Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000250/LER-1988-022, :on 880920,emergency Diesel Generator a Declared out-of-svc Due to High Fuel Oil Pressure.Diesel Generator B out-of-svc Since 880917.Caused by Excessive Particles in Filter.Filter Replaced + (15:30:51, 7 January 2025)
- IR 05000250/1988020 + (15:30:54, 7 January 2025)
- L-88-435, Forwards Integrated Schedule Monthly Summary for Sept 1988 + (15:30:57, 7 January 2025)
- L-88-451, Special Rept:Nonfunctional Fire Barrier Penetration Not Returned to Functional Status within 7 Days.Caused by Duration of Work Required to Replace One of Component Cooling Water Hxs.Compensatory Measure Implemented + (15:31:00, 7 January 2025)
- L-88-454, Informs of Util Emergency Power Sys Enhancement Project.Two Addl safety-grade Emergency Diesel Generators Will Be Installed Onsite to Increase Emergency Power Supply Sys Capacity + (15:31:03, 7 January 2025)
- L-88-440, Forwards Summary of mgt-on-shift Weekly Repts,Per NRC 871019 Order.Plant supervisor-nuclear Shift Repts Also Encl + (15:31:05, 7 January 2025)
- IR 05000250/1986006 + (15:31:09, 7 January 2025)
- L-88-453, Monthly Operating Repts for Sept 1988 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 + (15:31:10, 7 January 2025)
- L-88-449, Forwards EPIP 20126, Offsite Dose Calculations & Rev 17 to Radiological Emergency Plan + (15:31:13, 7 January 2025)
- L-88-436, Responds to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Supplemental Rept Providing Details & Implementation Schedule of Actions Required Under Item 3 of Bulletin Will Be Provided by 881230 + (15:31:15, 7 January 2025)
- L-88-442, Forwards Select Sys Assessment Progress Summary for Sept 1988,per NRC 860812 Order,Covering Design Basis Recommendation & Walkdowns + (15:31:18, 7 January 2025)
- ML17347A847 + (15:31:24, 7 January 2025)
- L-88-420, Requests Discretionary Enforcement to Permit Plant to Cooldown Below 275 F When Required + (15:31:25, 7 January 2025)
- L-88-354, Forwards Mgt on Shift (MOS) Weekly Rept,Per NRC 871019 Order.Plant supervisor-nuclear Shift Repts Also Encl + (15:31:29, 7 January 2025)
- L-88-347, Advises That Util Will Be Using Discretionary Enforcement for Extension of Action Statement Time 48 H for Containment Spray Pump 3B Pullout Assembly + (15:31:31, 7 January 2025)
- L-88-333, Summarizes Progress Re Resolution of Generic Ltr 87-02 & USI A-46 Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors.Proprietary Info Withheld + (15:31:34, 7 January 2025)
- L-88-265, Forwards Response to Independent Mgt Appraisal (IMA) by Enercon Svcs,Inc & Evaluation of IMA Prepared by AEOD + (15:31:37, 7 January 2025)
- L-88-332, Forwards mgt-on-shift Weekly Summary Rept,Per 871019 Order + (15:31:41, 7 January 2025)
- L-88-334, Forwards Application for Renewal of NPDES Permit for Facility Submitted to EPA on 880728 + (15:31:44, 7 January 2025)
- L-88-328, Submits Brief Description of Changes Made to Plant Security Organization,Per NRC Request + (15:31:47, 7 January 2025)
- ML17347A834 + (15:31:51, 7 January 2025)
- 05000250/LER-1988-013, :on 880707,discovered That Monthly Channel Functional Test Surveillance Procedure Did Not Check Sys Alarm.Caused by Personnel Error.Surveillance Procedure Corrected & Personnel Counseled + (15:31:53, 7 January 2025)
