Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18015A012 + (11:05:01, 7 January 2025)
- RAIO-0118-58153, LLC - Supplemental Response to NRC Request for Additional Information No. 180 (Erai No. 9010) on the NuScale Design Certification Application + (11:05:02, 7 January 2025)
- RAIO-0118-58176, LLC Supplemental Response to NRC Request for Additional Information No. 112 (Erai No. 8983) on the NuScale Design Certification Application + (11:05:04, 7 January 2025)
- 3F0118-02, 30-Day Spent Fuel Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pools + (11:05:07, 7 January 2025)
- ML18015A007 + (11:05:07, 7 January 2025)
- ML18012A900 + (11:05:08, 7 January 2025)
- ML18012A887 + (11:05:09, 7 January 2025)
- ML18012A886 + (11:05:10, 7 January 2025)
- ML18012A884 + (11:05:11, 7 January 2025)
- ML18012A882 + (11:05:12, 7 January 2025)
- ML18012A881 + (11:05:14, 7 January 2025)
- ML18012A880 + (11:05:15, 7 January 2025)
- ML18012A879 + (11:05:15, 7 January 2025)
- HNP-97-170, Provides Closeout Documentation Harris Nuclear Plant Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. Plant Will Restore Thermo-Lag Barrier Configurations to Svc & Discontinue Compensatory Actions Accordingly + (11:05:16, 7 January 2025)
- HNP-97-167, Forwards Proprietary Notification of Changes in Reactor Operator & SRO Status.Encl Withheld,Per 10CFR2.790(a)(6) + (11:05:18, 7 January 2025)
- ML18012A869 + (11:05:20, 7 January 2025)
- ML18012A871 + (11:05:20, 7 January 2025)
- 05000263/LER-1917-006, Regarding Loss of Reactor Protection System Scram Function During Main Steam Isolation Valve and Turbine Stop Valve Channel Functional Tests Due to Use of a Test Fixture + (11:05:24, 7 January 2025)
- IR 05000400/1997006 + (11:05:28, 7 January 2025)
- HNP-97-162, Forwards Response to Violations Noted in Insp Rept 50-400/97-04.Corrective Actions:Missile Shield Blocks Were Reinstalled on 970406 within Time Require by Action Statement + (11:05:29, 7 January 2025)
- HNP-97-163, Forwards Exercise Scenario W/Controller Info & Simulation Data for HNP Emergency Preparedness Exercise Scheduled for 971007.Package Reflects Change to Exercise Objectives Previously Submitted in .W/O Encl + (11:05:31, 7 January 2025)
- 05000400/LER-1997-019, :on 970720,turbine Trip/Reactor Trip Occurred. Caused by Three Phase Fault That Collapsed Excitation Field in Main Generator,Resulting in Generator Lockout.Exciter Rotor Assembly Was Replaced + (11:05:34, 7 January 2025)
- ML18012A863 + (11:05:36, 7 January 2025)
- ML18012A862 + (11:05:37, 7 January 2025)
- ML18012A860 + (11:05:38, 7 January 2025)
- HNP-97-161, Monthly Operating Rept for July 1997 for Shnpp + (11:05:39, 7 January 2025)
- 05000400/LER-1996-018, :on 960903,manual Reactor Trip Occurred Due to Loss of Normal Sw.Caused by Mechanical Failure of B Water Pump & a Normal SW to Remain Running Once Manually Started.Restored a Normal SW Pump to Svc + (11:05:42, 7 January 2025)
- 05000400/LER-1996-018-01, Forwards LER 96-018-01 Per 10CFR50.73.Rev Provides Addl Info Related to Cause of a Normal Svc Water Pump Trip That Occurred on 960903,following Loss of Running Normal Svc Water Pump + (11:05:44, 7 January 2025)
- 05000400/LER-1996-013, :on 961028,condition Outside of Design Basis Where RWST Had Been Aligned w/non-seismically Qualified Sys Was Identified.Caused by Failure to Reconcile Operating Procedure Lineups.Established Administrative Controls + (11:05:46, 7 January 2025)
