Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-87-471, Forwards Revised Response to Violations Noted in Insp Repts 50-250/87-41 & 50-251/87-41,per Util .Rev Corrects Inaccurate Dates Provided in Section 5 of Original Response. Mods Performed in 1981-82 Tested on 870902 + (16:55:58, 7 January 2025)
- 05000250/LER-1987-029, :on 871015,determined That Waste Gas Sys Operated in Configuration Not Described in Fsar.Caused by Inadequate Procedural Rev.Procedure 3/4-OP-47.1 Revised to Ensure That Valve 4627 Closed + (16:56:02, 7 January 2025)
- L-87-472, Revises Response to Violation Example E.2 from Insp Repts 50-250/86-33 & 50-251/86-33.AP 0103.32 Re Reactor Cold Shutdown Conditions Reviewed & Revised to Clarify Requirements for RHR Loop Operability + (16:56:03, 7 January 2025)
- ML17342B026 + (16:56:06, 7 January 2025)
- ML17342B025 + (16:56:08, 7 January 2025)
- ML17342B023 + (16:56:15, 7 January 2025)
- 05000250/LER-1987-028, :on 871015,discovered That Required Tech Spec Surveillance of Control Rod Positions Missed During Peak Shift on 870912.Caused by Personnel Error.Personnel Counseled.Logs Being Reviewed for Improvement + (16:56:16, 7 January 2025)
- L-87-460, Forwards Select Sys Assessment Progress Summary for Oct 1987 + (16:56:18, 7 January 2025)
- 05000251/LER-1987-024-01, :on 871008,temp for Boric Acid Heat Tracing Circuit Number 6 Decreased Below 145 F.Caused by Cold Flushing of Crosstie Line.Flushing of Boric Acid Pump Crosstie Line Stopped & Sys Alignment Restored + (16:56:21, 7 January 2025)
- ML17342B019 + (16:56:23, 7 January 2025)
- IR 05000250/1987035 + (16:56:24, 7 January 2025)
- L-87-451, Forwards Procedure 0-ADM-019, Mgt on Shift (Mos), Weekly Summary Rept for Wk Starting 871024,per NRC 871019 Order. Program Will Continue Until Review of Results of Independent Appraisal Program Completed + (16:56:25, 7 January 2025)
- L-87-447, Informs of Rev to Inservice Test Program to Provide for Testing Certain Safety Injection Valves at Cold Shutdown When RCS Depressurized & Vented & During Each Refueling Outage.Revised Relief Request Bases 3,4 & 8 Encl + (16:56:27, 7 January 2025)
- ML17342B013 + (16:56:31, 7 January 2025)
- IR 05000250/1987042 + (16:56:33, 7 January 2025)
- ML17342B011 + (16:56:35, 7 January 2025)
- L-87-450, Special Rept:Several Impairments Incurred During Alternate Shutdown Mods,Including Impairments Opened Prior to Nov & Stayed Open for Longer than Required Per Tech Specs. Compensatory Measures Continue + (16:56:37, 7 January 2025)
- ML17342B009 + (16:56:37, 7 January 2025)
- ML17342B007 + (16:56:42, 7 January 2025)
- ML17342B005 + (16:56:43, 7 January 2025)
- L-87-435, Informs of Util Intent to Use ASME Boiler & Pressure Vessel Code Case N-237-2, Hydrostatic Testing of Internal Piping, Section Iii,Div I,Classes 2 & 3 for Second 10-yr Insp Intervals,Per Reg Guide 1.84 + (16:56:44, 7 January 2025)
- 05000250/LER-1987-026, :on 871002,discovered That Hydrogen Recombiner Line Inadequately Tested After Piping Mod.Caused by Deletion of Requirement for Testing in Administrative Site Procedure ASP-2.Recombiner Line Tested & ASP-2 Revised + (16:56:46, 7 January 2025)
- ML17342B002 + (16:56:49, 7 January 2025)
- ML17342B000 + (16:56:50, 7 January 2025)
- L-87-436, Forwards Supplemental Response to IE Bulletin 80-11 in Response to Request for Addl Info Made in Insp Repts 50-250/87-21 & 50-251/87-21 + (16:56:51, 7 January 2025)
- 05000250/LER-1987-027, :on 870930,containment Vent Isolation Logic Actuated Due to Radiation Monitor Increase Above Setpoint. Caused by Transport of Contaminated Filter Through Auxiliary Bldg.Procedures Revised to Prevent Recurrence + (16:56:54, 7 January 2025)
- L-87-443, Forwards Procedure 0-ADM-019, Mgt on Shift, Per NRC 871019 Order.Augmented Mgt on Shift Program Initiated on 871024.Util Understands That No Further Order Associated Restrictions Prevent Plant from Entering Mode 2 Startup + (16:56:55, 7 January 2025)
