Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- HNP-95-094, Informs That Personnel from Util Will Attend NRC GL 95-07 Meeting on 951024 in Atlanta,Ga to Discuss & Clarify Various Aspects Re Issue + (11:20:23, 7 January 2025)
- PNO-II-95-059, on 951020,Unit 1 Commenced Normal Shutdown in Excess of 72 H,To Repair body-to-bonnet Leak on Main Feedwater Isolation Valve.Resident Inspector Responded to Site & Monitored Activities Throughout Weekend + (11:20:23, 7 January 2025)
- HNP-95-085, Provides Addl Info Requested by NRC Re GL 95-03, Circumferential Cracking of SG Tubes + (11:20:25, 7 January 2025)
- ML18011B039 + (11:20:28, 7 January 2025)
- ML18011B038 + (11:20:29, 7 January 2025)
- HNP-95-089, Submits Plant Rev 1 to COLR in Support of Cycle 7 Operations Per Requirements of HNP TS 6.9.1.6.4 + (11:20:30, 7 January 2025)
- ML18011B037 + (11:20:30, 7 January 2025)
- ML18011B032 + (11:20:33, 7 January 2025)
- ML18011B031 + (11:20:33, 7 January 2025)
- HNP-95-090, Submits Addl Info Re RAB Emergency Exhaust Sys Design & Licensing Basis Issues + (11:20:34, 7 January 2025)
- ML18011B028 + (11:20:36, 7 January 2025)
- HNP-95-002, Monthly Operating Rept for Sept 1995 for Harris Nuclear Plant + (11:20:37, 7 January 2025)
- ML18011B027 + (11:20:37, 7 January 2025)
- ML18011B025 + (11:20:39, 7 January 2025)
- ML18011B023 + (11:20:40, 7 January 2025)
- ML18011B022 + (11:20:41, 7 January 2025)
- 05000400/LER-1995-006-01, :on 950824,determined Discrepancy Re Design of RAB EES Constituted Condition Outside Design Basis.Cause Still Under Investigation.Established Administrative Leakage Limit of 1 Gallon Per Hour + (11:20:42, 7 January 2025)
- HNP-95-083, Discusses Reactor Auxiliary Bldg Emergency Exhaust Sys Design & Licensing Basis Issues.Description of Proposed Changes to FSAR Which Incorporate Results of Dose Assessment Reanalysis & Details of Administrative Controls Encl + (11:20:43, 7 January 2025)
- ML18011B019 + (11:20:45, 7 January 2025)
- TAC:M91857 + (11:20:46, 7 January 2025)
- HNP-95-082, Submits Supplemental Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers + (11:20:47, 7 January 2025)
- ML18011B017 + (11:20:47, 7 January 2025)
- IR 05000400/1995012 + (11:20:55, 7 January 2025)
- ML18011B012 + (11:20:58, 7 January 2025)
- ML18011B011 + (11:20:59, 7 January 2025)
- HNP-95-078, Monthly Operating Rept for Aug 1995 for Shearon Harris Nuclear Power Plant + (11:21:00, 7 January 2025)
- ML18011B009 + (11:21:02, 7 January 2025)
- ML18011B007 + (11:21:03, 7 January 2025)
- ML18011B008 + (11:21:03, 7 January 2025)
- ML18011B006 + (11:21:04, 7 January 2025)
- ML18011B004 + (11:21:05, 7 January 2025)
- IR 05000400/1995010 + (11:21:06, 7 January 2025)
- HNP-95-074, Provides 90 Day Response to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity + (11:21:07, 7 January 2025)
- HNP-95-073, Monthly Operating Rept for Jul 1995 for Shearon Harris Nuclear Power Plant + (11:21:09, 7 January 2025)
- ML18011A996 + (11:21:11, 7 January 2025)
- HNP-95-072, Requests That 950320 Request for License Amend Re Reactor Trip Sys Instrumentation Setpoint Relocation to COLR Be Withdrawn,Per NRC Position That TS Parameters in Questions Would Not Meet Commission Criteria for Relocation + (11:21:12, 7 January 2025)
- ML18011A994 + (11:21:15, 7 January 2025)
- IR 05000400/1995030 + (11:21:17, 7 January 2025)
- ML18011A991 + (11:21:18, 7 January 2025)
- ML18011A990 + (11:21:19, 7 January 2025)
- IR 05000400/1995011 + (11:21:24, 7 January 2025)
- ML18011A987 + (11:21:26, 7 January 2025)
- NUREG-1431, Safety Evaluation Supporting Amend 60 to License NPF-63 + (11:21:27, 7 January 2025)
- ML18011A980 + (11:21:28, 7 January 2025)
- ML18011A979 + (11:21:30, 7 January 2025)
- HNP-95-070, Provides Rev to in 950501 Violation Response Re Insp Rept 50-400/95-04.Rev Reflects Revised Actual Completion Dates + (11:21:34, 7 January 2025)
- ML18011A976 + (11:21:34, 7 January 2025)
- ML18011A971 + (11:21:36, 7 January 2025)
- ML18011A970 + (11:21:37, 7 January 2025)
- HNP-95-067, Provides Addl Info in Support of 950405 License Amend Request Re Refueling Operations Section 3/4.9 of Shnpp TS + (11:21:38, 7 January 2025)
- HNP-95-051, Forwards Technical Info Re Area Temp Monitoring TS (3/4.7.12),as Requested During Telcon W/Nrc Re 941024 Request for License Amend Re Relocation of Selected TS in Accordance w/NUREG-1431 + (11:21:40, 7 January 2025)