Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18039A066 + (16:25:24, 6 January 2025)
- ML18039A061 + (16:25:25, 6 January 2025)
- ML18039A059 + (16:25:26, 6 January 2025)
- ML18039A056 + (16:25:27, 6 January 2025)
- ML18039A057 + (16:25:27, 6 January 2025)
- ML18039A055 + (16:25:28, 6 January 2025)
- ML18039A053 + (16:25:30, 6 January 2025)
- IR 05000250/2017004 + (16:25:47, 6 January 2025)
- ML18039A038 + (16:25:48, 6 January 2025)
- ML18039A036 + (16:25:49, 6 January 2025)
- ML18039A037 + (16:25:49, 6 January 2025)
- ML18039A025 + (16:25:51, 6 January 2025)
- ML18039A024 + (16:25:51, 6 January 2025)
- ML18039A012 + (16:25:52, 6 January 2025)
- ML18039A009 + (16:25:52, 6 January 2025)
- RA-18-008, Summary of Changes to Quality Assurance Topical Report, NO-AA-10 + (16:25:55, 6 January 2025)
- TSTF-18-02, Technical Specifications Task Force - Transmittal of TSTF-569, Revision 0, Revise Response Time Testing Definition + (16:25:56, 6 January 2025)
- ML18039A001 + (16:26:02, 6 January 2025)
- ML18038C004 + (16:26:05, 6 January 2025)
- ML18038C003 + (16:26:06, 6 January 2025)
- ML18038C001 + (16:26:07, 6 January 2025)
- ML18038C000 + (16:26:08, 6 January 2025)
- IR 05000259/1997009 + (16:26:09, 6 January 2025)
- 05000260/LER-1997-007-02, :on 971028,Unit 2 Automatically Scrammed.Caused by Momentary Pressure Drop in electro-hydraulic Control Sys at Turbine Control Valves.Scram Contactor Replaced + (16:26:11, 6 January 2025)
- 05000260/LER-1997-007, Forwards LER 97-007-00 Re Reactor Scram from 70 Percent Power.Event Resulted from Pressure Perturbation in electro- Hydraulic Control Sys at Turbine Control Valves + (16:26:13, 6 January 2025)
- 05000260/LER-1997-006-02, :on 971019,declared Unit 2 Hpcis Inoperable. Caused by High Condensate Level in HPCI Turbine Inlet Steam Line Drain Pot.Work Request Initiated + (16:26:14, 6 January 2025)
- 05000260/LER-1997-006, Forwards LER 97-006-00 Re Inoperable Unit 2 Hpcis Discovered During Power Ascension from Unit 2 Cycle 9 Refueling Outage. Rept Submitted in Accordance w/10CFR50.73(a)(2)(v) + (16:26:16, 6 January 2025)
- ML18038B990 + (16:26:17, 6 January 2025)
- ML18038B988 + (16:26:18, 6 January 2025)
- ML18038B987 + (16:26:19, 6 January 2025)
- 05000260/LER-1997-005-03, :on 971012,ESF Components Were Actuated.Caused by Inadequate Procedure.Cs Pumps Were Secured & Injection Valves Were Closed & Refueling Floor Activities Were Stopped + (16:26:20, 6 January 2025)
- 05000260/LER-1997-005, Forwards LER 97-005-00,providing Details Concerning auto- Start of Engineered Safety Features.Event Resulted from Inadequate Procedure in That Procedure for Developing Post Mod Tests Did Not Require Task Risk Review + (16:26:22, 6 January 2025)
- ML18038B983 + (16:26:23, 6 January 2025)
- ML18038B982 + (16:26:25, 6 January 2025)
- ML18038B980 + (16:26:26, 6 January 2025)
- ML18038B979 + (16:26:27, 6 January 2025)
- ML18038B978 + (16:26:28, 6 January 2025)
- ML18038B976 + (16:26:29, 6 January 2025)
- ML18038B975 + (16:26:31, 6 January 2025)
- ML18038B974 + (16:26:32, 6 January 2025)
- ML18038B973 + (16:26:32, 6 January 2025)
- ML18038B971 + (16:26:33, 6 January 2025)
- 05000260/LER-1997-004-03, :on 970909,TS Surveillances Were Not Performed During Refueling Outage Timeframe.Caused by Personnel Error. Incorporated Missed Snubber & Vacuum Breaker Surveillances Into Refueling Outage Schedule + (16:26:34, 6 January 2025)
- 05000260/LER-1997-004, Forwards LER 97-004-00,providing Details Re Failure to Perform Required Surveillances During Refueling Outage Time Frames as Required by TS + (16:26:36, 6 January 2025)
- ML18038B967 + (16:26:37, 6 January 2025)
- 05000296/LER-1997-005-02, :on 970824,LCO Was Not Entered When Valve Was Malfunctioning.Caused by Lack of Questioning Attitude by Operations Crew.Involved SROs Were Counseled & Problem Evaluation Rept Will Be Discussed + (16:26:39, 6 January 2025)
- 05000296/LER-1997-005, Forwards LER 97-005-00,providing Details Concerning Failure to Enter LCO When Unit 3 Primary Containment Isolation Flow Control Valve Was Declared Inoperable Due to Sticking Solenoid Valve.Rsos Developed Mindset Re Failure Mech + (16:26:41, 6 January 2025)
- ML18038B963 + (16:26:42, 6 January 2025)
- ML18038B960 + (16:26:43, 6 January 2025)
- ML18038B961 + (16:26:43, 6 January 2025)
- ML18038B958 + (16:26:44, 6 January 2025)