Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17301A145 + (08:06:32, 8 January 2025)
- ML17301A143 + (08:06:33, 8 January 2025)
- L-84-372, Rev 0 to Emergency Plan Implementing Procedure 1302, Offsite Emergency Organization Psl Core Damage Assessment + (08:06:34, 8 January 2025)
- L-84-347, Forwards Rev 3 to Fire Hazard Analysis & Requests Formal Disposition of Deviations by First Wk in Jan 1985 to Resolve Items for Feb 1985 Audit + (08:06:35, 8 January 2025)
- ML17301A138 + (08:06:37, 8 January 2025)
- L-84-260, Forwards Addl Info Re 800808 Rev 1 to RCS Asymmetric LOCA Loads Evaluation, Per NRC 840531 Request + (08:06:38, 8 January 2025)
- TAC:54463 + (08:06:39, 8 January 2025)
- ML17301A130 + (08:06:40, 8 January 2025)
- L-84-247, Notifies That Status of Efforts & Future Plans Re Response to NRC Questions on Procedure Generation Package for Emergency Operating Procedures Will Be Provided by 850201 + (08:06:41, 8 January 2025)
- ML17301A124 + (08:06:42, 8 January 2025)
- L-84-237, Application to Amend License DPR-67,revising Tech Specs to Supply Flow Rates & Tolerances for Each of Two Sodium Hydroxide (Naoh) Sources.Fee Paid.No Significant Hazards Evaluation Encl + (08:06:43, 8 January 2025)
- ML17301A118 + (08:06:44, 8 January 2025)
- L-84-219, Forwards Addl Info Re Spent Fuel Rack Submittal & Summary of 840816 Meeting Re Fuel Rack Structural Analysis,In Response to 840713 Request + (08:06:45, 8 January 2025)
- L-84-186, Forwards Rev 2 to Updated FSAR for St Lucie,Unit 1 & List of Plant Changes/Mods + (08:06:47, 8 January 2025)
- L-84-179, Forwards Addl Info Re Inservice Testing Program for Pumps & Valves,Per 840412 Request + (08:06:48, 8 January 2025)
- L-84-162, Forwards Documentation of Resolution of Deficiencies Noted in 830228 SER Re Environ Qualification of safety-related Electrical Equipment,As Discussed W/Nrc During 840508 Meeting.Requests Ssers Be Issued + (08:06:50, 8 January 2025)
- L-84-148, Application for Amend to License NPF-16,revising Tech Specs to Reflect Changes Required to Commence Cycle 2 Operation. Affidavit,Reload Safety Evaluation Summary & Reload Safety Rept Encl.App I to Rept Withheld (Ref 10CFR2.790) + (08:06:52, 8 January 2025)
- L-84-133, Application for Amend to License NPF-16,revising Tech Specs to Extend Subgroup Test Interval from 6 to 18 Months + (08:06:53, 8 January 2025)
- L-84-134, Application for Amend to License DPR-67,providing Operability Requirements for RCS Vents,Per Generic Ltr 83-37.License Fee Not Required + (08:06:55, 8 January 2025)
- ML17301A097 + (08:06:56, 8 January 2025)
- ML17301A096 + (08:06:57, 8 January 2025)
- ML17301A094 + (08:06:58, 8 January 2025)
- ML17301A092 + (08:06:59, 8 January 2025)
- L-83-603, Forwards Rev 2 to Fire Hazard Analysis + (08:07:00, 8 January 2025)
- ML17301A091 + (08:07:00, 8 January 2025)
- L-83-583, Forwards Evaluation of Irradiated Capsule W-97:Reactor Vessel Matls Irradiated Surveillance Program + (08:07:02, 8 January 2025)
- L-83-566, Forwards Amend 14 to Fsar,Consisting of Info Contained in Responses to OL Review Questions,Updated Fire Protection Program to Reflect Current App R & App a Commitments & Revised P&Ids,General Arrangement & HVAC Flow Diagrams + (08:07:03, 8 January 2025)
- L-82-105, Semiannual Radioactive Effluent Release Rept,Jul-Dec 1982 + (08:07:05, 8 January 2025)
- L-83-542, Forwards St Lucie 2 Startup Test Rept, Per Tech Spec 6.9.1.3 + (08:07:06, 8 January 2025)
- L-83-483, Forwards Class II Fee for 830825 Application for License Amend Re Peaking Factor & Load Follow Peaking Penalty + (08:07:08, 8 January 2025)
- ML17301A058 + (08:07:08, 8 January 2025)
- ML17301A062 + (08:07:08, 8 January 2025)
- L-83-460, Application to Amend License DPR-67,changing Tech Specs to Modify Peaking Factors Consistent W/Current Methodology & Unit 2 Tech Specs & Deleting Load Follow Power Peaking Penalties.Safety Evaluation Encl + (08:07:10, 8 January 2025)
- ML17301A052 + (08:07:11, 8 January 2025)
- L-83-439, Forwards Response to 830609 & 10 Requests for Addl Info Re NUREG-0737,Items II.F.4,5,6,SAS Computer Scan Rates & Hydrogen Monitoring Sys + (08:07:12, 8 January 2025)
- L-83-399, Forwards Final Response to NRC Re Purge Valve Operability.Revised Purge Valve Rept Addresses Remaining NRC Concerns Re Operability of 48-inch Containment Purge Valves for Facility + (08:07:14, 8 January 2025)
- ML17301A049 + (08:07:14, 8 January 2025)
- ML17301A046 + (08:07:15, 8 January 2025)
- L-83-349, Application to Amend License NPF-16 Revising Tech Spec Requirement for Primary & Secondary Coolants in Steam Generator to Be Greater than 100 F When Coolant Pressure Greater than 200 Psig.Ser Encl + (08:07:16, 8 January 2025)
- L-83-348, Advises That License Conditions for 5% Power Completed. Power Ascension Will Be Commenced Upon Completion of Low Power Physics Testing + (08:07:18, 8 January 2025)
- ML17301A043 + (08:07:18, 8 January 2025)
- ML17301A041 + (08:07:20, 8 January 2025)
- ML17301A039 + (08:07:21, 8 January 2025)
- ML17301A037 + (08:07:22, 8 January 2025)
- ML17301A038 + (08:07:22, 8 January 2025)
- L-83-248, Application for Amend to License NPF-16 Revising Requirements for Both Primary & Secondary Coolants in Steam Generator Pressure/Temp Limits & Neutron Flux Monitor Surveillance + (08:07:23, 8 January 2025)
- L-83-231, Provides Util Position Re Use of Flame Impingement Shields Inside Containment for Protecting Cable Trays.Evaluation Delineates Trays Requiring Protection & Matl to Be Used.Addl Level of Fire Protection to Be Installed Inside Containment + (08:07:25, 8 January 2025)
- ML17301A029 + (08:07:27, 8 January 2025)
- L-83-160, Forwards Suppl a to Independent Verification of Design & Const for St Lucie Unit 2 Nuclear Generating Station, Resolution of Discrepancies & Corrective Action Plans + (08:07:28, 8 January 2025)
- ML17301A026 + (08:07:29, 8 January 2025)
- L-83-133, Forwards Responses to Generic Ltr 82-28 Re Inadequate Core Cooling Sys for Facility.W/Five Oversize Drawings.Aperture Cards Are Available in PDR + (08:07:30, 8 January 2025)