- ML17347A831 + (15:31:56, 7 January 2025)
- IR 05000250/1988011 + (15:31:57, 7 January 2025)
- L-88-325, Forwards Mgt on-shift Weekly Rept + (15:31:59, 7 January 2025)
- L-88-310, Forwards Summary of mgt-on-shift Repts for Wk Starting 880708 & Plant supervisor-nuclear Shift Repts,Per Commission 871019 Order + (15:32:08, 7 January 2025)
- ML17347A826 + (15:32:14, 7 January 2025)
- ML17347A824 + (15:32:15, 7 January 2025)
- L-88-312, Responds to Suppls 1 & 2 to NRC Bulletin 87-002 Re Fastener Testing to Conform W/Applicable Matl Specs.Primary,Secondary & non-safety Suppliers List Encl + (15:32:17, 7 January 2025)
- L-88-308, Forwards Select Sys Assessment Progress Summary for June 1988,per NRC 860812 Order + (15:32:25, 7 January 2025)
- L-88-290, Discusses Upgrading of Plant Process Radiation Monitoring Sys to Comply W/Reg Guide 1.97 + (15:32:30, 7 January 2025)
- ML17347A818 + (15:32:35, 7 January 2025)
- ML17347A816 + (15:32:36, 7 January 2025)
- L-88-273, Forwards mgt-on-shift Weekly Repts for Wk of 880613 + (15:32:38, 7 January 2025)
- ML17347A813 + (15:32:46, 7 January 2025)
- ML17347A811 + (15:32:48, 7 January 2025)
- 05000250/LER-1988-011, :on 880529,discovered That Diesel Oil Storage Tank Isolation Valve 70-003 Locked Closed.Caused by Personnel Error.Technician Disciplined & Info Bulletin Re Work Controls & Procedural Compliance Issued + (15:32:53, 7 January 2025)
- L-88-281, Informs That Util Will Provide Next 6-month Integrated Schedule Rept Following Nov 1988 Rept + (15:32:55, 7 January 2025)
- ML17347A808 + (15:32:58, 7 January 2025)
- L-88-262, Forwards Summary of mgt-on-shift Weekly Repts & Plant supervisor-nuclear Shift Repts + (15:32:59, 7 January 2025)
- L-88-272, Responds to NRC Re Violations Noted in Insp Repts 50-250/87-47 & 50-251/87-47.Corrective Actions:Procedures Will Be Revised or New Procedure Will Be Generated to Address Handling of Response to NRC Violations + (15:33:02, 7 January 2025)
- ML17347A800 + (15:33:05, 7 January 2025)
- L-88-248, Forwards Mgt on Shift (MOS) Weekly Rept for Wk of 880523 Per NRC 871019 Order.Plant Supervisor Nuclear MOS Repts Also Encl + (15:33:07, 7 January 2025)
- ML17347A798 + (15:33:10, 7 January 2025)
- ML17347A797 + (15:33:15, 7 January 2025)
- TAC:67537 + (15:33:16, 7 January 2025)
- ML17347A795 + (15:33:18, 7 January 2025)
- ML17347A794 + (15:33:23, 7 January 2025)
- 05000250/LER-1988-010, :on 880528,containment Ventilation & Control Room Ventilation Isolation Occurred While Containment Radiation Monitor Setpoint Being Checked.Drawer for Monitor R-11 Initiated Signals.Drawer Replaced + (15:33:27, 7 January 2025)
- 05000250/LER-1988-009, :on 880527,determined That Tech Spec Surveillances for Station Battery Pilot Cell Rotation Not Properly Implemented in 1987.Caused by Personnel Error & Procedure Inadequacy.Training Bulletin Issued + (15:33:30, 7 January 2025)
- 05000250/LER-1987-007-01, :on 870128,diesel Fuel Storage Tank Sample Did Not Meet Tech Spec Surveillance Requirements.Caused by Not Using Sampling Techniques in Accordance W/Std ASTM Sampling Procedures.Procedure Revised + (15:33:36, 7 January 2025)