Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18005A601 + (12:09:41, 7 January 2025)
- IR 05000400/1988026 + (12:09:46, 7 January 2025)
- ML18005A598 + (12:09:48, 7 January 2025)
- PNO-II-88-054, Coalition Against Shearon Harris Notified Local Law Enforcement of Plant Demonstration Scheduled for 880912-13.Civil Disobedience Expected.Plant Security & FBI Notified.Local Media Interest Anticipated + (12:09:52, 7 January 2025)
- ML18005A595 + (12:09:53, 7 January 2025)
- ML18005A593 + (12:09:54, 7 January 2025)
- 05000400/LER-1988-024, :on 880812,maint Surveillance Tests Verifying Nuclear Instrumentation Source Range Monitor Operability Not Performed Prior to Mode 6 Entry.Caused by Deficient Planning & Scheduling.Surveillance Tests Scheduled + (12:09:55, 7 January 2025)
- 05000400/LER-1988-023, :on 880812,reactor Coolant Sys Vent Less than Required by Tech Spec 3.4.9.4 for Low Temp Overpressure Protection.Caused by Failed Valve Gagging Device.Longer Gagging Device Installed + (12:09:57, 7 January 2025)
- ML18005A587 + (12:09:58, 7 January 2025)
- ML18005A586 + (12:09:59, 7 January 2025)
- ML18005A585 + (12:10:00, 7 January 2025)
- ML18005A584 + (12:10:01, 7 January 2025)
- 05000400/LER-1988-022, :on 880809,vent Stack Flow Rate Estimates Not Done Per Tech Specs.Caused by Personnel Error.Personnel Involved Counseled & on-shift Operators Reminded of Importance of Attention to Detail + (12:10:02, 7 January 2025)
- 05000400/LER-1988-020, :on 880806,wide Range Gas Monitor Inoperable Due to Loss of Sample Flow & Compensatory Actions Not Taken. Caused by Personnel Error.Procedure Revised for Addl Checks on Monitors & Personnel Received Addl Training + (12:10:05, 7 January 2025)
- ML18005A580 + (12:10:06, 7 January 2025)
- 05000400/LER-1988-021, :on 880809,automatic Start of Auxiliary Feedwater Pump Occurred While Performing Operational Surveillance Test OST-1826.Caused by Procedural Deficiency. Procedures Revised + (12:10:08, 7 January 2025)
- IR 05000400/1988022 + (12:10:10, 7 January 2025)
- ML18005A573 + (12:10:15, 7 January 2025)
- TAC:64561 + (12:10:15, 7 January 2025)
- ML18005A571 + (12:10:16, 7 January 2025)
- ML18005A572 + (12:10:16, 7 January 2025)
- ML18005A570 + (12:10:17, 7 January 2025)
- ML18005A569 + (12:10:19, 7 January 2025)
- ML18005A568 + (12:10:19, 7 January 2025)
- 05000400/LER-1988-019-01, :on 880730,both source-range Nuclear Detectors NI-31 & NI-32 Failed Low & Declared Inoperable.Caused by Short in Inner Shield to Ctr Conductor & Faulty Cable connector.Source-range Detectors Replaced + (12:10:21, 7 January 2025)
- 05000400/LER-1988-018-01, :on 880730,main Feedwater Pump Tripped Due to Low Flow During Normal Shutdown for Scheduled Refueling Outage.Caused by Low Setpoint on Recirculation Flow Switch Drifting Out of Calibr Low.Switch Calibrated + (12:10:22, 7 January 2025)
- ML18005A565 + (12:10:24, 7 January 2025)
- ML18005A563 + (12:10:25, 7 January 2025)
- 05000400/LER-1988-017-01, :on 880726,Tech Spec 3.7.7 Violated.Caused by Inoperability of Emergency Svc Water Pump a & Train a Essential Svcs Chilled Water Sys.Bay Inspected Under Water & Traveling Screen Operation W/Bay Drained + (12:10:26, 7 January 2025)
- PNO-II-88-049, on 880812,plant Lost Power to 18 of 30 Annunciator Panels,Due to Failure in Associated Power Supply Inverter.Licensee Investigating Cause of Power Supply Failure & NRC Closely Monitoring Situation + (12:10:29, 7 January 2025)
- ML18005A560 + (12:10:30, 7 January 2025)
- ML18005A558 + (12:10:31, 7 January 2025)
- ML18005A557 + (12:10:31, 7 January 2025)
- IR 05000400/1988011 + (12:10:32, 7 January 2025)
- IR 05000400/1988019 + (12:10:36, 7 January 2025)
- ML18005A553 + (12:10:37, 7 January 2025)
- ML18005A549 + (12:10:39, 7 January 2025)
- ML18005A548 + (12:10:40, 7 January 2025)
- ML18005A546 + (12:10:40, 7 January 2025)
- ML18005A545 + (12:10:41, 7 January 2025)
- EPID:L-2017-LLR-0110 + (12:10:42, 7 January 2025)
- ML18005A542 + (12:10:42, 7 January 2025)
- ML18005A541 + (12:10:44, 7 January 2025)
- ML18005A540 + (12:10:45, 7 January 2025)
- ML18005A538 + (12:10:46, 7 January 2025)
- TAC:L33317 + (12:10:46, 7 January 2025)
- ML18005A536 + (12:10:47, 7 January 2025)
- ML18005A533 + (12:10:48, 7 January 2025)
- 05000400/LER-1987-059, :on 871011,incoming Line Breaker Tripped Initiating Safety Bus Blackout.Caused by Hammering & Drilling of in Relay Cabinet by Employee.Switchyard Breaker Reclosed & off-site Power Restored to Bus + (12:10:53, 7 January 2025)
- IR 05000400/1988012 + (12:10:59, 7 January 2025)
- ML18005A529 + (12:11:01, 7 January 2025)