Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-89-459, Special Rept:Listed Fire Barriers,Doors & Penetrations Breached for More than 7 Days.Barrier 106-F Closed When Hole Discovered While Removing Electrical Cable.Compensatory Measures Implemented + (15:19:07, 7 January 2025)
- ML17347B492 + (15:19:09, 7 January 2025)
- L-89-422, Forwards Rept Providing Changes to or Errors Discovered in ECCS Evaluation Models for 881017-891016.Changes Increased Peak Clad Temp.Westinghouse Discovered Error Re Small Break LOCA Modeling of Stated Vol + (15:19:10, 7 January 2025)
- L-89-437, Forwards Integrated Schedule Monthly Summary for Oct 1989, Reflecting Info as of Issuance Date of 891015.Until Planning for Emergency Ac Power Enhancements Complete,Util Will Continue to Rept Progress Per May 1989 Schedule + (15:19:11, 7 January 2025)
- L-89-457, Administrative Procedure AP 11550.92,Health Physics Procedure HP-92, Emergency Radiation Team Response - Offsite + (15:19:13, 7 January 2025)
- L-89-456, Responds to Violations Noted in Insp Repts 50-250/89-45 & 50-251/89-45.Corrective Actions:Valve Placed in Closed Position & Individual Responsible for Independently Verifying Position of Valve Counseled + (15:19:15, 7 January 2025)
- IR 05000250/1989050 + (15:19:19, 7 January 2025)
- ML17347B481 + (15:19:21, 7 January 2025)
- ML17347B480 + (15:19:22, 7 January 2025)
- ML17347B479 + (15:19:23, 7 January 2025)
- 05000251/LER-1989-006, :on 890713,intake Cooling Water Flow to Component Cooling Water HXs Degraded to Below Design Basis Flow Rate for 15 Minutes.Caused by Flow Obstruction Near Header Isolation Valve.Valve Replaced + (15:19:25, 7 January 2025)
- L-89-444, Monthly Operating Repts for Nov 1989 for Turkey Point Units 3 & 4 + (15:19:26, 7 January 2025)
- IR 05000250/1989047 + (15:19:30, 7 January 2025)
- ML17347B474 + (15:19:32, 7 January 2025)
- RBG-47805, Response to License Renewal Application NRC Request for Additional Information Set 2 + (15:19:33, 7 January 2025)
- ML17347B471 + (15:19:34, 7 January 2025)
- ML17347B469 + (15:19:35, 7 January 2025)
- ML17347B468 + (15:19:36, 7 January 2025)
- TAC:44345 + (15:19:43, 7 January 2025)
- ML17347B462 + (15:19:45, 7 January 2025)
- L-89-441, Forwards USI A-46 & Generic Ltr 87-02 & Proprietary Rev 1 to Plant-Specific Seismic Adequacy Implementation Procedure to Resolve USI A-46 & Generic Ltr 87-02 + (15:19:46, 7 January 2025)
- 05000250/LER-1989-017, :on 890125,Tech Spec 3.11.2 Requirement to Maintain Complete Inventory of Licensed Radioactive Matls at All Times Not Met.Caused by Inadequate Procedures. Procedures Revised & New Procedures Issued + (15:19:48, 7 January 2025)
- 05000250/LER-1989-016, :on 891110,determined That Catastrophic Failure of Reactor Coolant Pump 3A Motor Lube Oil Sys Would Result in Collection Tank Overflowing.Caused by Inadequate Design.Addl Tank Capacity Will Be Provided + (15:19:50, 7 January 2025)
- L-89-438, Responds to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. Four Addl Breakers,Not Meeting Criteria in Bulletin,Identified in .One Breaker in Use in nonsafety-related Application + (15:19:53, 7 January 2025)
- ML17347B455 + (15:19:53, 7 January 2025)
- IR 05000250/1989046 + (15:19:57, 7 January 2025)
- L-89-419, Forwards Select Sys Assessment Progress Summary for Oct 1989,per 860812 Order + (15:19:59, 7 January 2025)
- ML17347B451 + (15:19:59, 7 January 2025)
- ML17347B449 + (15:20:02, 7 January 2025)
- ML17347B448 + (15:20:03, 7 January 2025)
- ML17347B446 + (15:20:04, 7 January 2025)
- TAC:74733 + (15:20:05, 7 January 2025)
- ML17347B445 + (15:20:07, 7 January 2025)
- L-89-428, Responds to SALP Repts 50-250/89-36 & 50-251/89-36 for Period Jul 1988 - Jul 1989.Strong Mgt Oversight Recognized in SALP Rept Will Be Maintained & Systematically Address Weaknesses Noted + (15:20:08, 7 January 2025)
- ML17347B444 + (15:20:08, 7 January 2025)
- ML17347B442 + (15:20:13, 7 January 2025)
- ML17347B440 + (15:20:14, 7 January 2025)
- L-89-415, Forwards Status of Implementation of USI for Which Final Technical Resolution Has Been Achieved,Per Generic Ltr 89-21, Request for Implementation of USI Requirements + (15:20:15, 7 January 2025)
- L-89-423, Responds to Violations Noted in Insp Repts 50-250/89-43 & 50-251/89-43.Corrective Actions:Supervisors & Chiefs in Electrical Dept Instructed to Clearly Communicate Job Scope & Clearance Requirements to Control Room Personnel + (15:20:21, 7 January 2025)
- ML17347B435 + (15:20:27, 7 January 2025)
- ML17347B433 + (15:20:28, 7 January 2025)
- ML17347B432 + (15:20:28, 7 January 2025)
- ML17347B430 + (15:20:30, 7 January 2025)
- ML17347B429 + (15:20:31, 7 January 2025)
- ML17347B428 + (15:20:31, 7 January 2025)
- L-89-391, Application for Amend to License DPR-41,deleting License Condition 3.J, IAEA Safeguards + (15:20:32, 7 January 2025)
- ML17347B424 + (15:20:34, 7 January 2025)
- ML17347B426 + (15:20:34, 7 January 2025)
- L-89-412, Forwards Monthly Operating Rept for Oct 1989 for Turkey Point,Units 3 & 4 & Corrected Operating Data Rept for Sept 1989 for Turkey Point,Unit 3 + (15:20:35, 7 January 2025)
- ML17347B422 + (15:20:39, 7 January 2025)
- L-89-404, Special Rept:Provides List of Nonfunctional Fire Barrier Penetration Not Returned to Functional Status within 7 Days, Per Tech Spec 3.14.5.b.Caused by Performance of Fire Protection Surveillance.Compensatory Measures Implemented + (15:20:40, 7 January 2025)
- 05000250/LER-1989-015, :on 891019,charging Pumps Declared Inoperable Due to Inability to Maintain Pressurizer Level w/45 Gpm Letdown Orifice in Svc.Caused by Inadequate Troubleshooting. Suction/Discharge Valves for Pump Overhauled + (15:20:46, 7 January 2025)