Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-91-210, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-31.Corrective Actions:Health Physics Dept Initiated Discussion Re Proper Use of Alarming Dosimeters & Procedure Re Erratic Operation of Model 415 Revised + (10:34:32, 8 January 2025)
- GO2-91-208, Forwards Affidavit from GE Declaring from GE to BWR Owners Group Re Plant Specific TS Improvement for ECCS as Proprietary,Per Application for Amend to License NPF-21, Changing TS 3/4.3.3 & Associated TS Tables + (10:34:34, 8 January 2025)
- ML17286B141 + (10:34:34, 8 January 2025)
- ML17286B136 + (10:34:36, 8 January 2025)
- ML17286B135 + (10:34:37, 8 January 2025)
- 05000397/LER-1991-027, :on 910930,question on Jet Operability & Surveillance Applicability in Operational Conditions 1 & 2 Below 25% Rated Thermal Power Raised.Caused by Inadequate Procedure.Ts Amend Request Will Be Submitted + (10:34:38, 8 January 2025)
- GO2-91-198, Advises That Mods Necessary to Implement Listed Issues Re Excess Flow Check Valve Position Display & Annunicator Alarm Intensity Per Dcrdr Completed,Per Generic Ltr 88-20 + (10:34:40, 8 January 2025)
- ML17286B131 + (10:34:40, 8 January 2025)
- ML17286B128 + (10:34:41, 8 January 2025)
- GO2-91-200, Application for Amend to License NPF-21,changing Tech Specs to Eliminate Main Steam Line Radiation Monitor Scram & MSIV Closure Functions Per GE Topical Rept NEDO-31400.Changes Will Reduce Unnecessary Plant Shut Downs + (10:34:42, 8 January 2025)
- 05000397/LER-1991-028, :on on 910930,containment Airlock Door Seal Leakage Test Not Performed within Allowable Surveillance Interval.Caused by Inadequate Personnel Work Practices. Master Startup Checklist Amended + (10:34:44, 8 January 2025)
- IR 05000346/2017010 + (10:34:46, 8 January 2025)
- GO2-91-196, Amends 911014 Response to NRC Re Violations Noted in Insp Rept 50-397/91-24 on 910715-19 & 0812-16.Corrective Actions:Pressure Regulator Repaired & Surveillance Procedure Changed to Require Prestart Checks of All Air Start Header + (10:34:47, 8 January 2025)
- ML17286B122 + (10:34:47, 8 January 2025)
- GO2-91-195, Responds to 10CFR50,App E Re Emergency Response Data Sys. Util Currently Investigating Use of Plant Prime Computer to Serve as Interface W/Nrc Sys.Emergency Response Data Sys Expected to Be Operable by 930213 + (10:34:49, 8 January 2025)
- ML17286B118 + (10:34:51, 8 January 2025)
- ML17286B119 + (10:34:51, 8 January 2025)
- ML17286B116 + (10:34:52, 8 January 2025)
- ML17286B115 + (10:34:54, 8 January 2025)
- ML17286B113 + (10:34:54, 8 January 2025)
- IR 05000397/1991028 + (10:34:57, 8 January 2025)
- ML17286B109 + (10:34:58, 8 January 2025)
- 05000397/LER-1991-026, :on 910918,main Control Room Received Alarms, Indicating RWCU HX Room High Temp & RWCU Outboard Isolation Valve Automatically Closed.Caused by Failed Electric Component.Circuit Input Card Replaced + (10:35:02, 8 January 2025)
- GO2-91-171, Provides Critical Evaluation Re Failures of Crew D During Annual Requalification Exam Administered on 910909. Contributing Factors Included,Insufficient Performance Overlap Amongst Crew Members & Training Evaluation Process + (10:35:03, 8 January 2025)
- GO2-91-187, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-24.Corrective Actions:Training Matrix Developed to Include Specific Training on Various Info Sys & Sys Walkdown Checklist Written to Document Insps + (10:35:06, 8 January 2025)
