Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-91-073, Monthly Operating Repts for Feb 1991 for Turkey Point Units 3 & 4 + (15:00:41, 7 January 2025)
- ML17348A903 + (15:00:42, 7 January 2025)
- ML17348A901 + (15:00:44, 7 January 2025)
- IR 05000250/1991005 + (15:00:46, 7 January 2025)
- ML17348A899 + (15:00:48, 7 January 2025)
- ML17348A897 + (15:00:49, 7 January 2025)
- ML17348A896 + (15:00:50, 7 January 2025)
- ML17348A895 + (15:00:51, 7 January 2025)
- L-91-063, Semiannual Radioactive Effluent Release Rept Jul-Dec 1990 + (15:00:52, 7 January 2025)
- ML17348A892 + (15:00:52, 7 January 2025)
- IR 05000250/1991001 + (15:00:56, 7 January 2025)
- ML17348A886 + (15:01:01, 7 January 2025)
- ML17348A887 + (15:01:01, 7 January 2025)
- L-91-061, Forwards Recorded Annual Whole Body Exposure for CY90. Total Accumulated Dose by Direct Reading Dosimeter Was Approx 881 person-rem.Total Accumulated Dose by TLD Was Approx 730 person-rem + (15:01:02, 7 January 2025)
- IR 05000250/1991004 + (15:01:05, 7 January 2025)
- ML17348A880 + (15:01:06, 7 January 2025)
- ML17348A879 + (15:01:07, 7 January 2025)
- L-91-006, Application for Amends to Licenses DPR-31 & DPR-41,revising Tech Spec 6.0 to Reflect Present Organizational Titles & Changing Composition of Plant Nuclear Safety Committee + (15:01:08, 7 January 2025)
- L-91-052, Monthly Operating Repts for Jan 1991 for Turkey Points Units 3 & 4 + (15:01:10, 7 January 2025)
- ML17348A874 + (15:01:12, 7 January 2025)
- L-91-039, Proposes That Enhanced Roving Watch Be Performed Every 30 Minutes in Lieu of Continuous Fire Watch for Open Manholes or Electrical Raceways During Emergency Power Sys Enhancement Outage + (15:01:13, 7 January 2025)
- ML17348A871 + (15:01:15, 7 January 2025)
- ML17348A870 + (15:01:16, 7 January 2025)
- EPID:L-2017-LLA-0352 + (15:01:17, 7 January 2025)
- ML17348A869 + (15:01:17, 7 January 2025)
- SBK-L-17202, Response to Seabrook Station, Unit No. 1 - Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Delete Operator Action and Request for Exemption + (15:01:18, 7 January 2025)
- IR 05000250/1990042 + (15:01:22, 7 January 2025)
- ML17348A862 + (15:01:23, 7 January 2025)
- ML17348A860 + (15:01:25, 7 January 2025)
- ML17348A858 + (15:01:26, 7 January 2025)
- IR 05000250/1991002 + (15:01:28, 7 January 2025)
- ML17348A855 + (15:01:29, 7 January 2025)
- IR 05000250/1990043 + (15:01:33, 7 January 2025)
- ML17348A850 + (15:01:35, 7 January 2025)
- ML17348A849 + (15:01:36, 7 January 2025)
- ML17348A842 + (15:01:37, 7 January 2025)
- L-17-351, Anchor Darling Double Disc Gate Valve Information and Status + (15:01:41, 7 January 2025)
- ML17348A837 + (15:01:41, 7 January 2025)
- L-91-031, Forwards Topical Rept, Boric Acid Concentration Reduction Technical Bases & Operational Analysis, Ref in 901127 Amend Request + (15:01:42, 7 January 2025)
- ML17348A836 + (15:01:42, 7 January 2025)
- ML17348A833 + (15:01:44, 7 January 2025)
- L-90-427, Application for Amends to Licenses DPR-31 & DPR-41,modifying Tech Spec Table 4.4-5, Reactor Vessel Matl Surveillance Program - Withdrawal Schedule to Place Surveillance Capsule in Higher Flux Position + (15:01:45, 7 January 2025)
- TAC:68303 + (15:01:47, 7 January 2025)
- ML17348A830 + (15:01:49, 7 January 2025)
- 05000250/LER-1989-018, :on 891212,use of Single Manual SI Block/ Unblock Switch for Both Trains of SI Outside Design Basis. Caused by Inadequate Original Plant Design.Info Re Potential Single Failure Mode Provided to Personnel + (15:01:51, 7 January 2025)
- L-91-022, Monthly Operating Repts for Dec 1990 for Turkey Point Units 3 & 4 + (15:01:52, 7 January 2025)
- IR 05000250/1990044 + (15:01:54, 7 January 2025)
- ML17348A825 + (15:01:56, 7 January 2025)
- L-91-021, Special Rept:From 901206 to 21,listed Fire Barriers,Doors, Detector Alarms,Manholes & Water Tanks Not Returned to Functional Status within 7 Days.Compensatory Measures Implemented + (15:01:57, 7 January 2025)
- ML17348A822 + (15:01:57, 7 January 2025)
- ML17348A818 + (15:01:59, 7 January 2025)