Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206R628 + (04:40:08, 7 December 2024)
- ML20206R625 + (04:40:12, 7 December 2024)
- ML20206R624 + (04:40:13, 7 December 2024)
- 3F0599-18, Forwards 1998 Annual Radiological Environ Operating Rept for Crystal River,Unit 3. Rept Is Submitted in Accordance with CR-3 ITS 5.7.1.1(b) & Section 6.6 of ODCM + (04:40:14, 7 December 2024)
- ML20206R620 + (04:40:15, 7 December 2024)
- ML20206R621 + (04:40:15, 7 December 2024)
- ML20206R619 + (04:40:16, 7 December 2024)
- 3F0599-17, Submits Update Response to GL 97-06, Degradation of SG Internals. Ltr Establishes No New Regulatory Commitments + (04:40:17, 7 December 2024)
- ML20206R615 + (04:40:18, 7 December 2024)
- ML20206R616 + (04:40:18, 7 December 2024)
- ML20206R613 + (04:40:19, 7 December 2024)
- ML20206R611 + (04:40:20, 7 December 2024)
- ML20206R609 + (04:40:21, 7 December 2024)
- ML20206R610 + (04:40:21, 7 December 2024)
- ML20206R608 + (04:40:22, 7 December 2024)
- ML20206R607 + (04:40:22, 7 December 2024)
- 05000335/LER-1986-007-03, :on 860804,4,160-volt Bus 1A3 Deenergized Due to Inadvertent Actuation of Differential Current Protective Relay.Caused by Technician Failure to Ensure Breaker Cubicle Door Fully Open While Inserting Breaker + (04:40:24, 7 December 2024)
- ML20206R605 + (04:40:25, 7 December 2024)
- 05000373/LER-1987-014-01, :on 870319,reactor Scram Occurred Due to Generator Lockout & Subsequent Turbine Trip.Caused by Moisture Intrusion Into Bus Ducts.Main Power Transformers Inspected & Tested + (04:40:26, 7 December 2024)
- ML20206R601 + (04:40:28, 7 December 2024)
- ML20206R600 + (04:40:29, 7 December 2024)
- ML20206R599 + (04:40:30, 7 December 2024)
- ML20206R598 + (04:40:30, 7 December 2024)
- ML20206R597 + (04:40:31, 7 December 2024)
- ML20206R592 + (04:40:32, 7 December 2024)
- ML20206R594 + (04:40:32, 7 December 2024)
- 3F0487-15, Submits Annual Schedule Update for Implementation of Requirements for Emergency Response Capability,Per 830531 Commitment.Completion of Reg Guide 1.97 Scheduled for Refuel VI to Begin in Fall 1987 + (04:40:33, 7 December 2024)
- ML20206R590 + (04:40:33, 7 December 2024)
- PNO-IV-97-057, on 971017,radiation Safety Officer Inquired Re Reportability of Brachytherapy Incident at Facility in Oct 1997.Patient Removed Source Prior to Scheduled Completion of Treatment + (04:40:34, 7 December 2024)
- ML20206R587 + (04:40:35, 7 December 2024)
- PNO-III-97-099, on 971219,unit Shut Down Due to Incomplete App R Safe Shutdown Analysis for Various Fire Scenarios. Licensee Completed Procedure Revs & Exited Administrative Technical Requirement in Early Dec + (04:40:36, 7 December 2024)
- ML20206R583 + (04:40:37, 7 December 2024)
- PNO-III-97-098, on 971216,patient Received 4,500 Rads Co-60 Instead of Intended 5,400 Rads.Region III Will Conduct Special Insp to Review Circumstances Surrounding Misadministration + (04:40:38, 7 December 2024)
- IR 05000344/1986025 + (04:40:39, 7 December 2024)
- ML20206R574 + (04:40:40, 7 December 2024)
- PNO-III-97-097, on 971211,licensee Received Telephone Notification of Cs-137 Sealed Source Missing from Troxler Model 3411B Moisture/Density Gauge.Source Located in Soils Lab Under Workbench.Source Shielded & Secured + (04:40:40, 7 December 2024)
- ML20206R572 + (04:40:41, 7 December 2024)
- PNO-III-97-096, on 971211,unloaded Handgun & Ammunition Found in Brief Case of Il Resident Inspector.Inspector Placed on Administrative Leave & Il State Police Performing Investigation + (04:40:41, 7 December 2024)
- ML20206R570 + (04:40:42, 7 December 2024)
- ML20206R568 + (04:40:43, 7 December 2024)
- PNO-III-97-095, on 971202,chemical Explosion Damaging Housing of Nuclear Gauge Containing 10 Mci Cs-137 in Sealed Source Occurred.Authorized Firm Packaged Damaged Nuclear Gauge for Transport + (04:40:43, 7 December 2024)
- PNO-III-97-094, on 971129,unit 1 Reactor Restarted.Unit Scheduled to Remain Online Until Routine Refueling Outage Planned for Early 1998 + (04:40:44, 7 December 2024)
- PNO-III-97-093, on 971116,nominal 98 Ci Ir-192 Radiography Source Became Stuck in Collimator Due to Drive Cable Failure.Rso Responded to Job Site & Was Able to Complete Source Recovery Operations + (04:40:45, 7 December 2024)
- PNO-V-86-056, on 860829,first Refueling Outage Began.Work to Include Copper Reduction & court-ordered Replacement of New High Density Fuel Racks W/Older Low Density Fuel Racks + (04:40:45, 7 December 2024)
- ML20206R562 + (04:40:46, 7 December 2024)
- ML20206R561 + (04:40:46, 7 December 2024)
- ML20206R560 + (04:40:47, 7 December 2024)
- PNO-III-97-092, on 971117,moisture/density Gauge Damaged by Earthmoving Equipment.Sealed Source Could Not Be Returned to Shielded Position Due to Bent Source Rod.Source & Gauge Returned to Mfg for Repair + (04:40:48, 7 December 2024)
- ML20206R557 + (04:40:48, 7 December 2024)
- ML20206R556 + (04:40:49, 7 December 2024)
- PNO-III-97-091, on 971112,Troxler 3440 Moisture Density Gauge Stolen from Licensee Truck.Local Police Dept Notified. Incident Under Investigation + (04:40:49, 7 December 2024)
- PNO-III-97-090, on 971110,patient Scheduled to Receive 296 Mbq I-131 for Treatment of Hyperthyroid Condition Received 170.2 Mbq.Patient Returned & Was Administered Additional Dose + (04:40:50, 7 December 2024)