Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-29067, Updates 871218 Response to Insp Rept 50-458/87-27.QA Surveillance OS-87-12-51 Performed to Satisfy Commitment to Ensure That Appropriate Procedures Identifed & Controlled for Approval,In Accordance W/Tech Specs 6.5.2.1 & 6.8.1 + (23:54:48, 7 December 2024)
- ML20205D880 + (23:54:49, 7 December 2024)
- 05000440/LER-1986-035, :on 860714,RWCU Sys Automatically Isolated While Discharging Water to Main Condenser During Normal Operation.Caused by Technician Inadvertently Skipping Surveillance Instruction Step + (23:54:51, 7 December 2024)
- ML20205D874 + (23:54:52, 7 December 2024)
- ML20205D870 + (23:54:53, 7 December 2024)
- ML20205D868 + (23:54:54, 7 December 2024)
- ML20205D864 + (23:54:57, 7 December 2024)
- ML20205D865 + (23:54:57, 7 December 2024)
- ML20205D860 + (23:54:58, 7 December 2024)
- ML20205D857 + (23:54:59, 7 December 2024)
- ML20205D851 + (23:55:00, 7 December 2024)
- ML20205D853 + (23:55:00, 7 December 2024)
- ML20205D850 + (23:55:01, 7 December 2024)
- IR 05000275/1987009 + (23:55:02, 7 December 2024)
- ML20205D847 + (23:55:03, 7 December 2024)
- ML20205D845 + (23:55:03, 7 December 2024)
- ML20205D843 + (23:55:04, 7 December 2024)
- ML20205D839 + (23:55:05, 7 December 2024)
- ML20205D842 + (23:55:05, 7 December 2024)
- ML20205D835 + (23:55:06, 7 December 2024)
- ML20205D833 + (23:55:07, 7 December 2024)
- ML20205D834 + (23:55:07, 7 December 2024)
- ML20205D831 + (23:55:08, 7 December 2024)
- ML20205D827 + (23:55:09, 7 December 2024)
- ML20205D825 + (23:55:09, 7 December 2024)
- JPN-99-008, Forwards Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433, Rev 1.Synopsis of LAR for Conversion to Its,Pending Lars, List of Subsections,Scope of Changes & Commitments,Encl + (23:55:10, 7 December 2024)
- ML20205D819 + (23:55:11, 7 December 2024)
- ML20205D818 + (23:55:12, 7 December 2024)
- ML20205D815 + (23:55:14, 7 December 2024)
- ML20205D810 + (23:55:15, 7 December 2024)
- 05000327/LER-1986-029, :on 850118,ERCW Pump K-A Failed to Meet Acceptance Criteria as Determined by Measured Total Flow Rate & Appropriate Baseline Curve.Caused by Personnel Error. Operating Procedures Will Be Revised + (23:55:17, 7 December 2024)
- ML20205D806 + (23:55:18, 7 December 2024)
- ML20205D805 + (23:55:19, 7 December 2024)
- ML20205D804 + (23:55:20, 7 December 2024)
- ML20205D801 + (23:55:20, 7 December 2024)
- ML20205D800 + (23:55:21, 7 December 2024)
- 05000270/LER-1986-004-05, :on 860708,reactor Tripped from 100% Full Power When Turbine & Main Feedwater Pumps Tripped.Caused by Failure of Feedwater Flow Transmitter A2.Unit Stabilized in Hot Shutdown Conditions + (23:55:23, 7 December 2024)
- ML20205D798 + (23:55:24, 7 December 2024)
- ML20205D797 + (23:55:25, 7 December 2024)
- ML20205D791 + (23:55:27, 7 December 2024)
- ML20205D790 + (23:55:28, 7 December 2024)
- IR 05000458/1999002 + (23:55:29, 7 December 2024)
- ML20205D788 + (23:55:30, 7 December 2024)
- ML20205D787 + (23:55:30, 7 December 2024)
- 3F0399-10, Forwards Rev 7-2 to Crystal River Unit 3 Psp.Plan Withheld from Public Disclosure,Per 10CFR73.21 + (23:55:32, 7 December 2024)
- IR 05000250/1986029 + (23:55:32, 7 December 2024)
- ML20205D783 + (23:55:33, 7 December 2024)
- ML20205D780 + (23:55:34, 7 December 2024)
- ML20205D779 + (23:55:34, 7 December 2024)
- ML20205D777 + (23:55:35, 7 December 2024)
- ML20205D776 + (23:55:36, 7 December 2024)