Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17341B331 + (17:22:04, 7 January 2025)
- L-82-336, Forwards Repts of Steam Generator Insp & Tube Repair - Jul 1982 Outage + (17:22:05, 7 January 2025)
- ML17341B328 + (17:22:19, 7 January 2025)
- L-82-334, Application for Amend to Licenses DPR-31 & DPR-41,revising Tech Spec Tables 3.5-2 Re Emergency buses,3.5-4 Re Undervoltage Relay Setpoints & 4.1-1 Re 4.16-kV & 480-volt Load Ctr Test Requirements + (17:22:20, 7 January 2025)
- L-82-312, Forwards Public Version of Emergency Plan Implementing Procedure 20126, Offsite Dose Calculations, Per 820727 Telcon + (17:22:22, 7 January 2025)
- ML17341B323 + (17:22:27, 7 January 2025)
- L-82-324, Informs That Info Requested in Re NUREG-0737, Item II.B.3, Post-Accident Sampling Sys, Will Be Transmitted on or Before 821115 + (17:22:29, 7 January 2025)
- ML17341B322 + (17:22:29, 7 January 2025)
- L-82-330, Advises That Radiological Effluent Tech Spec & Offsite Dose Calculation Manual Will Be Submitted by 820910 + (17:22:31, 7 January 2025)
- ML17341B319 + (17:22:40, 7 January 2025)
- ML17341B311 + (17:22:41, 7 January 2025)
- ML17341B310 + (17:22:42, 7 January 2025)
- W3F1-2017-0083, License Renewal Application Supplement Clarification + (17:22:45, 7 January 2025)
- L-82-295, Forwards Turkey Point Units 3 & 4 Updated Fsar,Vols 1-4 + (17:22:49, 7 January 2025)
- L-82-293, Responds to Requesting Clarification of NUREG- 0737,Item II.K.3.25, Loss of AC Power to Reactor Coolant Pump Seals. Component Cooling Water Sys Exchange Is Automatically Restored During Event + (17:22:54, 7 January 2025)
- ML17341B275 + (17:23:02, 7 January 2025)
- L-82-281, Forwards Reactor Containment Bldg Integrated Leak Rate Test,Types A,B & C + (17:23:03, 7 January 2025)
- L-82-275, Responds to 820701 Request for Submittal Addressing Functionability of Pressurizer Safety Valves & Power Operated Relief Valves,Required by NUREG-0737,Item II.D.1.A. Final Safety Valve Evaluation Will Be Sent by 820901 + (17:23:04, 7 January 2025)
- L-82-276, Submits Suppl 2 of Response to Generic Ltr 82-05 Re Progress in Completing post-TMI Items II.B.2, Plant Shielding, II.B.3, Post-Accident Sampling Capability, II.F.1.6 & II.F.1.4, Containment Hydrogen & Pressure Monitors + (17:23:06, 7 January 2025)
- L-82-258, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 20101 Re Duties of Emergency coordinator,20106 Re Natural Emergencies & 20107 Re Fire & Explosion Emergencies + (17:23:08, 7 January 2025)
- ML17341B261 + (17:23:13, 7 January 2025)
- ML17341B259 + (17:23:17, 7 January 2025)
- L-82-268, Provides Results of Engineering Evaluation of Loss of Ventilation on Components in Critical Areas During Loss of Ac Power.Loss of Ventilation Will Not Affect Capability to Maintain Coolant Inventory & Heat Removal + (17:23:18, 7 January 2025)
- L-82-265, Advises That Completion of Const Project Described in to NRC Delayed Until 820816,due to Unforeseen Engineering & Procurement Problems + (17:23:19, 7 January 2025)
- L-82-263, Responds to NRC 820524 Request for Addl Info Re NUREG-0737, Items I.A.2.1, Upgrading Senior Reactor Operator & Reactor Operator Training, & II.B.4, Training to Mitigate Core Damage + (17:23:31, 7 January 2025)
- L-82-271, Responds to Generic Ltr 82-10, Post-TMI Requirements. Status Provided for Items I.A.1.3.1 Re Limitations on overtime,I.A.1.4.2 Re Min Shift Crew & I.D.1 Re Control Room Design Review + (17:23:36, 7 January 2025)
- ML17341B249 + (17:23:37, 7 January 2025)
- L-82-252, Forwards Check for Payment of Proposed License Amend Re safety-related Snubbers + (17:23:38, 7 January 2025)
- L-82-250, Forwards Revision 5 to Topical QA Rept FPL-NQA-100, QA Manual. Revision Includes Latest Organization Changes Submitted on 810928 & New Reg Guide & ANSI Std Commitments Requested & Approved in Facility SER + (17:23:40, 7 January 2025)
- ML17341B242 + (17:23:40, 7 January 2025)
- L-82-245, Forwards Response to NRC 820316 Preliminary Questions Re Inservice Insp Program + (17:23:45, 7 January 2025)
- ML17341B235 + (17:23:50, 7 January 2025)
- L-82-244, Application to Amend App a of Licenses DPR-31 & DPR-41, Adding safety-related Mechanical Snubbers to Table 3.13-1 + (17:23:53, 7 January 2025)
- ML17341B230 + (17:24:02, 7 January 2025)
- ML17341B229 + (17:24:11, 7 January 2025)
- ML17341B228 + (17:24:13, 7 January 2025)
- ML17341B226 + (17:24:19, 7 January 2025)
- L-82-241, Submits Revised Schedules for Implementation of NUREG-0737, Items II.B.2,II.B.3 & II.F.1,per Generic Ltr 82-05 + (17:24:20, 7 January 2025)
- L-82-236, Forwards Final Radiological Progress Rept(5),810624- 820407 + (17:24:22, 7 January 2025)
- ML17341B224 + (17:24:22, 7 January 2025)
- L-82-240, Forwards Initial Response to NRC 820428 & 0503 Requests for Addl Info Re Control Room Habitability Requirements of NUREG-0737,Item III.D.3.4.Response to Questions 1 & 2 Will Be Submitted by 820716 + (17:24:24, 7 January 2025)
- L-82-235, Discusses 820518 Meeting Re App R Fire Protection Submittal Dates.Util Attempting to Provide Unit 1 App R Fire Protection Submittal Before 820701 to Provide Addl Review Time Prior to in of Industry Submittals on 820701 + (17:24:26, 7 January 2025)
- ML17341B220 + (17:24:26, 7 January 2025)
- ML17341B213 + (17:24:29, 7 January 2025)
- ML17341B212 + (17:24:30, 7 January 2025)
- ML17341B210 + (17:24:31, 7 January 2025)
- ML17341B205 + (17:24:32, 7 January 2025)
- L-82-225, Forwards Addl Info Requested 820329 Re Response to IE Bulletin 80-11, Masonry Wall Design + (17:24:33, 7 January 2025)
- ML17341B200 + (17:24:33, 7 January 2025)
- L-82-220, Forwards Response to 820409 Request for Addl Info Re Seismic Qualification of Auxiliary Feedwater Sys + (17:24:35, 7 January 2025)
- L-82-229, Forwards Emergency Operating Procedure 20002.2 on Loss of Secondary Coolant,Referred to in .(Ref IE Bulletin 80-04) + (17:24:37, 7 January 2025)