- ML17342A997 + (16:56:55, 7 January 2025)
- L-87-437, Responds to Violations Noted in Insp Repts 50-250/87-36 & 50-251/87-36.Corrective Actions:Procedures 3/4-OP-038.1, Preparation for Refueling Activities & 3/4-OP-040.3, Refueling Preshuffle in Spent Fuel Pit Revised + (16:56:57, 7 January 2025)
- L-87-431, Forwards Responses to Chemistry Survey Concerning Feedwater & Condensate Sys.Daily Chemistry Records Retrieved from Microfilm & Averaged to Determine Yearly Values.Effort Required Five man-wks + (16:56:59, 7 January 2025)
- L-87-426, Forwards Sept 1987 Progress Summary of Select Sys Assessment.Responsibility of Mgt & Coordination of Performance Enhancement Project Activities Assigned to Jk Hays as Result of Reassignment + (16:57:01, 7 January 2025)
- ML17342A991 + (16:57:04, 7 January 2025)
- ML17342A990 + (16:57:05, 7 January 2025)
- ML17342A988 + (16:57:06, 7 January 2025)
- ML17342A987 + (16:57:08, 7 January 2025)
- 05000250/LER-1987-024, :on 870913,reactor Controls Manipulated by Nonlicensed Person Under Supervision of Licensed Operator. Caused by Personnel Error.Personnel Counseled + (16:57:09, 7 January 2025)
- L-87-383, Submits Revised Final Rept Re Actions Taken in Response to IE Bulletin 79-02, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Bechtel quasi-analytical Method Used for Base Plates W/Eight Bolts or Less + (16:57:11, 7 January 2025)
- L-87-423, Special Rept:On 870922,quadrant Power Tilt Ratio (QPTR) Found to Be in Excess of 2% During Startup After Refueling. QPTR Calculated Every Hour Until Less than 2%.New Nuclear Instrumentation Sys Detector Calibr Currents Calculated + (16:57:13, 7 January 2025)
- L-87-427, Discusses Actions Util Taking to Augment & Modify Mgt on Shift Program,Described in Util ,To Formalize Commitment to Actions + (16:57:15, 7 January 2025)
- ML17342A979 + (16:57:24, 7 January 2025)
- NRC-17-0081, Supplement to Revised Relief Request No. RR-A37, Revision 1, for the Inservice Inspection Program Third 10-Year Interval + (16:57:25, 7 January 2025)
- ML17342A976 + (16:57:27, 7 January 2025)
- 05000251/LER-1987-023-01, :on 870915,containment Vent & Control Room Ventilation Isolation Logic Actuated When Process Radiation Monitor Trended High.Caused by Paper Drive Jam. Paper Replaced & Paper Drive Tension Adjusted + (16:57:29, 7 January 2025)
- L-87-404, Forwards Update to Util Response to Insp Repts 50-250/85-09 & 50-251/85-09.Total of 239 Threaded Fasteners Require Immediate Corrective Action.Approx 400 Addl Fasteners Require Rework During Next Reasonable Maint Interval + (16:57:33, 7 January 2025)
- 05000250/LER-1987-023, :on 870913,safety Injection Sys Actuation & Subsequent Reactor Trip Occurred.Caused by Component Failure & Personnel Error.Event Response Team Formed to Investigate Causes & Initiate Corrective Action + (16:57:37, 7 January 2025)
- L-87-406, Responds to Violations Noted in Insp Repts 50-250/87-35 & 50-251/87-35.Corrective Actions:Procedure 3/4 OP-041.8 Will Be Changed to Require Partial Filling of Accumulators Prior to Establishing RCS Integrity + (16:57:40, 7 January 2025)
- L-87-405, Forwards Update to Util Revised Response to IE Bulletin 84-03,re Final Design of Plant Refueling Cavity Water Seal. Seal Provides Redundant Passive safety-related Means of Limiting Refueling Pool Leakage + (16:57:43, 7 January 2025)
- 05000250/LER-1987-025, :on 870914,QA Dept Noted That Surveillance Requirements of Tech Spec 4.1-2 Item 18 Had Not Been Met. Caused by Inadequate Procedure.Procedures 3/4-OSP-201.1 Will Be Revised & Surveillances Performed + (16:57:47, 7 January 2025)
- ML17342A964 + (16:57:49, 7 January 2025)
- ML17342A963 + (16:57:50, 7 January 2025)
- ML17342A960 + (16:57:51, 7 January 2025)