Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-83-402, Rev to 820910 Application for Amend to Licenses DPR-31 & DPR-41,revising Proposed Radiological Effluent Tech Specs in Response to NRC Comments.List of Exemptions from NUREG-0472 Requirements Encl + (16:24:13, 7 January 2025)
- ML17345B157 + (16:24:17, 7 January 2025)
- L-83-398, Forwards Interim Rept, Guidelines for Determination of Extent of Core Damage, to Be Implemented at Facilities. Rept Submitted in Response to post-TMI Requirements Covering post-accident Sampling Sys + (16:24:18, 7 January 2025)
- ML17345B155 + (16:24:21, 7 January 2025)
- ML17345B151 + (16:24:22, 7 January 2025)
- L-83-393, Requests Meeting to Discuss Future Submittal of Tech Specs & Supporting Safety Analysis to Resolve Pressurized Thermal Shock Issues for Cycle 9 Licensing.Update Meeting Requested First Wk in Aug + (16:24:23, 7 January 2025)
- L-83-359, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 20101 Re Duties of Emergency coordinator,20103 Re Classification of Emergencies & 20104 Re Emergency Roster + (16:24:26, 7 January 2025)
- ML17345B147 + (16:24:28, 7 January 2025)
- L-83-390, Application for Amend to License DPR-41,proposing Tech Spec Changes for 4 H Extension of Limiting Condition for Operation 3.0.1 as Result of 830705 Incident Involving Vent Valve Leakage on Accumulator 4B.Amend Requested by 830705 + (16:24:29, 7 January 2025)
- L-83-386, Advises That Mods to Reduce Potential Radiological Exposure of Control Room Operator Following Postulated LOCA Complete. Addl Work to Remove & Replace 4-inch Blocks Will Extend Completion of Block Wall Repair to 830729 + (16:24:31, 7 January 2025)
- L-83-381, Notifies That Interim Core Damage Assessment Guidelines Will Be Provided 830708,per post-TMI Requirements for post-accident Sampling Sys + (16:24:34, 7 January 2025)
- ML17345B142 + (16:24:37, 7 January 2025)
- L-83-380, Forwards Revs to Inservice Test Program for Pumps & Valves. Inservice Test Program for Valves,W/Remote Indicators, Revised to Provide Verification That Valve Operation Accurately Indicated + (16:24:38, 7 January 2025)
- ML17345B139 + (16:24:40, 7 January 2025)
- ML17345B133 + (16:24:41, 7 January 2025)
- L-83-364, Ro:On 830516,several Fire Barrier Penetrations Breached for Longer than 7 Days.Caused by Implementation of Design Changes,Including New Computer Room & Auxiliary Power Upgrade.Hourly Fire Watch Established + (16:24:42, 7 January 2025)
- L-83-358, Forwards Response to 830422 Request for Addl Info Re Criteria 2,10 & 11 of NUREG-0737,Item II.B.3, Post-Accident Sampling. Interim Core Damage Estimate Guidelines Will Be Submitted by 830630 + (16:24:44, 7 January 2025)
- ML17345B124 + (16:24:47, 7 January 2025)
- ML17345B123 + (16:24:49, 7 January 2025)
- ML17345B122 + (16:24:50, 7 January 2025)
- L-83-347, Forwards,For Review,Rev 1 to 830408 Fire Protection Rept.Rev Provides Specific Info & Justification for 10CFR50,App R, Exemption Requests.Exemptions Unnecessary for Fire Areas/ Zones D,E,82,87,91 & 92 + (16:24:51, 7 January 2025)
- ML17345B117 + (16:24:54, 7 January 2025)
- L-83-344, Application for Amend to Licenses DPR-31 & DPR-41,revising Tech Specs to Support Fuel Design Change from Westinghouse Low Parasitic Fuel Assembly to Optimized Fuel Assembly & Use of New Westinghouse Wet Annular Burnable Absorber Rods + (16:24:55, 7 January 2025)
- ML17345B105 + (16:24:57, 7 January 2025)
- ML17345B104 + (16:24:58, 7 January 2025)
- L-83-331, Forwards Class I & III Fees for Proposed License Amend Re Monthly Sys Walkdowns + (16:24:59, 7 January 2025)
