Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17354A916 + (13:13:42, 7 January 2025)
- ML17354A912 + (13:13:43, 7 January 2025)
- TAC:M95652 + (13:13:48, 7 January 2025)
- ML17354A910 + (13:13:50, 7 January 2025)
- ML17354A909 + (13:13:51, 7 January 2025)
- ML17354A908 + (13:13:52, 7 January 2025)
- ML17354A904 + (13:13:54, 7 January 2025)
- ML17354A892 + (13:14:02, 7 January 2025)
- IR 05000250/1998003 + (13:14:03, 7 January 2025)
- ML17354A887 + (13:14:05, 7 January 2025)
- ML17354A886 + (13:14:07, 7 January 2025)
- L-98-092, Forwards FPL Summary Rept on Changes,Tests & Experiments Made Without Prior Commission Approval, for Period from 960408-971013 & Reload SE Summaries for Unit 3 Cycle 16, & Unit 4 Cycle 17,dtd 971022 + (13:14:08, 7 January 2025)
- ML17354A885 + (13:14:08, 7 January 2025)
- L-98-095, Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4 + (13:14:13, 7 January 2025)
- ML17354A880 + (13:14:16, 7 January 2025)
- L-98-088, Provides Summary of PL-CRDM Housing Issue Relevant to Units 3 & 4 & Plans for Addressing Summary.Util Routinely Performs Enchanced RCS Leakage Rate Monitoring at Plant + (13:14:17, 7 January 2025)
- L-97-290, Requests Change to Plant Radiological Emergency Plan. Proposed Change Is Rev of Declaration Threshold for EAL of Unusual Event Involving RCS Leakage.Comparison of Current Threshold to Proposed Declaration,Encl + (13:14:29, 7 January 2025)
- ML17354A878 + (13:14:29, 7 January 2025)
- ML17354A876 + (13:14:32, 7 January 2025)
- ML17354A875 + (13:14:33, 7 January 2025)
- ML17354A874 + (13:14:34, 7 January 2025)
- IR 05000250/1998002 + (13:14:40, 7 January 2025)
- ML17354A870 + (13:14:42, 7 January 2025)
- ML17354A854 + (13:14:42, 7 January 2025)
- 05000250/LER-1997-009, :on 971114,discovered That CR Console Switch for 3B SGFP Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR + (13:14:47, 7 January 2025)
- 05000250/LER-1997-009-01, Forwards LER 97-009-01 Re Discovery That CR Console Switch for 3B SGFP Was Not in Start Position.Ler Is Being Revised to Include Attachment Providing Simplified Auxiliary Feedwater Initiation Logic Diagram for Loss of SGFPs + (13:14:49, 7 January 2025)
- ML17354A848 + (13:14:50, 7 January 2025)
- ML17354A846 + (13:14:52, 7 January 2025)
- RAIO-1217-57684, LLC Response to NRC Request for Additional Information No. 277 (Erai No. 8747) on the NuScale Design Certification Application + (13:14:53, 7 January 2025)
- 05000250/LER-1998-001-02, :on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be Revised + (13:14:56, 7 January 2025)
- ML17354A840 + (13:14:57, 7 January 2025)
- ML17354A838 + (13:14:57, 7 January 2025)
- ML17354A837 + (13:14:59, 7 January 2025)
- IR 05000250/1998300 + (13:15:00, 7 January 2025)
- ML17354A834 + (13:15:01, 7 January 2025)
- ML17354A832 + (13:15:02, 7 January 2025)
- L-98-065, Forwards Revised Epips,Including 0-EPIP-20106, Natural Emergencies, 0-EPIP-20132, Technical Support Center Activation & Operation, & 0-EPIP-20133, Operations Support Center Activation & Operation + (13:15:09, 7 January 2025)
- ML17354A825 + (13:15:13, 7 January 2025)
- ML17354A824 + (13:15:15, 7 January 2025)
- IR 05000250/1997012 + (13:15:16, 7 January 2025)
- ML17354A822 + (13:15:17, 7 January 2025)
- ML17354A821 + (13:15:18, 7 January 2025)
- ML17354A820 + (13:15:19, 7 January 2025)
- ML17354A816 + (13:15:20, 7 January 2025)
- IR 05000250/1997013 + (13:15:37, 7 January 2025)
- ML17354A814 + (13:15:44, 7 January 2025)
- ML17354A812 + (13:15:46, 7 January 2025)
- ML17354A811 + (13:15:47, 7 January 2025)
- ML17354A810 + (13:15:47, 7 January 2025)
- ML17354A807 + (13:15:51, 7 January 2025)
- L-98-045, Forwards Semiannual FFD Performance Rept for Reporting Period Jul-Dec 1997 for Turkey Point Unit 3 & 4,as Required by 10CFR26.71(d) + (13:15:52, 7 January 2025)