Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RIS 2014-06, Consideration of Current Operating Issues and Licensing Actions in License Renewal + (04:55:35, 7 February 2025)
- SECY-22-0043, Response to Ronald Lattanze Appeal Letter to the NRC to the NRC Information Quality Coordinator Dated May 12, 2023 SECY-22-0043, Petition for Rulemaking and Rulemaking Plan on Reporting Nuclear Medicine Injection Extravasations as Medic + (04:58:27, 7 February 2025)
- NUREG-1600, PR-MISC - 62FR06677 - (NUREG-1600) Policy and Procedure for Enforcement Actions, Policy Statement Amendment + (05:00:27, 7 February 2025)
- ML23153A085 + (05:04:20, 7 February 2025)
- ML23151A736 + (05:05:48, 7 February 2025)
- ML23151A735 + (05:05:49, 7 February 2025)
- ML23151A734 + (05:05:50, 7 February 2025)
- ML23151A454 + (05:07:59, 7 February 2025)
- L-2023-063, Enclosure 2, Volume 13: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.8, Electrical Power Systems, Revision 3 + (05:08:03, 7 February 2025)
- ML23150A164 + (05:09:11, 7 February 2025)
- ML23150A161 + (05:09:13, 7 February 2025)
- ML23150A160 + (05:09:14, 7 February 2025)
- ML23150A159 + (05:09:15, 7 February 2025)
- ML23150A158 + (05:09:16, 7 February 2025)
- ML23146A080 + (05:09:43, 7 February 2025)
- ML23146A078 + (05:09:45, 7 February 2025)
- ML23146A077 + (05:09:47, 7 February 2025)
- ML23146A071 + (05:09:50, 7 February 2025)
- ML23146A070 + (05:09:52, 7 February 2025)
- ML23145A305 + (05:10:01, 7 February 2025)
- ML23145A304 + (05:10:02, 7 February 2025)
- ML23145A303 + (05:10:04, 7 February 2025)
- ML23145A300 + (05:10:09, 7 February 2025)
- ML23145A299 + (05:10:10, 7 February 2025)
- 05000318/LER-2023-001, Condition Prohibited by Technical Specifications Due to Inoperable Nuclear Instrumentation at Very Low Power + (05:16:20, 7 February 2025)
- L-04-002, Stations - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Fleet Response to Request for Additional Information + (05:19:25, 7 February 2025)
- ML23122A111 + (05:22:43, 7 February 2025)
- ML23122A098 + (05:22:46, 7 February 2025)
- Regulatory Guide 1.212 + (05:23:41, 7 February 2025)
- 05000333/LER-2022-003-01, Safety Relief Valves Lift Setpoint Found Out of Tolerance Low + (05:24:01, 7 February 2025)
- 05000313/LER-2023-001, Automatic Reactor Trip Due to Reactor Protection System Actuation + (05:30:31, 7 February 2025)
- ML23102A192 + (05:32:17, 7 February 2025)
- ULNRC-06806, Submittal of Radiological Emergency Response Plan, Revision 55 + (05:32:20, 7 February 2025)
- 05000155/LER-2023-001, Human Performance Error Resulted in Compensatory Measures Not Properly Employed + (05:32:45, 7 February 2025)
- ML23095A022 + (05:35:02, 7 February 2025)
- L-2023-043, Enclosure 2 - ITS Section 3.8 Electrical Power Systems, Revision 2, Volume 13 + (05:35:06, 7 February 2025)
- 05000461/LER-2023-001, Grid Fault Results in Switchyard Breaker Trips and Reactor Scram + (05:35:44, 7 February 2025)
- 05000400/LER-2022-006-01, Auxiliary Feedwater Pump Inoperability + (05:40:45, 7 February 2025)
- STC-22-015, Notification of Public Meetings Regarding the Issuance of Proposed Rule and Notice of Availability of the Draft Revised Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437, Draft Revision 2) + (05:42:45, 7 February 2025)
- ULNRC-06802, Special Report 2023-01 (PAM Report); Non-Functionality of a Post-Accident Monitoring Instrument + (05:45:04, 7 February 2025)
- ML23067A258 + (05:45:39, 7 February 2025)
- ML23067A254 + (05:45:40, 7 February 2025)
- ML23067A253 + (05:45:43, 7 February 2025)
- ML23067A246 + (05:45:44, 7 February 2025)
- ML23067A242 + (05:45:46, 7 February 2025)
- NRC-2008-0252, Comment (1) of Anonymous Individual on Southern Nuclear Operating Company Inc., Vogtle Electric Generating Plant, Unit 4 + (05:46:20, 7 February 2025)
- ML23061A183 + (05:48:55, 7 February 2025)
- 05000311/LER-2022-001, Invalid Safety Injection and Valid Reactor Trip Due to Inaccurate Steam Generator Pressure Indications + (05:53:25, 7 February 2025)
- DT-17-21, Enclosure 3 - Management Directive 10.166, Telework + (05:55:23, 7 February 2025)
- 05000374/LER-2022-003-01, Manual Scram Due to Lsophase Bus Duct Fire Followed by 2A RPS Normal Power Supply Trip + (05:59:41, 7 February 2025)
- ML23038A167 + (06:00:39, 7 February 2025)