to NRC Re Violations Noted in Insp Rept 50-397/90-09.Validity of Violation Challenged.Opposes Issuance of Severity Level IV Violation Based on Listed Reasons + (10:46:40, 8 January 2025)
- ML17285B291 + (10:46:41, 8 January 2025)
- ML17285B289 + (10:46:42, 8 January 2025)
- GO2-90-093, Forwards Engineering Std EES-4,Rev 0, Setpoint Methodology, as Committed in Util .W/O Encl + (10:46:43, 8 January 2025)
- GO2-90-094, Advises That Submittal of Improved Tech Spec Scheduled for Mar 1991 & Implementation Tenatively Scheduled for Oct 1991 + (10:46:44, 8 January 2025)
- ML17285B285 + (10:46:46, 8 January 2025)
- ML17285B284 + (10:46:47, 8 January 2025)
- ML17285B282 + (10:46:48, 8 January 2025)
- ML17285B279 + (10:46:49, 8 January 2025)
- ML17285B276 + (10:46:50, 8 January 2025)
- ML17285B278 + (10:46:50, 8 January 2025)
- ML17285B275 + (10:46:51, 8 January 2025)
- GO2-90-081, Advises That Util Has No Comments on Licensed Operator Annual Requalification Exam During Wks of 900226 & 0305.All Comments Resolved When Exams Administered + (10:46:52, 8 January 2025)
- IR 05000397/1990004 + (10:46:54, 8 January 2025)
- ML17285B271 + (10:46:56, 8 January 2025)
- ML17285B267 + (10:46:57, 8 January 2025)
- ML17285B269 + (10:46:57, 8 January 2025)
- GO2-90-086, Radiological Environ Monitoring Program 1989 Annual Rept for Nuclear Plant 2 + (10:46:58, 8 January 2025)
- ML17285B265 + (10:46:58, 8 January 2025)
- 05000397/LER-1990-008, :on 900416,seismic Monitoring Instrumentation Determined Inadequate.Caused by Inadequate Procedures.Vendor Requested to Provide Proper Calibr of Instrument.Plant Procedures Revised to Reflect Calibr + (10:47:00, 8 January 2025)
- TAC:76488 + (10:47:01, 8 January 2025)
- ML17285B261 + (10:47:02, 8 January 2025)