Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17340A643 + (17:44:55, 7 January 2025)
- ML17340A644 + (17:44:55, 7 January 2025)
- ML17340A642 + (17:44:57, 7 January 2025)
- ML17340A641 + (17:44:57, 7 January 2025)
- ML17340A639 + (17:44:59, 7 January 2025)
- ML17340A633 + (17:45:00, 7 January 2025)
- ML17340A638 + (17:45:00, 7 January 2025)
- ML17340A623 + (17:45:01, 7 January 2025)
- ML17340A631 + (17:45:01, 7 January 2025)
- ML17340A622 + (17:45:02, 7 January 2025)
- ML17340A621 + (17:45:02, 7 January 2025)
- ML17340A620 + (17:45:03, 7 January 2025)
- L-80-423, Forwards Response to IE Bulletin 80-08 Re Containment Liner Penetration Weld Examination.Defects Found in Welds Have Been Repaired & re-examined.Table of Nondestructive Examination Results Encl + (17:45:05, 7 January 2025)
- ML17340A615 + (17:45:05, 7 January 2025)
- ML17340A613 + (17:45:07, 7 January 2025)
- L-80-409, Responds to IE Bulletin 80-23.Facilities Do Not Use Valcor Solenoid Valves W/Part Numbers V70900-21-1 & 21-3 + (17:45:08, 7 January 2025)
- ML17340A611 + (17:45:10, 7 January 2025)
- ML17340A610 + (17:45:11, 7 January 2025)
- ML17340A609 + (17:45:12, 7 January 2025)
- ML17340A607 + (17:45:14, 7 January 2025)
- L-80-403, Requests Extension Until 810130 to Respond to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. Addl Time Needed to Contact All Suppliers + (17:45:15, 7 January 2025)
- ML17340A603 + (17:45:17, 7 January 2025)
- ML17340A601 + (17:45:18, 7 January 2025)
- IR 05000250/1980034 + (17:45:19, 7 January 2025)
- ML17340A598 + (17:45:20, 7 January 2025)
- 05000250/LER-1980-027-01, /01T-0:on 801212,motor Operated Valve in Sample Line from Steam Generator 3A Found Closed,Precluding Generator Monitoring.Caused by Valve Operator Inadvertently Closing Valve During Maint + (17:45:22, 7 January 2025)
- 05000250/LER-1980-026-01, /01T-0:on 801211,125-volt Dc Battery 4B Out of Svc for Approx 25-h.Caused by Servicing for Annual Discharge Test.Battery Returned to Full Charge + (17:45:27, 7 January 2025)
- 05000250/LER-1980-027, Forwards LER 80-027/01T-0 + (17:45:28, 7 January 2025)
- 05000250/LER-1980-026, Forwards LER 80-026/01T-0 + (17:45:30, 7 January 2025)
- 05000250/LER-1980-025-01, /01T-0:on 801203,AE Advised That Insp Per IE Bulletin 79-14 Revealed Potential Deficiency in Support of Accumulator Nozzles 3A & 3B During Seismic Event.Caused by Max Stress Exceeding Acceptance Criteria + (17:45:32, 7 January 2025)
- 05000250/LER-1980-025, Forwards LER 80-025/01T-0 + (17:45:33, 7 January 2025)
- ML17340A588 + (17:45:35, 7 January 2025)
- ML17340A587 + (17:45:36, 7 January 2025)
- IR 05000250/1980029 + (17:45:37, 7 January 2025)
- ML17340A582 + (17:45:38, 7 January 2025)
- ML17340A571 + (17:45:40, 7 January 2025)
- ML17340A573 + (17:45:40, 7 January 2025)
- ML17340A570 + (17:45:41, 7 January 2025)
- ML17340A569 + (17:45:41, 7 January 2025)
- IR 05000250/1980030 + (17:45:43, 7 January 2025)
- ML17340A566 + (17:45:44, 7 January 2025)
- ML17340A559 + (17:45:44, 7 January 2025)
- L-80-340, Application to Amend Licenses DPR-31 & DPR-41,moving One Sample Location from Onsite Location T79 to Onsite Location T72,due to High Potential for Oil Contamination at Old Location + (17:45:45, 7 January 2025)
- L-80-427, Forwards Proposed Amend to App a of Licenses DPR-31 & DPR-41,to Provide for Redundancy in Decay Heat Removal Sys for All Modes of Reactor Operation,In Response to NRC 800611 Request + (17:45:47, 7 January 2025)
- ML17340A555 + (17:45:47, 7 January 2025)
- ML17340A552 + (17:45:49, 7 January 2025)
- 05000250/LER-1980-022-03, /03L-0:on 801103,control Rod M-8 (in Control Bank D) Dropped During Power Operation.Cause Unknown.Rod Retrieved & Unit Returned to Full Power Per Approved Procedures + (17:45:51, 7 January 2025)
- 05000251/LER-1980-014-01, /01T-0:on 801126,insp Per IE Bulletin 79-14 Revealed Deficiency in Portions of Accumulator & RHR Sys Piping Inside Containment.Calculated Max Stress Exceeded Criteria.Mod Will Be Made Before Unit Returns to Svc + (17:45:53, 7 January 2025)
- 05000250/LER-1980-022, Forwards LER 80-022/03L-0 + (17:45:56, 7 January 2025)
- 05000251/LER-1980-014, Forwards LER 80-014/01T-0 + (17:45:57, 7 January 2025)
- L-80-425, Forwards Security Plan Info Re Protected Area Boundary at Facilities.Info Withheld (Ref 10CFR2.790) + (17:45:58, 7 January 2025)