Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17291A710 + (09:46:05, 8 January 2025)
- ML17291A708 + (09:46:07, 8 January 2025)
- 05000397/LER-1995-004, :on 950226,malfunction in Main Turbine DEH Control Sys Caused All Four High Pressure Turbine Governor Valves to Rapidly Close.Caused by Blown Fuse.Suspected Faulty Circuit Card Replaced + (09:46:09, 8 January 2025)
- ML17291A705 + (09:46:10, 8 January 2025)
- IR 05000123/2002015 + (09:46:26, 8 January 2025)
- ML17291A702 + (09:46:27, 8 January 2025)
- 05000397/LER-1995-002, :on 950218,automatic Reactor Scram Occurred. Caused by Erroneous Positioning of Control During Performance of Scheduled Periodic Functional Test.Control Repositioned + (09:46:28, 8 January 2025)
- GO2-95-054, Advises That Pr Bemis Appointed Director,Regulatory & Industry Affairs for Facility,Effective Immediately + (09:46:29, 8 January 2025)
- GO2-95-053, Special Rept:On 950305,reactor Bldg Effluent Monitoring Sys Was Inoperable for 72 Hrs.Caused by Failure of Stack Monitor Detector.Stack Monitor Returned to Svc on 950314 + (09:46:31, 8 January 2025)
- ML17291A695 + (09:46:33, 8 January 2025)
- ML17291A694 + (09:46:34, 8 January 2025)
- ML17291A693 + (09:46:35, 8 January 2025)
- ML17291A691 + (09:46:36, 8 January 2025)
- GO2-95-048, Monthly Operating Rept for Feb 1994 for WNP-2 + (09:46:37, 8 January 2025)
- ML17291A690 + (09:46:37, 8 January 2025)
- ML17291A686 + (09:46:40, 8 January 2025)
- ML17291A687 + (09:46:40, 8 January 2025)
- GO2-95-047, Forwards WNP-2 Cycle 10 COLR, COLR 94-10,Rev 2.Rev Incorporates Extended Single Loop Max Average Planar Linear Heat Generation Rate Limits for SPC 9x9 Reload & Lead Fuel Assembly Fuel + (09:46:41, 8 January 2025)
- ML17291A682 + (09:46:43, 8 January 2025)
- 05000397/LER-1994-018, :on 941115,util Failed to Comply W/Ts Action Requirement While Inoperable Control Rod Block Instrumentation Resulted in Exceeded Allowed Outage Time. Placed Channel a Trip Function in Tripped Condition + (09:46:44, 8 January 2025)
- 05000397/LER-1994-018-01, Forwards LER 94-018-01,incorporating New Findings,Corrective Actions & Updates of Original Info + (09:46:46, 8 January 2025)
- GO2-95-042, Washington Nuclear Plant 2 Annual Operating Rept 1994. W/ + (09:46:48, 8 January 2025)
- GO2-95-044, Washington Public Power Supply Sys 1994 Annual Rept. W/ + (09:46:51, 8 January 2025)
- IR 05000130/2002003 + (09:46:54, 8 January 2025)
- ML17291A673 + (09:46:55, 8 January 2025)
- RAIO-1017-56676, LLC - Response to NRC Request for Additional Information No. 193 (Erai No. 9079) on the NuScale Design Certification Application + (09:46:56, 8 January 2025)
- ML17291A671 + (09:46:58, 8 January 2025)
- ML17291A666 + (09:46:59, 8 January 2025)
- ML17291A665 + (09:46:59, 8 January 2025)
- GO2-95-039, Forwards WNP-2 Radioactive Effluent Release Rept Jan-Dec 1994 & Amend 17 to WNP-2 Odcm + (09:47:00, 8 January 2025)
- ML17291A659 + (09:47:02, 8 January 2025)
- 05000397/LER-1995-003, :on 940817,CR Indication Lost for PASS Inboard Ci Valve & Cycling for Restoration Erratic & Showed Continuous Closed Indication.Caused by Unclear TS Requirement.Ts Bases Will Be Revised + (09:47:03, 8 January 2025)
- GO2-95-032, Discusses Ref Ltr, ,advising NRC of Planned Extension of First 10-year IST & Isi.Second 10-year IST Implemented on 950113 & Second 10-year ISI Implemented on 950210 + (09:47:04, 8 January 2025)
- GO2-95-035, Forwards Fitness for Duty Semiannual Performance Data Rept for Jul-Dec 1994 + (09:47:06, 8 January 2025)
- ML17291A654 + (09:47:09, 8 January 2025)
- GO2-95-031, Provides Suppl Info to Util Request for Amend to TS for Jet Pump Operability.Informs That Change Would Modify Surveillance Acceptance Criteria from 10% to 20% for Individual Jet Pump diffuser-to-lower Plenum Pressure + (09:47:10, 8 January 2025)
- ML17291A648 + (09:47:11, 8 January 2025)
- 05000397/LER-1995-001, :on 950113,failed to Satisfy Single Failure Criteria for Containment Isolation Function Due to Electrical Separation Plate in Control Panel Missing. Replaced Missing Barrier + (09:47:12, 8 January 2025)
- ML17291A646 + (09:47:14, 8 January 2025)
- GO2-95-028, Monthly Operating Rept for Jan 1995 for WNP 2 + (09:47:15, 8 January 2025)
- ML17291A644 + (09:47:15, 8 January 2025)
- TAC:M82996 + (09:47:16, 8 January 2025)
- GO2-95-026, Informs That Licensee Discontinuing Pole Drop Testing & Justification for Continued Operation Re Emergency DG-2 Shorted Turns,Justification for Continued Operation + (09:47:17, 8 January 2025)
- IR 05000397/1994024 + (09:47:18, 8 January 2025)
- ML17291A635 + (09:47:20, 8 January 2025)
- ML17291A640 + (09:47:20, 8 January 2025)
- TAC:M87807 + (09:47:21, 8 January 2025)
- ML17291A631 + (09:47:22, 8 January 2025)
- ML17291A632 + (09:47:22, 8 January 2025)
- ML17291A629 + (09:47:23, 8 January 2025)
- IR 05000397/1994029 + (09:47:24, 8 January 2025)