Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17345A860 + (16:29:05, 7 January 2025)
- ML17345A854 + (16:29:06, 7 January 2025)
- ML17345A852 + (16:29:07, 7 January 2025)
- L-91-151, Summarizes 910314 Meeting in Rockville,Md Re Status of PRA Study for Facilities.Clarifies Factors Which Drive RCP Seal LOCA Frequency & Maint Unavailability of Charging Pump B + (16:29:11, 7 January 2025)
- IR 05000250/1991014 + (16:29:19, 7 January 2025)
- ML17345A840 + (16:29:20, 7 January 2025)
- ML17345A839 + (16:29:22, 7 January 2025)
- IR 05000250/1991012 + (16:29:27, 7 January 2025)
- ML17345A835 + (16:29:30, 7 January 2025)
- L-91-150, Requests to Add Re Grazio to NRC Correspondence Svc List for Facilities + (16:29:31, 7 January 2025)
- L-91-139, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/91-11 & 50-251/91-11.Corrective Actions:Procedure TP-644 Revised on 910412 to Clarify Reporting Requirements & to Define Temporary & Permanent Configuration Changes + (16:29:34, 7 January 2025)
- L-91-138, Responds to Ltr Re Violations Noted in Insp Repts 50-250/91-08 & 50-251/91-08.Corrective actions:on-site Storage Containers Surveyed Immediately & Properly Labeled & Plant Procedure O-HPS-041 Revised + (16:29:37, 7 January 2025)
- L-91-145, Forwards Response to Fitness for Duty Concerns Conducted by Util Nuclear Security Dept.Encl Withheld + (16:29:40, 7 January 2025)
- ML17345A825 + (16:29:43, 7 January 2025)
- L-91-144, Monthly Operating Repts for Apr 1991 for Turkey Point Units 3 & 4 + (16:29:45, 7 January 2025)
- ML17345A824 + (16:29:45, 7 January 2025)
- L-91-143, Forwards Results of 910308 Confirmatory Measure Split Sample Analysis.Results of Analyses Discussed in Telcon on 910503 + (16:29:48, 7 January 2025)
- ML17345A821 + (16:29:51, 7 January 2025)
- ML17345A820 + (16:29:52, 7 January 2025)
- ML17345A818 + (16:29:53, 7 January 2025)
- L-91-098, Forwards Response to NRC Questions During 910307 Telcon Re 901219 Application for Amends to Licenses DPR-31 & DPR-41, Revising TS Section 2.2 on Limiting Safety Sys Settings & Section 3/4.3.2 on ESFAS Instrumentation + (16:29:54, 7 January 2025)
- L-91-126, Forwards Response to Followup Item 12 from NRC Audit Rept 50-251/89-203 Re Qualification of Concrete Pedestals for Replacement Component Cooling Water Hxs.Results of Revised Analyses Indicate That Piping/Support Sys Acceptable + (16:29:56, 7 January 2025)
- 05000251/LER-1990-013-01, :on 901212,failure of Alternate DC Supply Occurred.Caused by Failed 4A & 4B EDG Pilot Exciter Regulators.Edg 4B Returned to Vendor for Repair & Transistor Replaced + (16:30:00, 7 January 2025)
- ML17345A814 + (16:30:04, 7 January 2025)
- ML17345A813 + (16:30:09, 7 January 2025)
- L-91-113, Monthly Operating Repts for Mar 1991 for Turkey Point Units 3 & 4 + (16:30:10, 7 January 2025)
- 05000251/LER-1991-001, :on 910313,startup Transformer Locked Out Which Caused 4A 4160 Volt Bus to de-energize.Caused by Loss of Spent Fuel Cooling & Inadequate Process Control.Procedure Revised & Training Issued + (16:30:13, 7 January 2025)
- L-91-100, Submits Info to More Accurately Define Functional Requirements for safety-related 125-volt Dc Power Trains at Facilities During Current dual-unit Outage.Configuration Meets Requirements of 10CFR50.59 + (16:30:15, 7 January 2025)
- L-91-094, Forwards Info to Address Potential Insp Followup Item 91-08-07 Re Location of Containment high-range Area Radiation Monitors.Monitor Locations Effective in Satisfying Guidelines in NUREG-0578,NUREG-0737 & Reg Guide 1.97 + (16:30:19, 7 January 2025)
- ML17345A806 + (16:30:23, 7 January 2025)
- ML17345A805 + (16:30:24, 7 January 2025)
- ML17345A804 + (16:30:25, 7 January 2025)
- ML17345A803 + (16:30:26, 7 January 2025)
- ML17345A802 + (16:30:27, 7 January 2025)
- ML17345A801 + (16:30:28, 7 January 2025)
- ML17345A800 + (16:30:29, 7 January 2025)
- L-91-105, Forwards Westinghouse Ltrs Requesting Proprietary Info in Listed WCAP Repts Be Withheld + (16:30:30, 7 January 2025)
- ML17345A799 + (16:30:30, 7 January 2025)
- ML17345A794 + (16:30:35, 7 January 2025)
- ML17345A796 + (16:30:35, 7 January 2025)
- ML17345A793 + (16:30:36, 7 January 2025)
- L-91-089, Application for Amends to Licenses DPR-31 & DPR-41,changing TS 3.3.2 Re ESFAS,3.3.3.4 Re Fire Detection Instrumentation, 3/4.7.8.3 Re Fire Hose Stations & 3.8.3 Re Onsite Power Distribution Per Emergency Power Enhancement Project + (16:30:37, 7 January 2025)
- 05000250/LER-1991-001-04, :on 910103,loss of Water Inventory in Surge Tank for Component Cooling Water Sys Detected.Caused by Through Wall Erosion/Corrosion of Tubes.Tubes Replaced & Addl Suspect Tubes Inspected + (16:30:41, 7 January 2025)
- IR 05000250/1991009 + (16:30:44, 7 January 2025)
- ML17345A786 + (16:30:46, 7 January 2025)
- IR 05000250/1991007 + (16:30:51, 7 January 2025)
- ML17345A783 + (16:30:52, 7 January 2025)
- ML17345A781 + (16:30:53, 7 January 2025)
- ML17345A780 + (16:30:54, 7 January 2025)
- L-91-079, Responds to Violations Noted in Insp Repts 50-250/91-05 & 50-251/90-05.Corrective Actions:Procedure 0-OSP-016.30 Revised to Incorporate Addition of Fire Loop & Responsible Fire Protection Member Counseled + (16:30:55, 7 January 2025)
- RS-17-156, Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe + (16:30:59, 7 January 2025)