Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17354A722 + (13:17:47, 7 January 2025)
- ML17354A720 + (13:17:52, 7 January 2025)
- L-97-283, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/97-10 & 50-251/97-10 on 970810-0920.Corrective Actions:Components Were Tagged & Placed in Radiation Controlled Area + (13:17:53, 7 January 2025)
- ML17354A715 + (13:17:55, 7 January 2025)
- TAC:M94744 + (13:17:56, 7 January 2025)
- ML17354A714 + (13:17:57, 7 January 2025)
- ML17354A712 + (13:17:58, 7 January 2025)
- ML17354A711 + (13:17:59, 7 January 2025)
- L-97-278, Confirms Completion of Requested Actions 1 & 2 of GL 96-01, Testing of Safety-Related Logic Circuit + (13:18:03, 7 January 2025)
- ML17354A709 + (13:18:05, 7 January 2025)
- ML17354A707 + (13:18:06, 7 January 2025)
- L-97-229, Informs of Util Application for Renewal of NPDES FL0001562 for Plant IAW Section 3.2.3 of Plant Environ Protection Plan (App B of OL DPR-31 & DPR-41).W/application + (13:18:07, 7 January 2025)
- L-97-272, Provides Initial Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC Containment Heat Removal Pumps + (13:18:09, 7 January 2025)
- L-97-256, Forwards Info Which Describes Criteria to Be Used to Determine If Proposed Horizontal Spacing or Use of Radiant Energy Shield in Outdoor Fire Zones Excluding Turbine Bldg Would Be Adequate + (13:18:11, 7 January 2025)
- ML17354A699 + (13:18:14, 7 January 2025)
- ML17354A698 + (13:18:15, 7 January 2025)
- ML17354A696 + (13:18:16, 7 January 2025)
- ML17354A692 + (13:18:17, 7 January 2025)
- IR 05000382/2017011 + (13:18:24, 7 January 2025)
- ML17354A689 + (13:18:27, 7 January 2025)
- IR 05000250/1997300 + (13:18:29, 7 January 2025)
- L-97-262, Forwards Revised 0-EPIP-20127, Duties of Assembly Area Supervisor. Primary Reason for Change Was to Upgrade Format of Procedure + (13:18:31, 7 January 2025)
- ML17354A686 + (13:18:31, 7 January 2025)
- L-97-246, Discusses Operator Licensing Examiner stds,ES-202,preparing & Reviewing Operator Licensing Applications,Section 2.0, License Eligibility Guidlines,States That Applicant Should Complete at Least 13 Wks as Extra Person on Shift + (13:18:40, 7 January 2025)
- L-97-254, Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4 + (13:18:41, 7 January 2025)
- 05000250/LER-1997-008-01, :on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens Corrected + (13:18:44, 7 January 2025)
- ML17354A679 + (13:18:45, 7 January 2025)
- RBG-47814, Request for Due Date Extension for License Renewal Application NRC Request for Additional Information from 30 Days to 45 Days + (13:18:45, 7 January 2025)
- L-97-238, Forwards COLR Unit 4 Cycle 17, for Turkey Point IAW TS 6.9.1.7 + (13:18:46, 7 January 2025)
- L-97-249, Informs That Unit 4 SGs Were Inspected from 970918-22 & No SG Tubes Were Plugged as Result of Insp + (13:18:47, 7 January 2025)
- TAC:M99653 + (13:18:50, 7 January 2025)
- ML17354A671 + (13:18:50, 7 January 2025)
- ML17354A669 + (13:18:51, 7 January 2025)
- ML17354A667 + (13:18:52, 7 January 2025)
- ML17354A664 + (13:18:53, 7 January 2025)
- L-97-248, Requests Relief from Requirement of ASME Section XI,1989 Edition,Paragraph IWA-5250(a)(2) to Remove All Bolting (Studs) on 4B Reactor Coolant Pump,Iaw 10CFR50.55a(a)(3) (II) + (13:18:54, 7 January 2025)
- GO2-17-214, Guarantee of Payment of Deferred Premium + (13:18:55, 7 January 2025)
- L-97-232, Forwards Supplemental Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, to Support NRC Review + (13:18:56, 7 January 2025)
- ML17354A656 + (13:18:58, 7 January 2025)
- RA-17-0053, Duke Energy - Anchor Darling Double Disc Gate Valve Information and Status + (13:18:58, 7 January 2025)
- ML17354A636 + (13:19:00, 7 January 2025)
- IR 05000298/2017012 + (13:19:01, 7 January 2025)
- ML17354A632 + (13:19:02, 7 January 2025)
- ML17354A630 + (13:19:06, 7 January 2025)
- L-97-241, Documents That FPL Has No Concerns or Challenges Re site- Specific Written Exam Admininstered at Plants on 970912 + (13:19:07, 7 January 2025)
- IR 05000250/1997005 + (13:19:09, 7 January 2025)
- L-97-230, Monthly Operating Repts for Aug 1997 for Turkey Point + (13:19:10, 7 January 2025)
- IR 05000250/1997008 + (13:19:46, 7 January 2025)
- ML17354A619 + (13:19:51, 7 January 2025)
- IR 05000250/1997006 + (13:19:53, 7 January 2025)
- L-97-202, Application for Amends to Licenses DPR-31 & DPR-41,modifying Turkey Point Units 3 & 4 TS to Allow Use of 12 Hour Shifts for Nominal 40 (36 to 48) Hour Week + (13:19:54, 7 January 2025)
- ML17354A616 + (13:19:54, 7 January 2025)