- L-83-312, Forwards Schedule for Qualification or Replacement of Equipment Important to Safety Per 10CFR50.49.Items Identified in Technical Evaluation Rept as Not within Scope of IE Bulletin 79-01B Being Evaluated + (16:25:01, 7 January 2025)
- L-83-313, Forwards St Lucie Units 1 & 2 & Turkey Point Units 3 & 4 Detailed Control Room Design Reviews Program Plan, Per 830415 Commitment Re Suppl 1 to NUREG-0737 + (16:25:03, 7 January 2025)
- ML17345B093 + (16:25:12, 7 January 2025)
- L-83-295, Requests Exemption from App R Section III.0 Requiring Reactor Coolant Pump Lube Oil Collection Sys to Be Capable of Containing Entire Lube Oil Sys Inventory.Existing Sys Adequate + (16:25:13, 7 January 2025)
- ML17345B091 + (16:25:15, 7 January 2025)
- L-83-302, Application for Amend to Licenses DPR-31 & 41 Providing Requirement for Monthly Walkdown of All Accessible safety- Related Flow Paths to Verify Correct Valve Position + (16:25:16, 7 January 2025)
- ML17345B087 + (16:25:20, 7 January 2025)
- L-83-297, Advises That Mods to Undervoltage Protection Sys Will Not Be Completed Until Next Refueling Outage in Mar 1984,in Response to NRC Re Adequacy of Electric Distribution Sys Voltages + (16:25:21, 7 January 2025)
- L-83-291, Informs That Emergency Offsite Facility (EOF) Operational W/Exception of Issuance of Procedure 1212 & Installation of Dedicated Phone Lines at near-site Support Ctr & Eof,Per Generic Ltr 82-33 + (16:25:23, 7 January 2025)
- PNO-II-83-034, on 830504,licensee Issued News Release Re Inoperability of Two Auxiliary Feedwater Pumps on 830419. Caused by Valves Inadvertently Closed on 830414 + (16:25:33, 7 January 2025)
- L-83-289, Submits Steam Generator Repair Program Cleanliness Rept. Post-contamination & Final Loop Insps & Steam Generator Search & Retrieval Accomplished to Meet Primary & Secondary Side Cleanliness Commitments + (16:25:34, 7 January 2025)
- L-83-281, Forwards Justification for Continued Operation W/Electrical Equipment in Categories I.B & Ii.A Identified in Franklin Research Ctr Technical Evaluation Rept Per NRC 821213 & 830329 & 31 Ltrs + (16:25:37, 7 January 2025)
- ML17345B075 + (16:25:40, 7 January 2025)
- ML17345B074 + (16:25:41, 7 January 2025)
- ML17345B071 + (16:25:43, 7 January 2025)
- ML17345B069 + (16:25:44, 7 January 2025)
- ML17345B066 + (16:25:45, 7 January 2025)
- L-83-273, Forwards Tabulation of Equipment Qualification Proprietary Info Listed by Supplier Ref in Util Response to IE Bulletin 79-01B,per 821213 Request + (16:25:46, 7 January 2025)
- ML17345B063 + (16:25:48, 7 January 2025)
- L-83-256, Ro:On 830325,several Fire Barrier Penetrations at New Computer,Cable Spreading & Control Rooms Breached for Longer than Tech Spec Limit.Caused by Implementation of Approved Design Changes + (16:25:52, 7 January 2025)
- L-83-206, Forwards Annual Nonradiological Environ Monitoring Rept, 1982 + (16:25:54, 7 January 2025)
- ML17345B058 + (16:25:54, 7 January 2025)
- L-83-246, Forwards Response to Generic Ltr 83-10D Re NRC Criteria for Resolution of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Reactor Coolant Pumps Will Be Tripped Following Small Break LOCA + (16:25:57, 7 January 2025)
- L-83-250, Discusses Proposed Arrangement W/Nrc Re Storage of Nuclear Plant Licensing Records.Trial Implementation Actions,As Mutually Agreed,Can Be Addressed.Visit W/R Scott to Be Arranged to Review Records,Receipt & Storage Sys Details + (16:26:01, 7 January 2025)
- L-83-237, Responds to Generic Ltr 82-33 (NUREG-0737,Suppl 1) Re Emergency Response Capability.Proposed Implementing Schedules Encl + (16:26:04, 7 January 2025)