Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-92-147, Forwards Rev 14 to WPPSS-QA-004, Operational QA Program Description, Topical Rept + (10:25:52, 8 January 2025)
- NL-17-115, Attachment 6 to NL-17-115, Revised HI-2094289, Licensing Report on the Inter-Unit Transfer of Spent Fuel at the Energy Center, Revision 9 + (10:25:55, 8 January 2025)
- ML17289A654 + (10:26:00, 8 January 2025)
- GO2-92-154, Submits Addl Info Re 920318 Application for Amend to License NPF-21,changing TS Surveillance Requirement 4.6.6.1.B.3 to Include Addl Acceptance Criterion for Temp Profile within Hydrogen Recombiner Bed,Per NRC Request + (10:26:01, 8 January 2025)
- ML17289A653 + (10:26:01, 8 January 2025)
- 05000397/LER-1992-024, :on 920519,discovered Inadvertent Emergency Ventilation Actuation.Caused by Work Practices Being Less than Adequate.Technicians Were Counseled + (10:26:09, 8 January 2025)
- GO2-92-144, Comments on 920609 Telcon Re Fuel Rod Growth in Siemens Nuclear Power (Snp) 8x8 Fuel Assemblies.Util Will Conduct Insp of Subj Assemblies During R8 Refueling Outage,In Ref to 920225 Request for Amend to TS + (10:26:11, 8 January 2025)
- ML17289A645 + (10:26:15, 8 January 2025)
- ML17289A647 + (10:26:15, 8 January 2025)
- GO2-92-143, Responds to NRC Re Violations Noted in Insp Rept 50-397/92-09.Corrective Actions:Warning Flashing Light Unit Installed & Procedure PPM 11.2.24.1 Changed + (10:26:16, 8 January 2025)
- IR 05000397/1992017 + (10:26:28, 8 January 2025)
- ML17289A640 + (10:26:29, 8 January 2025)
- ML17289A638 + (10:26:30, 8 January 2025)
- ML17289A636 + (10:26:31, 8 January 2025)
- ML17289A635 + (10:26:32, 8 January 2025)
- ML17289A633 + (10:26:33, 8 January 2025)
- ML17289A630 + (10:26:34, 8 January 2025)
- 05000397/LER-1992-014, :on 920326,920414 & 920512,engineers Identified TS Violations Associated W/Flow Measurements in Hpcs,Lpcs & RHR Sys,Respectively.Caused by Inadequate Design Analysis. Tests Performed to Verify Flows + (10:26:37, 8 January 2025)
- ML17289A626 + (10:26:38, 8 January 2025)
- ML17289A625 + (10:26:39, 8 January 2025)
- ML17289A621 + (10:26:40, 8 January 2025)
- 05000397/LER-1992-022, :on 920514,plant Engineer Determined That Labyrinth Seals Installed in Replacement CAC Blowers Were Not Environmentally Qualified.Caused by Inadequate Work Practices & Procedures.Personnel Counseled + (10:26:43, 8 January 2025)
- 05000397/LER-1992-021, :on 920513,discovered That Certain QC-2 Instruments Were Not Appropriately Isolated from QC-1.Caused by Less than Adequate Design.No Corrective Action Was Taken + (10:26:46, 8 January 2025)
- ML17289A608 + (10:26:47, 8 January 2025)
- GO2-92-130, Requests Waiver of Compliance from TS 3.6.5.1.a Re Secondary Containment Integrity & 3.6.3.a Re Primary Containment Isolation Valves,Per Generic Ltr 89-10 + (10:26:48, 8 January 2025)
- GO2-92-133, Discusses Implementation of Phase II Emergency Operating Procedures,Per Insp Rept 50-397/91-27 & Corrective Action Plan for Licensed Operator Requalification Program.Proposes That Phase I of Procedures Be Used Through Nov 1992 Exam + (10:26:49, 8 January 2025)
- GO2-92-135, Responds to NRC Re Violations Noted in Insp Rept 50-397/92-01.Corrective Actions:Degraded Voltage Calculation 2.12.58 Will Be Completed + (10:26:52, 8 January 2025)
- GO2-92-129, Special Rept:On 920420,seismic Triaxial Peak Accelerograph & Space Frame Removed to Allow Refueling of Reactor Core. Accelerometer Will Be Returned to Svc When Space Frame Reattached to Reactor Vessel Prior to Startup + (10:26:53, 8 January 2025)
- IR 05000397/1992015 + (10:26:56, 8 January 2025)
- ML17289A597 + (10:26:57, 8 January 2025)
- 05000397/LER-1992-018, :on 920428,determined That Six Locations Not Provided W/Emergency Lighting Capacity & Operator Actions Required for Fire Outside Main CR Not in Procedures.Caused by Inadequate Design.Lighting Provided + (10:26:59, 8 January 2025)
- ML17289A592 + (10:27:01, 8 January 2025)
- TAC:M79712 + (10:27:01, 8 January 2025)
- ML17289A590 + (10:27:02, 8 January 2025)
- ML17289A589 + (10:27:02, 8 January 2025)
- ML17289A586 + (10:27:03, 8 January 2025)
- ML17289A585 + (10:27:04, 8 January 2025)
- ML17289A584 + (10:27:05, 8 January 2025)
- GO2-92-126, Informs NRC That Form NRC-474 Certifying Existing WNP-2 Simulator Will Be Submitted Prior to 920630.Contractor Fabricating New Simulator Experiencing Delays.Util Prefers Recertification of Existing Simulator Over Addl Exemption + (10:27:06, 8 January 2025)
- ML17289A582 + (10:27:06, 8 January 2025)
- ML17289A580 + (10:27:08, 8 January 2025)
- ML17289A578 + (10:27:09, 8 January 2025)
- GO2-92-125, Responds to Telcon W/Wm Dean Re 901231,911015 & 920410 Applications for Amend to License NPF-21 Re Scram Discharge Vol Setpoints,Rcic Actuation Instrumentation & Surveillance Requirements & Generic Ltr 88-01,respectively + (10:27:10, 8 January 2025)
- ML17289A577 + (10:27:10, 8 January 2025)
- ML17289A574 + (10:27:12, 8 January 2025)
- ML17289A571 + (10:27:13, 8 January 2025)
- ML17289A569 + (10:27:15, 8 January 2025)
- 05000397/LER-1992-016, :on 920424,determined That RCIC Sys Not Adequately Transferred to Remote Shutdown Panel.Caused by Misapplication of Design Inputs.Power Supply for RCIC Control Sys (48-volt Dc) Will Be Modified + (10:27:16, 8 January 2025)
- 05000397/LER-1991-003, :on 910201,review of Sp for Testing Downstream Standby Gas Treatment HEPA Filters Indicated That Methods Used Not in Compliance W/Tss Due to Inadequate air-aerosol Mixing.Appropriate Procedures Modified + (10:27:17, 8 January 2025)
- GO2-92-117, Informs of Completion of Harsh Environ Setpoint Calculations for Equipment Setpoint Methodology Program Plan,Per Mar 1992 Commitment.Implementation of Equipment Setpoint Changes in Process + (10:27:18, 8 January 2025)
- TAC:M55579 + (10:27:18, 8 January 2025)