Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PLA-1313, Forwards Susquehanna Steam Electric Station Radiological Environ Monitoring Program,1981 + (07:59:45, 7 January 2025)
- PLA-1275, Forwards Handouts Provided at 820825 Meeting,Including Repts, Investigation of Unit 1 Small Piping Sys Design Installation & Insp Program Adequacy & Implementation & Suppl to Investigation of Unit 1 Small Piping Sys. + (07:59:47, 7 January 2025)
- ML18031A395 + (07:59:50, 7 January 2025)
- ML18031A394 + (07:59:51, 7 January 2025)
- PLA-1298, Forwards Responses to NRC Questions Re Small Bore Pipe. Twelve Oversize Drawings Encl,Including Three Illegible. Aperture Cards Are Available in PDR + (07:59:52, 7 January 2025)
- PLA-1254, Responds to SER Suppl 3 Section 3.11.5(2)(a) Re Qualification Updates,Revised Justifications for Interim Operation & Addl Info Required Prior to Exceeding 5% Power. Harsh Environ Class IE Equipment Addressed + (07:59:54, 7 January 2025)
- ML18031A388 + (07:59:57, 7 January 2025)
- PLA-1228, Forwards Updated Preservice Insp Program Info Re SER Issue 19.Revision Includes Preservice Exams Performed Subsequent to Util 810519,0616 & 820523 Submittals + (07:59:58, 7 January 2025)
- ML18031A386 + (08:00:00, 7 January 2025)
- ML18031A384 + (08:00:02, 7 January 2025)
- PLA-1191, Forwards Results of Facility Entrainment Demonstration Program Developed to Meet Requirements of Special Condition C,Part C of NPDES Permit PA 0047325 + (08:00:03, 7 January 2025)
- PLA-1177, Discusses Diesel Generator Surveillance Requirements Resulting from 820708 meeting.As-built Installation of Diesel Generator Starting Sys Meets Design Bases Delineated in FSAR Section 9.5.6.1 & Conforms W/Srp Requirements + (08:00:07, 7 January 2025)
- ML18031A381 + (08:00:07, 7 January 2025)
- PLA-1179, Responds to 820707 Request Re Walkdown of Masonry Walls in Control Bldg.No safety-related Items Found Attached to or in Vicinity of Subj Walls + (08:00:10, 7 January 2025)
- PLA-1182, Requests Tech Spec Section 3.11.1.1 Exemption to Delete Max Permissible Concentration for Xe-131m from Tabled Limits for Dissolved or Entrained Noble Gases.Isotope Will Not Be Significant Dose Contributor + (08:00:12, 7 January 2025)
- PLA-1185, Submits Results of Five Sequential Starts of Diesel Generator W/Compressors Secured,As Described in Util + (08:00:13, 7 January 2025)
- PLA-1170, Requests Tech Spec Change to Carbon Dioxide Storage Tank Available Capacity for Fire Protection Applications,From 90% of Capacity to 25% of Capacity.Bechtel Ltr Re Tank Capacity Encl + (08:00:19, 7 January 2025)
- PLA-1172, Justifies Need for Footnote Not Accessible on Tech Spec Table 3.3.7.9-1.Instruments Are Under Raised Floor & Above False Ceiling of Control Room + (08:00:21, 7 January 2025)
- PLA-1166, Advises That Util Will Perform Fire Test of Tsi,Inc Fire Barrier Matl Prior to Escalation Above 5% Power + (08:00:23, 7 January 2025)
- PLA-1168, Forwards Addl Info Re Masonry Block Walls Per 820702 Telcon Request.Sink Supports Located on Wall Will Be Removed to Meet Allowable Stress Conditions.Bench Attached to Block Wall Will Be Removed from Wall Prior to Fuel Load + (08:00:26, 7 January 2025)
- ML18031A370 + (08:00:28, 7 January 2025)
- PLA-1164, Responds to Structural Engineering Branch Questions Re Vertical Dynamic Analysis,Discussed During 820629 Meeting & 0630 Telcon.Drawings of Diesel Generator Bldg Floor Plan & Structural Steel Encl + (08:00:29, 7 January 2025)
- ML18031A368 + (08:00:31, 7 January 2025)
- ML18031A367 + (08:00:32, 7 January 2025)
- PLA-1159, Informs That Revised Seismic Response Spectra,Resulting from Recent Vertical Dynamical Model Assessment,Will Be Incorporated in Design Work Specs by End of 1982 + (08:00:33, 7 January 2025)
- PLA-1161, Informs That Schedule for Gas Pipeline Revised.Analysis Will Be Complete by Feb 1983.Physical Configuration Changes Will Be Implemented by Sept 1984 + (08:00:35, 7 January 2025)
- PLA-1139, Forwards Seismic Qualification Review Team Forms for NSSS Equipment.Remaining Review Team Forms or Justification of Interim Operations Will Be Supplied During 820628 Meeting + (08:00:38, 7 January 2025)
- ML18031A360 + (08:00:40, 7 January 2025)
- ML18031A359 + (08:00:42, 7 January 2025)
- IR 05000247/2017010 + (08:00:43, 7 January 2025)
- ML18031A357 + (08:00:45, 7 January 2025)
- PLA-1084, Forwards Environ Qualification Justification for Interim Operation of Class IE Equipment Per NUREG-0588.Tech Specs Meet Qualifications Contained in Generic Ltr 82-09 + (08:00:46, 7 January 2025)
- PLA-1089, Forwards Ecological Studies of Susquehanna River in Vicinity of Susquehanna Steam Electric Station, 1981 Annual Rept + (08:00:49, 7 January 2025)
- ML18031A350 + (08:00:51, 7 January 2025)
- ML18031A349 + (08:00:52, 7 January 2025)
- ML18031A348 + (08:00:53, 7 January 2025)
- ML18031A347 + (08:00:54, 7 January 2025)
- ML18031A346 + (08:00:55, 7 January 2025)
- ML18031A344 + (08:00:56, 7 January 2025)
- ML18031A343 + (08:00:57, 7 January 2025)
- ML18031A341 + (08:00:58, 7 January 2025)
- ML18031A340 + (08:00:59, 7 January 2025)
- ML18031A339 + (08:01:00, 7 January 2025)
- ML18031A338 + (08:01:02, 7 January 2025)
- ML18031A337 + (08:01:03, 7 January 2025)
- ML18031A336 + (08:01:04, 7 January 2025)
- ML18031A335 + (08:01:05, 7 January 2025)
- ML18031A333 + (08:01:05, 7 January 2025)
- ML18031A332 + (08:01:06, 7 January 2025)
- ML18031A331 + (08:01:08, 7 January 2025)
- ML18031A330 + (08:01:09, 7 January 2025)