- HNP-98-089, Forwards Revised Response to NRC 971217 Request for Addl Info Re TS Change Request to Allow Use of SG Tube Sleeves Designed by ABB-CE.Next Plant Refueling Outage Currently Scheduled to Commence 981024 + (10:58:59, 7 January 2025)
- ML18016A526 + (10:59:01, 7 January 2025)
- ML18016A523 + (10:59:02, 7 January 2025)
- HNP-98-116, Forwards Revised Epips,Including Rev 3 to PEP-230, Control Room Operations, Rev 3 to PEP-240, Activation & Operation of TSC, Rev 7 to PEP-250, Activation & Operation of Joint Info Center, Rev 3 to PEP-260, Activation & Operation. + (10:59:03, 7 January 2025)
- HNP-98-106, Withdraws Relief Requests 2R1-003,2R1-004,2R1-006,2R1-008, 2R1-011,2R2-001,2R2-003 & 2R2-005 Which Were Submitted as Part of Second ten-yr ISI Program Plan.New ISI Relief Request 2RG-009 Provided.Isi Relief Request 2RG-008 Revised + (10:59:05, 7 January 2025)
- ML18016A518 + (10:59:07, 7 January 2025)
- IR 05000400/1998006 + (10:59:08, 7 January 2025)
- ML18016A513 + (10:59:09, 7 January 2025)
- ML18016A511 + (10:59:10, 7 January 2025)
- HNP-98-113, Provides Proprietary Notification That Reactor Operator Licensed on Harris Nuclear Plant Has Terminated Employment W/Util,Effective 980801.Encl Withheld Per 10CFR2.790(a)(6) + (10:59:11, 7 January 2025)
- HNP-98-114, Monthly Operating Rept for Jul 1998 for Shearon Harris Nuclear Plant + (10:59:13, 7 January 2025)
- ML18016A505 + (10:59:14, 7 January 2025)
- HNP-98-112, Application for Amend to License NPF-63,deleting SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fuel Handling Bldg Emergency Exhaust Sys Is Locked in Balanced Position at Least Once Per 18 Months + (10:59:15, 7 January 2025)
- ML18016A502 + (10:59:18, 7 January 2025)
- ML18016A501 + (10:59:19, 7 January 2025)
- ML18016A499 + (10:59:20, 7 January 2025)
- IR 05000400/1998004 + (10:59:21, 7 January 2025)
- ML18016A497 + (10:59:22, 7 January 2025)
- TAC:MA0467 + (10:59:23, 7 January 2025)
- ML18016A493 + (10:59:24, 7 January 2025)
- ML18016A496 + (10:59:24, 7 January 2025)
- HNP-98-103, Forwards Written Response to 980528 RAI Re GSI 165, Spring- Actuated Safety & Relief Valve Reliability + (10:59:25, 7 January 2025)
- IR 05000400/1998001 + (10:59:27, 7 January 2025)
- HNP-98-093, Responds to NRC Re Violations Noted in Insp Rept 50-400/98-04.Corrective Actions:Tag for Equipment Clearance 98-00444 Was Properly Hung for Valve 1MS-63 + (10:59:28, 7 January 2025)
- HNP-98-102, Requests Change to NRC Service/Distribution List to Reflect Recent Mgt Change at Cp&L.Personnel Changes & Dates Are Listed + (10:59:30, 7 January 2025)
- HNP-98-096, Monthly Operating Rept for June 1998 for Shnpp + (10:59:32, 7 January 2025)
- ML18016A485 + (10:59:34, 7 January 2025)
- 05000400/LER-1997-002, :on 970207,determined That Cold Weather Conditions Resulted in Mfiv Being Potentially Inoperable During Period 970117-20.Caused by Inadequate Design of HVAC Sys.Implemented Mods to Steam Tunnel HVAC Sys + (10:59:35, 7 January 2025)
- 05000400/LER-1997-002-01, Fowards LER 97-002-01,IAW 10CFR50.73.Rev Provides Addl Corrective Actions Taken to Address Low Temps in Area of Mfiv + (10:59:37, 7 January 2025)
- TAC:MA1285 + (10:59:39, 7 January 2025)
- ML18016A480 + (10:59:39, 7 January 2025)
- ML18016A479 + (10:59:40, 7 January 2025)
- ML18016A476 + (10:59:41, 7 January 2025)
- ML18016A475 + (10:59:42, 7 January 2025)
- IR 05000400/1998003 + (10:59:43, 7 January 2025)
- ML18016A473 + (10:59:45, 7 January 2025)
- ML18016A471 + (10:59:46, 7 January 2025)
- 05000400/LER-1997-021, :on 980210,discovered That SFP Water Level Had Not Been Verified Greater than 23 Feet Above BWR Fuel Assemblies.Caused by Misinterpretation of TS Requirements. Will Submit TS Change Request to Revise TS 3.9.1.11 + (10:59:47, 7 January 2025)
- 05000400/LER-1997-021-03, Forwards LER 97-021-03,per 10CFR50.73.Rev Provided New Scheduled Completion Date of 980901 for TS Change Request Described in Planned Correction Action Number 1 + (10:59:49, 7 January 2025)
- ML18016A466 + (10:59:53, 7 January 2025)
- HNP-98-092, Provides Revised Response to NRC Re Violations Noted in Insp Rept 50-400/98-01.Corrective Actions:Fire Seal P 3308 & Two Addl Fire Seals (P 661 & P 671) Have Been Evaluated & Determined Operable & Procedure CMP-010 Revised + (10:59:54, 7 January 2025)
- TAC:M98857 + (10:59:56, 7 January 2025)
- HNP-98-074, Forwards Response to 980225 RAI Re Proposed Amend to TS 3/4.6.2 Re Depressurization & Cooling Systems.Info Requested to Be Provided within 30 Days of End of Next Refueling Outage,Which Is Scheduled to Commence 981024 + (10:59:57, 7 January 2025)
- ML18016A461 + (10:59:59, 7 January 2025)
- TAC:M99996 + (11:00:00, 7 January 2025)
- HNP-98-025, Informs of Mod to Commitment to Perform Comprehensive Review of Implementation of TS Surveillance Requirements + (11:00:01, 7 January 2025)
- ML18016A458 + (11:00:01, 7 January 2025)
- HNP-98-082, Discusses Commitment to Joint Owners Group Program,MPR-1807, Rev 2 Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs + (11:00:03, 7 January 2025)
- HNP-98-085, Monthly Operating Rept for May 1998 for Shearon Harris Nuclear Power Plant + (11:00:05, 7 January 2025)
- ML18016A450 + (11:00:07, 7 January 2025)
- 05000400/LER-1998-006, :on 980508,failure to Perform Insp & Preventive Maint on MCCB as Required by TS Was Noted.Caused by Inadequate Sps.Tested 9 Pressurizer Heater Bank Breakers by Cycling Each + (11:00:08, 7 January 2025)