- 05000400/LER-1996-013-02, Forwards LER 96-013-02 Per 10CFR50.73.Rev Reports Results of Addl Analysis That Was Performed to Determine Safety Consequences Associated W/Potential Loss of Ccws + (11:05:49, 7 January 2025)
- HNP-97-146, Forwards Response to NRC Re Violations Noted in Insp Rept 50-400/97-06.Corrective Actions:Compliance Was Achieved on 970608 W/Issuance of Operations Night Order + (11:05:50, 7 January 2025)
- HNP-97-155, Forwards Proprietary Info Re Notification of Change in Reactor Operator Status.Encl Withheld Per 10CFR2.790(a)(6) + (11:05:54, 7 January 2025)
- 05000400/LER-1997-018, :on 970701,determined That Plant Procedures Had Not Received Proper Reviews & Approvals.Caused by Failure to Comply W/Plant Administrative Procedure AP-006.Counseled Involved Individuals + (11:05:56, 7 January 2025)
- HNP-97-148, Submits Change in Schedule for Completion of Corrective Actions Made in Response to Violation Noted in Insp Rept 50-400/96-06 + (11:05:57, 7 January 2025)
- HNP-97-152, Forwards 120-day Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations + (11:05:59, 7 January 2025)
- ML18012A844 + (11:06:01, 7 January 2025)
- HNP-97-147, Responds to NRC Re Violations Noted in Insp Rept 50-400/96-01.Corrective Actions:Seven Doors Were Alarmed & Ten Doors Were Locked Requiring Operations Approval of Breach Request Prior to Blocking Open + (11:06:02, 7 January 2025)
- ML18012A842 + (11:06:05, 7 January 2025)
- ML18012A841 + (11:06:09, 7 January 2025)
- ML18012A839 + (11:06:10, 7 January 2025)
- ML18012A838 + (11:06:11, 7 January 2025)
- HNP-97-149, Forwards LER 97-S01-00,describing Instances Involving Contract Outage Workers Being Inappropriately Granted Access at Plant During Refueling Outage 7 + (11:06:12, 7 January 2025)
- ML18012A837 + (11:06:12, 7 January 2025)
- HNP-97-136, Notifies NRC of Schedule Change for Util Conversion to Improved Std TS for Hnp.Nrc License Amend Issuance Will Be Requested by July 2000 + (11:06:14, 7 January 2025)
- PNO-II-97-040, on 970720,automatic Reactor Trip Occurred Due to Main Generator Lockout.Main Generator Lockout Caused by Loss of Generator Excitation Caused by Electrical Fault in Exciter.Afws Automatically Started as Expected + (11:06:18, 7 January 2025)
- HNP-97-142, Monthly Operating Rept for June 1997 for Shearon Harris Nuclear Power Plant + (11:06:19, 7 January 2025)
- HNP-97-132, Forwards Response to Violations Noted in Insp Rept 50-400/97-04.Corrective Actions:New Operations Mgt Team Has Been Put in Place & re-evaluation Was Also Conducted for Current Supervisory Assignments + (11:06:21, 7 January 2025)
- 05000400/LER-1997-017, :on 970612,failed to Recognize Inoperable Reactor Afd Monitor.Caused by Personnel Error.Operators Involved in Event Will Be Counseled Prior to Assuming Shift Duties + (11:06:24, 7 January 2025)
- HNP-97-130, Forwards Proprietary List of SROs That Have Been Reassigned within Util from Position Which Util Previously Certified Need for SRO License.Termination of Licenses,Requested. Encl Withheld,Per 10CFR2.790(a)(6) + (11:06:25, 7 January 2025)
- HNP-97-133, Submits Emergency Preparedness Exercise Scope & Objectives 75 Day Submittal for Exercise Scheduled for 971007 + (11:06:27, 7 January 2025)
- 05000400/LER-1997-015, :on 970602,inadequate Auxiliary Feedwater Sys Flow Control Valve Surveillance Testing Deficiency Was Identified.Caused by Failure to Recognize Impact on TS 4.7.1.2.1.Readjusted AFW FCV Actuator Spring + (11:06:29, 7 January 2025)