Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206N136 + (05:17:34, 7 December 2024)
- ML20206N135 + (05:17:35, 7 December 2024)
- ML20206N131 + (05:17:38, 7 December 2024)
- 3F0599-16, Rev 0 to LAR 251 to License DPR-72,revising CR-3 ITS Administrative Controls Section 5.8, High Radiation Area. Util Requests NRC Approval by June 30,2000 + (05:17:39, 7 December 2024)
- 05000414/LER-1986-032, :on 860709,main Feedwater Isolation Occurred Due to hi-hi Level in Steam Generator C.Caused by Leaking Control Valves.Procedures Revised to Isolate Control Valves When Providing Flow W/Control Bypass Valves + (05:17:41, 7 December 2024)
- ML20206N128 + (05:17:42, 7 December 2024)
- ML20206N127 + (05:17:43, 7 December 2024)
- ML20206N125 + (05:17:43, 7 December 2024)
- 05000414/LER-1986-033-01, :on 860711,Phase a Containment Isolation Occurred,Closing Nonessential Containment Penetration Isolation Valves.Cause Not Determined.Valves Will Be Tested to Verify Proper Operation.Tech Specs Will Be Revised + (05:17:46, 7 December 2024)
- ML20206N123 + (05:17:47, 7 December 2024)
- IR 05000352/1999002 + (05:17:50, 7 December 2024)
- 05000373/LER-1986-032, :on 860722 & 0803,discovered That Two Reactor Vessel Low Level Switches Out of Tolerance.Cause Unknown. Level Switches Immediately Recalibr to Normal Setpoint Values.Comprehensive Action Plan Developed + (05:17:51, 7 December 2024)
- ML20206N111 + (05:17:53, 7 December 2024)
- ML20206N110 + (05:17:53, 7 December 2024)
- ML20206N109 + (05:17:54, 7 December 2024)
- B16717, Forwards Addendum 1,Rev 10 to FSAR in Form of Replacement Pages & Addendum 3 to Annual Rept,Including Info Covering Changes Not Included in 970228 Submittal.Addendum 1,Rev 10 to FSAR Filed in Category K + (05:17:55, 7 December 2024)
- ML20206N106 + (05:17:56, 7 December 2024)
- ML20206N105 + (05:17:57, 7 December 2024)
- 05000387/LER-1986-027, :on 860725,w/Unit 1 Operating at 100% Power & Unit 2 Operating at 79% Power,Limiting Condition for Operation 3.0.3 Entered to Perform Surveillance Testing.Tech Spec Change Requested to Clarify Action + (05:17:59, 7 December 2024)
- ML20206N098 + (05:18:00, 7 December 2024)
- 05000341/LER-1986-021, :on 860720,while in Cold Shutdown,Rwcu Inboard Isolation Valve Autoisolated Three Times.Caused by Blown Fuses & Broken Differential Temp Thermocouple Flange.Fuses Replaced + (05:18:03, 7 December 2024)
- ML20206N096 + (05:18:04, 7 December 2024)
- ML20206N091 + (05:18:08, 7 December 2024)
- ML20206N090 + (05:18:08, 7 December 2024)
- ML20206N089 + (05:18:09, 7 December 2024)
- TXX-4932, Responds to Violations Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Corrective Actions:Insp Findings Evaluated & Nonconformance Repts Issued for Valid Deficiencies + (05:18:10, 7 December 2024)
- IR 05000333/1999003 + (05:18:14, 7 December 2024)
- ML20206N085 + (05:18:16, 7 December 2024)
- ML20206N082 + (05:18:16, 7 December 2024)
- 05000213/LER-1986-040, :on 860724,discovered That No 3-inch Diameter or Equivalent Opening Present in RCS Pressure Boundary During Low Temp Surveillance Test.Caused by Conflicting Tech Spec Test.Performance Interval Changed + (05:18:18, 7 December 2024)
- TXX-4955, Responds to Violations Noted in Insp Rept 50-445/85-14. Corrective Actions:Past CHM-501-1 & CHM-508-1 Data Sheets Reviewed.No Significant Unresolved Chemistry Concerns Exist + (05:18:20, 7 December 2024)
- ML20206N075 + (05:18:21, 7 December 2024)
- ML20206N074 + (05:18:22, 7 December 2024)
- ML20206N071 + (05:18:23, 7 December 2024)
- ML20206N072 + (05:18:23, 7 December 2024)
- ML20206N069 + (05:18:24, 7 December 2024)
- ML20206N063 + (05:18:26, 7 December 2024)
- ML20206N060 + (05:18:27, 7 December 2024)
- ML20206N059 + (05:18:29, 7 December 2024)
- ML20206N056 + (05:18:30, 7 December 2024)
- 05000316/LER-1986-024, :on 860718,ESF Actuation Occurred Due to hi-hi Steam Generator Level.Caused by Failed Amplifier in Feedwater Flow Transmitter.Plant Procedures Implemented. Investigation Continuing + (05:18:32, 7 December 2024)
- ML20206N048 + (05:18:33, 7 December 2024)
- ML20206N052 + (05:18:33, 7 December 2024)
- ML20206N047 + (05:18:34, 7 December 2024)
- ML20206N046 + (05:18:35, 7 December 2024)
- ML20206N044 + (05:18:35, 7 December 2024)
- ML20206N042 + (05:18:36, 7 December 2024)
- ML20206N039 + (05:18:37, 7 December 2024)
- ML20206N038 + (05:18:38, 7 December 2024)
- ML20206N037 + (05:18:38, 7 December 2024)
- ML20206N036 + (05:18:39, 7 December 2024)