Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17291A307 + (09:58:14, 8 January 2025)
- IR 05000219/2017008 + (09:58:15, 8 January 2025)
- ML17291A304 + (09:58:20, 8 January 2025)
- ML17291A298 + (09:58:21, 8 January 2025)
- 05000397/LER-1992-037, :on 920815,reactor Manually Acrammed Due to Indications of Core Instability.Caused by Unanticipated Interaction of Operating Conditions & Components.Revised Operating Strategies & Related Procedures + (09:58:24, 8 January 2025)
- 05000397/LER-1994-011, :on 940624,determined That Weekly Manual Scram Channel Functional Test Had Not Been Performed.Caused by Inadequate Communication Between Operations SRO Personnel. Programmatic Change & Counseling Personnel + (09:58:28, 8 January 2025)
- GO2-94-180, Provides Response to Request for Addl Info Re Rev 1 to GL 92-01, Reactor Vessel Structural Integrity + (09:58:28, 8 January 2025)
- 05000397/LER-1994-016, :on 940701,determined That CR Scram Time Had Not Been Conducted During Previous Outages.Caused by Nonconservative Interpretation of Ts.Two Training Programs for Plant Have Been Implemented Covering TS + (09:58:33, 8 January 2025)
- GO2-94-173, Responds to NRC Re Violation Noted in Insp Rept 50-397/94-14.Corrective Action:Transmitter Has Been Replaced Preventing Recurrence + (09:58:39, 8 January 2025)
- ML17291A290 + (09:58:39, 8 January 2025)
- ML17291A286 + (09:58:48, 8 January 2025)
- ML17291A285 + (09:58:54, 8 January 2025)
- IR 05000397/1994019 + (09:59:00, 8 January 2025)
- ML17291A283 + (09:59:06, 8 January 2025)
- ML17291A280 + (09:59:11, 8 January 2025)
- ML17291A278 + (09:59:17, 8 January 2025)
- IR 05000397/1994015 + (09:59:23, 8 January 2025)
- GO2-94-157, Responds to NRC Re Violation Noted in Insp Rept 50-397/94-18.Corrective Action:Plan Procedure PPM 1.3.10 Will Be Revised + (09:59:29, 8 January 2025)
- ML17291A273 + (09:59:29, 8 January 2025)
- IR 05000397/1994018 + (09:59:36, 8 January 2025)
- ML17291A263 + (09:59:37, 8 January 2025)
- ML17291A261 + (09:59:38, 8 January 2025)
- TAC:M89311 + (09:59:38, 8 January 2025)
- GO2-94-170, Part 21 Rept Re Westinghouse Containment Penetration Modules Scotchcast Strain Relief & Varglas Insulated Conductors. Replaced Six of 12 RPIS Scotchcast/Varglas Modules & Three Scotchcast/Okonite Modules During Refueling Outage (R-9) + (09:59:44, 8 January 2025)
- ML17291A259 + (09:59:44, 8 January 2025)
- 05000397/LER-1994-012, :on 940623,discovered Water in Bottom of Control Room Emergency Filter Unit WMA-FU-54B.Caused by Leaky Manual Isolation Valve.Revised Deluge System Valve Station Lineups + (09:59:47, 8 January 2025)
- 05000397/LER-1993-031-01, Provides Info Re WNP-2,Operating License NPF-21, LER 93-031-01,corrective Actions That Were Completed + (09:59:49, 8 January 2025)
- ML17291A246 + (09:59:55, 8 January 2025)
- ML17291A245 + (10:00:00, 8 January 2025)
- ML17291A239 + (10:00:06, 8 January 2025)
- GO2-94-163, Describes Util Planned Actions Relative to post-fire Safe Shutdown Procedures in Event of Control Room Evacuation + (10:00:12, 8 January 2025)
- ML17291A238 + (10:00:12, 8 January 2025)
- ML17291A235 + (10:00:14, 8 January 2025)
- ML17291A231 + (10:00:19, 8 January 2025)
- ML17291A229 + (10:00:25, 8 January 2025)
- ML17291A226 + (10:00:31, 8 January 2025)
- TAC:M88839 + (10:00:31, 8 January 2025)
- ML17291A224 + (10:00:37, 8 January 2025)
- GO2-94-162, Responds to NRC Re Violations Noted in Insp Rept 50-397/94-17.Corrective Actions:Initiated Immediate HP Time Out for Night Shift Personnel to Assure Awareness + (10:00:38, 8 January 2025)
- ML17291A222 + (10:00:39, 8 January 2025)
- GO2-94-156, Application for Amend to License NPF-21,revising TS W/Regard to Control Rod Scram Insertion Testing Under Emergency Circumstances + (10:00:40, 8 January 2025)
- 05000397/LER-1993-022, :on 930524,two Control Rod Withdrawal Events Were Identified as Having Violated Ts.Caused by Control Rod Maintenance & Testing Not Sufficient.Sys to Improve HCU & Control Rod Implemented + (10:00:42, 8 January 2025)
- ML17291A218 + (10:00:43, 8 January 2025)
- ML17291A217 + (10:00:43, 8 January 2025)
- GO2-94-160, Application for Amend to License NPF-21,requesting Amend to Ts,Relocating TS Table for Instrument Response Time Limits + (10:00:44, 8 January 2025)
- ML17291A214 + (10:00:45, 8 January 2025)
- GO2-94-158, Forwards Rev 0 to Core Operating Limits Rept,Cycle 10, for WNP-2 + (10:00:46, 8 January 2025)
- ML17291A210 + (10:00:48, 8 January 2025)
- ML17291A209 + (10:00:49, 8 January 2025)
- ML17291A208 + (10:00:49, 8 January 2025)
- ML17291A207 + (10:00:50, 8 January 2025)