Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206P761 + (04:57:27, 7 December 2024)
- 05000269/LER-1998-018, :on 981209,identified Potential for Loss of Essential Siphon Vacuum Sys.Caused by Design Oversight. Procedure Revised.With + (04:57:29, 7 December 2024)
- ML20206P758 + (04:57:30, 7 December 2024)
- ML20206P755 + (04:57:31, 7 December 2024)
- ML20206P753 + (04:57:32, 7 December 2024)
- ML20206P745 + (04:57:33, 7 December 2024)
- ML20206P747 + (04:57:33, 7 December 2024)
- ML20206P743 + (04:57:34, 7 December 2024)
- ML20206P742 + (04:57:34, 7 December 2024)
- ML20206P740 + (04:57:35, 7 December 2024)
- ML20206P741 + (04:57:35, 7 December 2024)
- ML20206P739 + (04:57:36, 7 December 2024)
- ML20206P734 + (04:57:37, 7 December 2024)
- ML20206P738 + (04:57:37, 7 December 2024)
- ML20206P733 + (04:57:38, 7 December 2024)
- ML20206P732 + (04:57:38, 7 December 2024)
- ML20206P729 + (04:57:39, 7 December 2024)
- ML20206P726 + (04:57:43, 7 December 2024)
- PNO-III-87-055, on 870410-11,licensee Identified Several Steam Leaks in Main Steam Line & HPCI & RCIC Sys Declared Inoperable.Caused by Cracked Welds & Blown Fuse, Respectively.Reactor Shut Down for Steam Line Repairs + (04:57:44, 7 December 2024)
- NG-99-0678, Application for Amend to License DPR-49,revising SLMCPR to Support Operation with GE-12 Fuel with 10x10 Pin Array + (04:57:45, 7 December 2024)
- ML20206P721 + (04:57:45, 7 December 2024)
- ML20206P720 + (04:57:46, 7 December 2024)
- ML20206P717 + (04:57:48, 7 December 2024)
- ML20206P716 + (04:57:49, 7 December 2024)
- ML20206P715 + (04:57:50, 7 December 2024)
- ML20206P714 + (04:57:50, 7 December 2024)
- ML20206P713 + (04:57:51, 7 December 2024)
- PNO-III-87-054, on 870409,unit Manually Shut Down & Scrammed Following Vacuum Problem in Main Condenser & Increasing Temp in Hotwell.Caused by Partially Dislodged Ceiling Embedment Plate Supporting Portion of Lpci.Plate Repaired + (04:57:51, 7 December 2024)
- 3F0199-02, Submits Change in Analysis of Record for SBLOCA & 10CFR50.46 Notification.Attachment to Ltr Includes Description of How Limitations & Conditions Outlined in RELAP5 SER Are Addressed + (04:57:56, 7 December 2024)
- ML20206P708 + (04:58:00, 7 December 2024)
- 05000219/LER-1998-016, :on 981028,single DG Start,Occurred.Caused by Loss of One Source of Offsite Power.Generator Relay Surveillance Revised to Eliminate Possibility of Inadvertent Procedural Breaker Trips.With + (04:58:02, 7 December 2024)
- ML20206P704 + (04:58:03, 7 December 2024)
- ML20206P703 + (04:58:04, 7 December 2024)
- ML20206P702 + (04:58:04, 7 December 2024)
- ML20206P701 + (04:58:05, 7 December 2024)
- ML20206P699 + (04:58:06, 7 December 2024)
- ML20206P698 + (04:58:06, 7 December 2024)
- ML20206P697 + (04:58:07, 7 December 2024)
- 05000255/LER-1986-023, :on 860724,design Problem Discovered Re Actuating Mechanism for Equalizing Valves on Containment Bldg Escape Airlock.Caused by Error in Actuating Cams Design.Cams Modified + (04:58:09, 7 December 2024)
- 05000295/LER-1985-019, :on 850607,during Investigation of Noise Problem,Fuses Pulled & Replaced Causing Reactor Trip & Unexpected Closure of Msiv.Caused by Personnel Error. Summator 1PM505B Replaced + (04:58:11, 7 December 2024)
- HL-5712, Forwards Ehnp Intake Structure License Rept, to Provide Example of Technical Content & Level of Detail Planned for Application for License Renewal,For NRC Review + (04:58:12, 7 December 2024)
- ML20206P692 + (04:58:12, 7 December 2024)
- 05000251/LER-1986-013-01, :on 860722 & 24,while Performing Maint on Safeguard Relays,Phase a Containment Isolation Actuated. Caused by Inadvertent Relay Actuation.Actuation Signal Reset & Valves Reopened + (04:58:14, 7 December 2024)
- ML20206P689 + (04:58:15, 7 December 2024)
- 05000317/LER-1998-009, :on 980408,required Hourly Fire Watch Missed, When Contractor Maint Worker Failed to Perform Fire Watch Patrol.Caused by Personnel Error.Plant Mgt Reiterated Expectation to Contractor Personnel.With + (04:58:17, 7 December 2024)
- ML20206P686 + (04:58:17, 7 December 2024)
- ML20206P685 + (04:58:18, 7 December 2024)
- HL-5725, Informs That SNC Intends to Examine Approx Dozen Weld Overlays During Unit 1 Spring 1999 Outage That to Date Have Not Been Examined Three Times Since Weld Overlay Was Supplied + (04:58:26, 7 December 2024)
- ML20206P681 + (04:58:27, 7 December 2024)
- ML20206P682 + (04:58:27, 7 December 2024)
- ML20206P679 + (04:58:28, 7 December 2024)
- ML20206P680 + (04:58:28, 7 December 2024)