Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203P605 + (01:51:55, 8 December 2024)
- ML20203P604 + (01:51:56, 8 December 2024)
- ML20203P602 + (01:51:57, 8 December 2024)
- ML20203P600 + (01:51:58, 8 December 2024)
- ML20203P599 + (01:51:59, 8 December 2024)
- 05000249/LER-1986-003-08, :on 860403,power Lost to 4 Kv Emergency Bus 34-1 Resulting in Reactor Bldg Ventilation Sys Isolation. Caused by Personnel Leaving Relay Trip Check Open.Event Reviewed W/Responsible Individual + (01:52:01, 8 December 2024)
- ML20203P595 + (01:52:06, 8 December 2024)
- ML20203P597 + (01:52:06, 8 December 2024)
- ML20203P593 + (01:52:07, 8 December 2024)
- ML20203P592 + (01:52:07, 8 December 2024)
- ML20203P589 + (01:52:09, 8 December 2024)
- ML20203P591 + (01:52:09, 8 December 2024)
- ML20203P588 + (01:52:10, 8 December 2024)
- ML20203P586 + (01:52:10, 8 December 2024)
- ML20203P585 + (01:52:11, 8 December 2024)
- ML20203P583 + (01:52:11, 8 December 2024)
- ML20203P581 + (01:52:12, 8 December 2024)
- 05000237/LER-1986-009-06, :on 860401,seismic Evaluation of Control Room Panels Revealed That Panels Not Positively Mounted to Floor.Caused by Installation Discrepancy.Bolts & Tack Welds Installed on Panels + (01:52:14, 8 December 2024)
- ML20203P577 + (01:52:15, 8 December 2024)
- ML20203P575 + (01:52:16, 8 December 2024)
- ML20203P573 + (01:52:17, 8 December 2024)
- ML20203P571 + (01:52:18, 8 December 2024)
- ML20203P569 + (01:52:18, 8 December 2024)
- ML20203P564 + (01:52:21, 8 December 2024)
- ML20203P563 + (01:52:22, 8 December 2024)
- 05000327/LER-1986-010-01, :on 860406,fuse Inadvertently Dislodged, Starting Diesel Generators 1A-A & 2A-A.Caused When Assistant Unit Operator Attempted to Verify Fuse Size.Procedure Will Be Revised to Add Caution Re Fuse Removal + (01:52:24, 8 December 2024)
- ML20203P556 + (01:52:25, 8 December 2024)
- ML20203P555 + (01:52:26, 8 December 2024)
- ML20203P553 + (01:52:26, 8 December 2024)
- ML20203P552 + (01:52:27, 8 December 2024)
- ML20203P551 + (01:52:28, 8 December 2024)
- ML20203P548 + (01:52:29, 8 December 2024)
- ML20203P541 + (01:52:33, 8 December 2024)
- ML20203P540 + (01:52:34, 8 December 2024)
- ML20203P537 + (01:52:35, 8 December 2024)
- IR 05000020/1986001 + (01:52:37, 8 December 2024)
- ML20203P532 + (01:52:37, 8 December 2024)
- ML20203P529 + (01:52:38, 8 December 2024)
- ML20203P531 + (01:52:38, 8 December 2024)
- TXX-4761, Final Deficiency Rept CP-85-45 Re Use of Core Boring Equipment During Installation of Shear Lugs.Initially Reported on 850926.Issue Not Reportable Per 10CFR50.55(e) + (01:52:39, 8 December 2024)
- ML20203P524 + (01:52:40, 8 December 2024)
- ML20203P521 + (01:52:41, 8 December 2024)
- ML20203P519 + (01:52:41, 8 December 2024)
- ML20203P518 + (01:52:42, 8 December 2024)
- TXX-4523, Final Deficiency Rept SDAR-171 Re Reliance Electric Co Control Boards That Differ from Boards Described in Environ Qualification Rept.Initially Reported on 850226.Item Not Reportable Per 10CFR50.55(e) + (01:52:42, 8 December 2024)
- TXX-4764, Part 21 & Interim Deficiency Rept CP-86-15 Re Tdi Field Flash & K1 Relays Provided W/Rating That Does Not Meet Spec Requirements.Initially Reported on 860314.Evaluation Continuing.Next Rept Expected by 860516 + (01:52:43, 8 December 2024)
- TXX-4762, Interim Deficiency Rept CP-86-07 Re Weld Failure & Coating Degradation in Svc Water Sys.Initially Reported on 860124. Connected Pipe Nipple Lengthened to Add Flexibility & Eliminate Stress Riser.Final Rept Expected by 860730 + (01:52:44, 8 December 2024)
- IR 05000354/1986025 + (01:52:49, 8 December 2024)
- ML20203P508 + (01:52:49, 8 December 2024)
- ML20203P505 + (01:52:50, 8 December 2024)
- ML20203P504 + (01:52:51, 8 December 2024)