- GO2-91-178, Submits Status of Corrective Actions Associated W/Ler 91-017-00 Re Automatic Start of Diesel Generators Caused by Offsite Grid Disturbance.Operator Responsible for Mispositioned Switch Subj to Disciplinary Action + (10:35:08, 8 January 2025)
- GO2-91-188, Application for Amend to License NPF-21,revising TS 3/4.3.5 & Tables 3.3.5-1 & 4.3.5-1 Re RCIC Actuation Instrumentation & Surveillance Requirements + (10:35:10, 8 January 2025)
- ML17286B104 + (10:35:10, 8 January 2025)
- 05000397/LER-1991-025, :on 910911,train a of Containment Atmosphere Control Sys Rendered Inoperable for More than 30-day Limit Permitted by Ts.Caused by Loss of Oil from Recombiner Blower.Train a & Recombiner Blower Repaired + (10:35:12, 8 January 2025)
- 05000397/LER-1991-024, :on 910909,unanalyzed Condition Associated W/ Postulated Main Steam Line Failure Outside Containment Discovered by Ge.Caused by Failure to Consider Iodine Source Term.Procedure Re Cold Startup Changed + (10:35:14, 8 January 2025)
- GO2-91-180, Monthly Operating Rept for Sept for WNP-2 + (10:35:15, 8 January 2025)
- GO2-91-191, Responds to Generic Ltr 91-06, Adequacy of Safety-Related DC Power Supplies, Pursuant to 10CFR50.54(F).Provides Justification to Questions Listed W/No as Answer + (10:35:16, 8 January 2025)
- GO2-91-012, Provides Actions Planned for Improving Performance of Reactor Bldg post-accident Grab Sampling Sys (REA-SR-48),per Insp Rept 50-397/90-29.State-of-art in-line post-accident Monitoring Sys to Be Installed in Elevated Release Duct + (10:35:18, 8 January 2025)
- GO2-91-192, Forwards Response to NRC Re Violations Noted in Insp Rept 50-397/91-26.Corrective Actions:Containers Labeled as Required & Individuals Involved Were Counseled & Labeling Requirements Discussed + (10:35:19, 8 January 2025)
- ML17286B095 + (10:35:21, 8 January 2025)
- ML17286B093 + (10:35:22, 8 January 2025)
- ML17286B089 + (10:35:23, 8 January 2025)
- ML17286B092 + (10:35:23, 8 January 2025)
- GO2-91-184, Forwards Primary Containment 1991 Integrated Leakage Rate Test Final Rept + (10:35:24, 8 January 2025)
- 05000397/LER-1991-023, :on 910906,HPCS Sys Pump Suction Switchover from Condensate Storage Tanks to Suppression Pool Occurred During Maint Testing.Caused by Incomplete Planning & Scheduling.Operators Realigned HPCS Suction + (10:35:26, 8 January 2025)
- GO2-91-168, Provides Current Status of Corrective Actions for All Outstanding FEMA Deficiencies.One Deficiency Against Wpps Identified.Appropriate Procedures Revised & Provided to FEMA + (10:35:27, 8 January 2025)
- GO2-91-177, Forwards Rev 11 of Emergency Preparedness Plan,Reflecting Changes to Section 11.6.1,Page 11-7,Section 4.4.2.1,Page 4-26,Section 4.4.2.5,Page 4-32,Item F,Section 14.4.1,Page 14-3 & Section 6,Table A.2 + (10:35:30, 8 January 2025)
- ML17286B074 + (10:35:32, 8 January 2025)
- ML17286B073 + (10:35:33, 8 January 2025)
- ML17286B071 + (10:35:34, 8 January 2025)
- ML17286B070 + (10:35:35, 8 January 2025)
- ML17286B068 + (10:35:36, 8 January 2025)
- IR 05000397/1991034 + (10:35:37, 8 January 2025)
- ML17286B061 + (10:35:38, 8 January 2025)
- ML17286B060 + (10:35:39, 8 January 2025)
- ML17286B058 + (10:35:40, 8 January 2025)
- GO2-91-170, Forwards Topical Rept WPPSS-FTS-131, Applications Topical Rept for BWR Design & Analysis + (10:35:41, 8 January 2025)