- 05000400/LER-1996-007, :on 960425,failed to Perform Tech Spec Surveillance Testing Per Specification 4.7.6.d.3.Caused by Inadequate Procedure Development.Satisfied Differential Pressure Testing Requirement + (11:15:03, 7 January 2025)
- ML18012A246 + (11:15:07, 7 January 2025)
- IR 05000400/1996002 + (11:15:08, 7 January 2025)
- HNP-96-083, Monthly Operating Rept for Apr 1996 for Harris Nuclear Plant + (11:15:09, 7 January 2025)
- HNP-96-080, Forwards Response to NRC Re Violations Noted in Insp Rept 50-400/96-02.Corrective Actions:Completed Review of Implementation Procedures for Complying TS Action Statements Re Esfa Sys & Reactor Protection Sys + (11:15:18, 7 January 2025)
- HNP-96-068, Annual Environ (Nonradiological) Operating Rept,App B for Jan-Dec 1995 + (11:15:20, 7 January 2025)
- HNP-96-073, Annual Radioactive Effluent Release Rept Jan-Dec 1995. W/ + (11:15:22, 7 January 2025)
- HNP-96-076, Forwards Amend 47 to FSAR for Shnpp,Incorporating Addl Engineering Evaluations as Indicated in 960412 Submittal of Amend 46 to Fsar.Info in Amend 47 Update Completes Amend Scope as Defined in 960412 Submittal of Amend 46 + (11:15:23, 7 January 2025)
- HNP-96-072, 1995 Annual Radiological Environ Operating Rept,Vols I- III + (11:15:28, 7 January 2025)
- 05000400/LER-1996-006, :on 960325,separation of Valve Stem & Disk for Main FW Isolation Valve Caused Valve to Become Inoperable. Caused by Mfg Defect.Valve Stem Machined & Procedures Revised + (11:15:31, 7 January 2025)
- ML18012A229 + (11:15:33, 7 January 2025)
- ML18012A227 + (11:15:34, 7 January 2025)
- ML18012A226 + (11:15:36, 7 January 2025)
- ML18012A225 + (11:15:37, 7 January 2025)
- ML18012A222 + (11:15:38, 7 January 2025)
- HNP-96-056, Submits Response to NRC GL 96-01, Testing of Safety-Related Logic Circuits + (11:15:39, 7 January 2025)
- ML18012A219 + (11:15:41, 7 January 2025)
- ML18012A218 + (11:15:42, 7 January 2025)
- HNP-96-071, Forwards Addl Info Re NPDES Permit non-compliance Condition Originally Reported on 960329 + (11:15:43, 7 January 2025)
- HNP-96-023, Clarifies Commitments Re Macroscopic Biological Fouling + (11:15:45, 7 January 2025)
- 05000400/LER-1996-005-01, :on 960312,failure to Properly Test Containment Bldg Outer Personnel Air Lock Door Occurred.Caused by Personnel Error.Individual Involved Counseled.W/Undated Ltr + (11:15:47, 7 January 2025)
- HNP-96-059, Monthly Operating Rept for Mar 1996 for Harris Nuclear Plant + (11:15:49, 7 January 2025)
- HNP-96-063, Forwards Rept Per 10CFR50.59(b)(c) of Changes,Tests & Experiments for Plant for 940712-951212 + (11:15:51, 7 January 2025)
- HNP-96-048, Forwards Rev 26 to PLP-201, Shearon Harris Nuclear Power Plant Emergency Plan, Including Changes to Eals,Staffing, Facility/Equipment Improvements,Emergency Response & Clerical & Grammatical Error + (11:15:53, 7 January 2025)
- HNP-96-055, Forwards 30-day Response to NRC Bulletin 96-001, Control Rod Insertion Problems + (11:15:54, 7 January 2025)
- HNP-96-058, Responds to NRC Re Violation Noted in Insp Rept 50-400/96-01.C/A:training Performed to re-emphasize Requirements for Reactor Auxiliary Bldg Emergency Exhaust Sys Boundary Doors & Radiation Work Permits Revised + (11:15:56, 7 January 2025)
- HNP-96-047, Requests Prior Approval for Rev to HNP Emergency Plan,Table 2.2-1 + (11:15:58, 7 January 2025)
- ML18012A195 + (11:16:01, 7 January 2025)
- 05000400/LER-1996-004, :on 960205,RWST Level Transmitters Failed & Violation of TS Action Statement Occurred.Caused by Freezing of Level Transmitter Sensing Lines.Frozen Lines Thawed & Missing Insulation Replaced + (11:16:05, 7 January 2025)
- HNP-96-054, NPDES Noncompliance Notification:On 960326 Internal Audit Identified Concern W/Sampling Frequency for Fecal Coliform at Heec Outfall.Investigation in Progress & Upon Completion Results Will Be Communicated + (11:16:06, 7 January 2025)
- IR 05000400/1996001 + (11:16:46, 7 January 2025)
- NUREG/CR-7240, Impact of Operating Parameters on Extended BWR Burnup Credit + (11:16:48, 7 January 2025)
- ML18012A190 + (11:16:52, 7 January 2025)
- ML18012A188 + (11:16:53, 7 January 2025)
- PNO-II-96-021, on 960324,notified of Unit Shutdown in Excess of 72-h to Repair FW Isolation Valve.Licensee Plans Call for Valve Repairs to Be Completed & Plant start-up to Commence on or After 960327 + (11:16:55, 7 January 2025)
- ML18012A185 + (11:16:57, 7 January 2025)
- ML18012A183 + (11:16:58, 7 January 2025)
- ML18012A181 + (11:16:59, 7 January 2025)
- HNP-96-031, Application for Amend to License NPF-63,relocating TS 3.3.3.2, Movable Incore Detectors & Associated Bases, Consistent w/NUREG-1431 & GL 95-10 + (11:17:00, 7 January 2025)
- ML18012A179 + (11:17:02, 7 January 2025)
- ML18012A178 + (11:17:02, 7 January 2025)
- HNP-96-040, Requests Approval to Use Alternate to ASME Boiler & Pressure Vessel Code Requirements for Sys Hydrostatic Testing of Class 1,2 & 3 Sys + (11:17:03, 7 January 2025)
- Press Release-18-002, Registration Opens for NRCs 2018 Regulatory Information Conference + (11:17:05, 7 January 2025)
- 05000400/LER-1995-011, :on 951105,reactor Trip/Safety Injection Occurred During Solid State Protection Sys Testing Due to Failure of Relay Contact & Unplanned ESF Actuation Occurred During Troubleshooting + (11:17:08, 7 January 2025)
- HNP-96-039, Monthly Operating Rept for Feb 1996 for Harris Nuclear Plant + (11:17:09, 7 January 2025)
- ML18012A170 + (11:17:11, 7 January 2025)
- ML18012A169 + (11:17:12, 7 January 2025)
- ML18012A166 + (11:17:13, 7 January 2025)
- ML18012A156 + (11:17:14, 7 January 2025)
- ML18012A155 + (11:17:15, 7 January 2025)
- HNP-96-024, Responds to Administrative Ltr 96-01 Re Operator Licensing National Examination Schedule + (11:17:16, 7 January 2025)