Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18016A632 + (10:57:43, 7 January 2025)
- ML18016A631 + (10:57:43, 7 January 2025)
- ML18016A630 + (10:57:44, 7 January 2025)
- ML18016A629 + (10:57:44, 7 January 2025)
- ML18016A628 + (10:57:45, 7 January 2025)
- ML18016A627 + (10:57:46, 7 January 2025)
- ML18016A626 + (10:57:46, 7 January 2025)
- HNP-98-147, Informs That Util Proposes to Fully Implement Guidance Provided by GL 93-05 with Regard to Modifying TS 3/4.5.1 Surveillance Requirements.Encl 1 Provides Response to Rai. Encl 2 Provides Revised TS Pages Change Instructions + (10:57:47, 7 January 2025)
- HNP-98-148, Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With + (10:57:50, 7 January 2025)
- ML18016A622 + (10:57:50, 7 January 2025)
- HNP-98-149, Forwards Proprietary Notification of Change in Medical Certification for Sro.Name,Docket Number & License Number for Individual,Encl.Proprietary Info Withheld,Per Provisions of 10CFR2.790(a)(6) + (10:57:52, 7 January 2025)
- ML18016A616 + (10:57:54, 7 January 2025)
- HNP-98-133, Submits Info Required Per 10CFR50.46(a)(3)(ii),re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models + (10:57:55, 7 January 2025)
- HNP-98-141, Application for Amend to License NPF-63,further Revising TS 3.0.4 to Clarify Intent Re Mode Changes as Discussed in Proposed Bases.Change to Retyped Page TS 3.9.9,encl + (10:57:57, 7 January 2025)
- ML18016A605 + (10:57:57, 7 January 2025)
- TAC:M96818 + (10:57:59, 7 January 2025)
- HNP-98-097, Forwards Response to NRC 971215 RAI Re Plant Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. with Twelve Oversize Design Configuration Drawings + (10:58:00, 7 January 2025)
- HNP-98-142, Requests That Name & Docket Number of Each Candidate Re Hot License Applications & Encl NRC Forms 396 & 398 Be Exempt from Public Disclosure Under Provisions of 10CFR2.790(a)(6).Without Encl + (10:58:02, 7 January 2025)
- ML18016A599 + (10:58:02, 7 January 2025)
- ML18016A597 + (10:58:04, 7 January 2025)
- HNP-98-138, Forwards mid-cycle Rev 1 to Harris Unit 1 Colr. Rev Revises Mtc Surveillance Limit from -36.4 Pcm/F to -37.65 Pcm/F Using NRC Reviewed & Approved Methodology + (10:58:05, 7 January 2025)
- ML18016A594 + (10:58:10, 7 January 2025)
- HNP-98-091, Application for Amend to License NPF-63,revising TS 3/4.6.1.3 to Be Consistent with NUREG-1431,rev 1 Std Tech Specs,W Plants, Dtd Apr 1995 & to Clarify Requirements for Locking Air Lock Door Shut + (10:58:11, 7 January 2025)
- HNP-98-137, Submits Revised Response to NRC SBO Rule for HNP + (10:58:13, 7 January 2025)
- HNP-98-131, Forwards Two Reactor Operator Hot License Applications & Five Senior Reactor Operator Hot License Applications for Harris Nuclear Plant.Without Encl + (10:58:15, 7 January 2025)
- HNP-98-132, Monthly Operating Rept for Aug 1998 for Shnpp,Unit 1.With + (10:58:16, 7 January 2025)
- HNP-98-136, Forwards Proprietary Info Re SRO Licensed on Shnpp Who Has Been Reassigned from Position for Which CP&L Previously Certified Need for SRO License.Termination of Subject License,Requested.Proprietary Info Withheld,Per 10CFR2.790 + (10:58:18, 7 January 2025)
- HNP-98-129, Forwards Written Response to 980901 Telcon Requesting Addl Info Re Respone to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity + (10:58:20, 7 January 2025)
- ML18016A583 + (10:58:22, 7 January 2025)
- ML18016A581 + (10:58:23, 7 January 2025)
- TAC:MA0433 + (10:58:25, 7 January 2025)
- ML18016A576 + (10:58:25, 7 January 2025)
- ML18016A574 + (10:58:26, 7 January 2025)
- ML18016A571 + (10:58:27, 7 January 2025)
- ML18016A569 + (10:58:28, 7 January 2025)
- ML18016A565 + (10:58:29, 7 January 2025)
- ML18016A557 + (10:58:30, 7 January 2025)
- ML18016A554 + (10:58:31, 7 January 2025)
- ML18016A552 + (10:58:32, 7 January 2025)
- ML18016A547 + (10:58:32, 7 January 2025)
- ML18016A546 + (10:58:33, 7 January 2025)
- HNP-98-128, Application for Amend to License NPF-63,revising TS 3/4.9.11 to Require 23 Feet of Water Above Top of Fuel Rods within Irradiated Fuel Assemblies Seated in Storage Racks + (10:58:34, 7 January 2025)
- HNP-98-120, Submits Response to Request for Addl Info Re Auxiliary Feedwater Sys Surveillance Requirements at Plant + (10:58:36, 7 January 2025)
- HNP-98-098, Requests Delay in Submitting Response to 980624 Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conclusions, Due to Participation in Project W/Epri & NEI + (10:58:37, 7 January 2025)
- HNP-98-119, Application for Amend to License NPF-63,revising TS Re Applicability of LCO & Surveillance Requirements,Per GL 87-09 + (10:58:40, 7 January 2025)
- ML18016A541 + (10:58:40, 7 January 2025)
- ML18016A538 + (10:58:52, 7 January 2025)
- HNP-98-087, Provides Rev to 970612 Request for License Amend to Revise TS 6.0, Administrative Controls, Based on Recent Discussion W/Nrc.Proposed New TS 6.2.2.f Which Used Term Operations Middle Manager Removed.Revised TS Pages Encl + (10:58:53, 7 January 2025)
- HNP-98-117, Forwards Rev 33 to Shearon Harris Nuclear Power Plant Emergency Plan.Changes Incorporated by Rev 33 Includes Listed Eight Categories + (10:58:55, 7 January 2025)
- ML18016A532 + (10:58:57, 7 January 2025)
- ML18016A531 + (10:58:58, 7 January 2025)