Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17289A420 + (10:29:37, 8 January 2025)
- ML17289A418 + (10:29:38, 8 January 2025)
- 05000397/LER-1991-013-02, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-46.Corrective Actions:Quality Action Team Has Been Authorized to Recommend Potential Improvements in TS Surveillance Program,As Documented in LER 91-013-02 + (10:29:39, 8 January 2025)
- GO2-92-066, Suppls 920213 Response to Violations Noted in Insp Rept 50-397/91-44.Corrective Actions:Pipe Supports Restored to Configuration on Drawings & Missing Pipe Support Nuts Replaced & Loose Items Tightened + (10:29:40, 8 January 2025)
- 05000397/LER-1992-005, :on 920219,thermal Overloads Prevented Motors from Performing Safety Functions.Caused by Misapplication of Design Inputs.Motors Replaced + (10:29:42, 8 January 2025)
- 05000397/LER-1992-006, :on 920220,reactor Bldg to Suppression Chamber Vacuum Breaker Setpoints Were Incorrectly Set.Caused by Analysis Deficiency.Setpoint Documentation Changed & Procedures Deviated & Setpoints Reset + (10:29:43, 8 January 2025)
- ML17289A407 + (10:29:46, 8 January 2025)
- ML17289A408 + (10:29:46, 8 January 2025)
- GO2-92-064, Application for Amend to License NPF-21,revising TS 4.6.6.1.b.3 Re Primary Containment Atmosphere Control + (10:29:47, 8 January 2025)
- ML17289A405 + (10:29:47, 8 January 2025)
- GO2-92-058, Monthly Operating Rept for Feb 1992 for WPPS-2 + (10:29:53, 8 January 2025)
- ML17289A402 + (10:29:53, 8 January 2025)
- ML17289A395 + (10:29:58, 8 January 2025)
- ML17289A396 + (10:29:58, 8 January 2025)
- ML17289A394 + (10:29:59, 8 January 2025)
- ML17289A393 + (10:29:59, 8 January 2025)
- GO2-92-061, Requests Relief from Tech Specs 4.6.6.1.b.3, Containment Atmosphere Control & Provides Appropriate Acceptance Criterion + (10:30:00, 8 January 2025)
- ML17289A391 + (10:30:00, 8 January 2025)
- ML17289A389 + (10:30:04, 8 January 2025)
- IR 05000397/1992007 + (10:30:05, 8 January 2025)
- ML17289A386 + (10:30:07, 8 January 2025)
- ML17289A384 + (10:30:08, 8 January 2025)
- GO2-92-062, Responds to NRC Re Violations Noted in Insp Rept 50-397/91-42 on 911104 to 1206.Corrective Actions:Personnel Being Trained in Preparation & Review of 10CFR50.59 Reviews & Safety Evaluations + (10:30:09, 8 January 2025)
- TAC:M82488 + (10:30:12, 8 January 2025)
- ML17289A381 + (10:30:13, 8 January 2025)
- GO2-92-056, Responds to NRC Re Violations & Proposed Imposition of Civil Penalty Noted in Insp Rept 50-397/91-44 on 911104-1208.Corrective Actions:Plant Sys Operating Procedures PPM 2.3.3A/B Revised + (10:30:14, 8 January 2025)
- ML17289A379 + (10:30:16, 8 January 2025)
- GO2-92-054, Washington Nuclear Power Plant Unit 2 Annual Operating Rept + (10:30:17, 8 January 2025)
- 05000397/LER-1992-004, :on 920227,noted Scram Discharge Vol Level Switches Not Tested Post Scram as Required.Caused by Testing Not Being Performed.Corrective Actions Were Not Required + (10:30:24, 8 January 2025)
- GO2-92-053, Semiannual Radioactive Effluent Release Rept for Jul-Dec 1991 + (10:30:25, 8 January 2025)
- GO2-92-051, Advises That All Elements of Reg Guide 5.66 Implemented to Satisfy Requirements of 10CFR73.56 Re Personnel Access Authorization for Nuclear Power Plants + (10:30:28, 8 January 2025)
- ML17289A370 + (10:30:33, 8 January 2025)
- ML17289A371 + (10:30:33, 8 January 2025)
- ML17289A368 + (10:30:34, 8 January 2025)
- GO2-92-050, Responds Further to 10CFR50,Appendix E,Section VI.4.a. on Requirement to Submit Emergency Response Data Sys Plan by 911028.Util Will Use Plant Prime Computer W/New Software to Assure Compliance & 60 Min Response Per 10CFR50.72(a)(4) + (10:30:35, 8 January 2025)
- GO2-92-036, Provides Clarification of Duties of Third Staff Reactor Operator During Normal & Emergency Plant Operations + (10:30:38, 8 January 2025)
- GO2-92-043, Submits Licensee Recommendation That Crew a Participate in NRC Administered Readiness for Operation Evaluation on 920227 + (10:30:40, 8 January 2025)
- ML17289A364 + (10:30:41, 8 January 2025)
- GO2-92-049, Application for Amend to License NPF-21 for Use of Cycle 8 Reload Core,Unit 2 W/Changes to TS 2.1.2, B 2.0 & 6.9.3.2. Proposed Changes Do Not Involve Significant Hazard or Increase in Accident Probability/Consequences + (10:30:42, 8 January 2025)
- IR 05000397/1991041 + (10:30:44, 8 January 2025)
- IR 05000397/1991031 + (10:30:45, 8 January 2025)
- GO2-92-028, Forwards Results of Plant Analysis of EDR-TK-4A Split Sample Collected in Conjunction W/Ref NRC Insp Rept 50-397/91-40 + (10:30:46, 8 January 2025)
- ML17289A357 + (10:30:49, 8 January 2025)
- GO2-92-048, Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow & Effect on Cycle 8 Operation + (10:30:50, 8 January 2025)
- GO2-92-055, Forwards Fitness for Duty Program Performance Data for Jul- Dec 1991 + (10:30:51, 8 January 2025)
- GO2-92-047, Annual Personnel Monitoring Rept for 1991 + (10:30:55, 8 January 2025)
- ML17289A353 + (10:30:59, 8 January 2025)
- 05000397/LER-1992-003, :on 920123,circulating Fan CAC FN-1B Failed to Start During Performance of Surveillance Test.Caused by Tripped Overloads.Thermal Overloads Reset & Surveillance Test Performed + (10:31:00, 8 January 2025)
- ML17289A351 + (10:31:01, 8 January 2025)
- IR 05000397/1991044 + (10:31:02, 8 January 2025)
- IR 05000397/1991043 + (10:31:14, 8 January 2025)