Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-94-012, Forwards Response to NRC Re Violation Noted in Insp Rept 50-397/93-48.C/As:five Individuals Described in NOV Reactivated in FFD Random Test Data Base & Emergency Response Eof/Tsc & Plant Access Personnel List Reviewed + (10:06:02, 8 January 2025)
- IR 05000397/1993047 + (10:06:04, 8 January 2025)
- ML17290A923 + (10:06:06, 8 January 2025)
- ML17290A922 + (10:06:07, 8 January 2025)
- ML17290A921 + (10:06:08, 8 January 2025)
- ML17290A919 + (10:06:09, 8 January 2025)
- ML17290A918 + (10:06:10, 8 January 2025)
- IR 05000397/1993023 + (10:06:11, 8 January 2025)
- IR 05000397/1993040 + (10:06:13, 8 January 2025)
- ML17290A913 + (10:06:15, 8 January 2025)
- ML17290A911 + (10:06:16, 8 January 2025)
- IR 05000397/1993044 + (10:06:19, 8 January 2025)
- ML17290A909 + (10:06:20, 8 January 2025)
- ML17290A905 + (10:06:22, 8 January 2025)
- ML17290A907 + (10:06:22, 8 January 2025)
- GO2-94-011, Application for Amend to License NPF-21,requesting Continued Plant Operation W/Eccs Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits of TS 3/4.3.3, ECCS Instrumentation + (10:06:23, 8 January 2025)
- GO2-94-010, Requests Discretionary Enforcement to Allow Continued Plant Operation W/Eccs Instrumentation Functional,But Not in Strict Compliance W/Requirements for Demonstrating That Response Time within Limits Specified in TS 3/4.3.3 + (10:06:24, 8 January 2025)
- GO2-94-005, Application for Amend to License NPF-21,requesting Changes to TS to Clarify Instrumentation Testing Requirements + (10:06:26, 8 January 2025)
- ML17290A899 + (10:06:26, 8 January 2025)
- GO2-94-004, Suppl to 930709 Application for Amend to License NPF-21, Increasing Licensed Power Level from 3,323 Mwt to 3,486 Mwt W/Extended Load Line Limit & Changing SRV Setpoint Tolerance to Include Changes to TS Paragraph 6.9.3.2 + (10:06:28, 8 January 2025)
- ML17290A894 + (10:06:28, 8 January 2025)
- GO2-94-001, Forwards Request for Approval to Revise WNP-2 Tornado Design Criteria Per RG 1.76 Section C.1.2 + (10:06:30, 8 January 2025)
- GO2-94-008, Monthly Operating Rept for Dec 1993 for WNP-2 + (10:06:31, 8 January 2025)
- 05000397/LER-1993-031, :on 931109,engineering Evaluation Determined That MCR HVAC Sys Will Not Maintain CR Temp.Caused by Inadequate Design Margin in Original Design.Per Written to Document Potential Analysis Concerns + (10:06:34, 8 January 2025)
- GO2-93-293, Special Rept:On 931116,loose Parts Detection Sys Channel 5 Did Not Pass Daily Channel Surveillance.Exact Cause Not Determined.Need to Provide Addl Notifications Should Other Channels Become Inoperable Not Necessary + (10:06:34, 8 January 2025)
- GO2-94-002, Provides Updated Info Re Resolution of SBO for WNP-2 + (10:06:36, 8 January 2025)
- GO2-94-006, Responds to 931026 RAI Re Power Uprate Review & Forwards Proprietary List of Glossary Terms.List Withheld + (10:06:37, 8 January 2025)
- GO2-94-003, Application for Amend to License NPF-21,requesting Rev to TS to Relocate Requirements for Seismic Monitoring Instrumentation to FSAR & Plant Procedures + (10:06:39, 8 January 2025)
- ML17290A880 + (10:06:39, 8 January 2025)
- GO2-93-301, Advises That Completion Date for Corrective Actions for Items 1 & 2 of Insp Rept 50-397/93-36 Extended to 940114. Extension Allows Related Procedures to Be Revised to Match Procedure PPM 1.3.43 + (10:06:41, 8 January 2025)
- GO2-93-297, Forwards Proprietary Evaluation of Unusual Differential Growth at Grand Gulf Unit 1, & Insp of Siemens Power Corp Fuel Assemblies at WNP-2,May 193 (EOC 8) + (10:06:42, 8 January 2025)
- GO2-93-299, Forwards Rev 12 of Emergency Preparedness Plan for WNP-1 & WNP-2 + (10:06:44, 8 January 2025)
- 05000397/LER-1992-020, :on 920508,discovered Low Elements for Low Pressure Core Spray Min Flow Control Not Properly Installed. Procedures Modified to Include Check of Instrument Startups Prior to Running Pump + (10:06:46, 8 January 2025)
- ML17290A857 + (10:06:48, 8 January 2025)
- ML17290A856 + (10:06:49, 8 January 2025)
- ML17290A855 + (10:06:51, 8 January 2025)
- ML17290A854 + (10:06:52, 8 January 2025)
- IR 05000397/1993046 + (10:06:54, 8 January 2025)
- ML17290A851 + (10:06:55, 8 January 2025)
- IR 05000397/1993043 + (10:06:58, 8 January 2025)
- ML17290A847 + (10:07:00, 8 January 2025)
- GO2-93-294, Forwards Addl Info Re Issuance of Amend 119 to License NPF-21 Re TS 3/4.3.2. Isolation Actuation Instrumentation Response Time Testing + (10:07:01, 8 January 2025)
- IR 05000397/1993042 + (10:07:04, 8 January 2025)
- ML17290A843 + (10:07:05, 8 January 2025)
- GO2-93-296, Application for Amend to License NPF-21,revising TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys + (10:07:06, 8 January 2025)
- ML17290A841 + (10:07:06, 8 January 2025)
- GO2-93-290, Special Rept:On 931126,main Control Room Received Stack Monitor Sys Trouble Annunciator & Status Display Indicated High Range Channel Failed self-test.Caused by Component Failure of Stack Monitor Detector.Replacement in Progress + (10:07:08, 8 January 2025)
- GO2-93-292, Requests That NRC Delay Review of IPE Until IPE Models Updated to Current Plant Configurations.Update Expected by 940528 + (10:07:10, 8 January 2025)
- ML17290A835 + (10:07:12, 8 January 2025)
- GO2-93-291, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-36.Corrective Actions:Ts Change Request Submitted for Removal of Ref to Listed motor-operated Valves & Licensing Program Instruction 5.0 Revised + (10:07:13, 8 January 2025)
- GO2-93-289, Responds to Violations Noted in Insp Repts 50-397/93-18, 50-397/93-24 & 50-397/93-29.Corrective Actions:Monitoring & Feedback Mechanism Enhanced by Incorporating Problem Classification Sys + (10:07:15, 8 January 2025)