Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-99-178, Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included + (13:01:14, 7 January 2025)
- ML17355A405 + (13:01:16, 7 January 2025)
- ML17355A404 + (13:01:17, 7 January 2025)
- L-99-173, Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance + (13:01:18, 7 January 2025)
- TAC:M96878 + (13:01:20, 7 January 2025)
- ML17355A399 + (13:01:21, 7 January 2025)
- L-99-179, Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With + (13:01:22, 7 January 2025)
- ML17355A397 + (13:01:24, 7 January 2025)
- L-99-172, Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 + (13:01:25, 7 January 2025)
- ML17355A392 + (13:01:27, 7 January 2025)
- L-99-162, Application for Amend to License DPR-31,modifying TSs 3.8.1.1,3.4.3 & 3.5.2 to Extend AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis + (13:01:31, 7 January 2025)
- 05000250/LER-1999-001-02, :on 990623,manual RT from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With + (13:01:33, 7 January 2025)
- L-99-165, Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants + (13:01:34, 7 January 2025)
- L-99-163, Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With + (13:01:38, 7 January 2025)
- ML17355A380 + (13:01:41, 7 January 2025)
- ML17355A378 + (13:01:42, 7 January 2025)
- IR 05000250/1999003 + (13:01:54, 7 January 2025)
- ML17355A374 + (13:01:56, 7 January 2025)
- ML17355A373 + (13:01:58, 7 January 2025)
- ML17355A372 + (13:01:59, 7 January 2025)
- ML17355A368 + (13:02:02, 7 January 2025)
- ML17355A361 + (13:02:05, 7 January 2025)
- L-99-117, Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions + (13:02:25, 7 January 2025)
- TAC:M402029 + (13:02:27, 7 January 2025)
- ML17355A347 + (13:02:29, 7 January 2025)
- L-99-115, Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley + (13:02:30, 7 January 2025)
- IR 05000250/1999002 + (13:02:46, 7 January 2025)
- ML17355A341 + (13:02:47, 7 January 2025)
- ML17355A335 + (13:02:48, 7 January 2025)
- ML17355A334 + (13:02:49, 7 January 2025)
- ML17355A332 + (13:02:53, 7 January 2025)
- ML17355A331 + (13:02:54, 7 January 2025)
- ML17355A329 + (13:02:57, 7 January 2025)
- ML17355A322 + (13:03:01, 7 January 2025)
- ML17355A320 + (13:03:02, 7 January 2025)
- ML17355A315 + (13:03:03, 7 January 2025)
- ND-17-2100, Vogtie Electric Generating Plant Unit 4 - ITAAC Closure Notification on Completion of ITAAC 2.3.11.02.1 (Index Number 450) + (13:03:04, 7 January 2025)
- ML17355A302 + (13:03:09, 7 January 2025)
- ML17355A301 + (13:03:11, 7 January 2025)
- IR 05000250/1999001 + (13:03:46, 7 January 2025)
- ML17355A298 + (13:03:48, 7 January 2025)
- ML17355A297 + (13:03:50, 7 January 2025)
- ML17355A296 + (13:03:51, 7 January 2025)
- L-99-085, Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 + (13:03:52, 7 January 2025)
- L-99-087, Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With + (13:03:54, 7 January 2025)
- TAC:M97112 + (13:03:57, 7 January 2025)
- ML17355A290 + (13:03:58, 7 January 2025)
- L-99-075, Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 + (13:03:59, 7 January 2025)
- ML17355A288 + (13:04:01, 7 January 2025)
- ML17355A283 + (13:04:05, 7 January 2025)
- ML17355A281 + (13:04:07, 7 January 2025)