Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18045A830 + (15:24:07, 6 January 2025)
- ML18045A829 + (15:24:09, 6 January 2025)
- ML18045A828 + (15:24:10, 6 January 2025)
- ML18045A826 + (15:24:14, 6 January 2025)
- ML18045A821 + (15:24:15, 6 January 2025)
- ML18045A820 + (15:24:16, 6 January 2025)
- ML18045A817 + (15:24:17, 6 January 2025)
- IR 05000255/1980012 + (15:24:20, 6 January 2025)
- ML18045A814 + (15:24:21, 6 January 2025)
- ML18045A813 + (15:24:22, 6 January 2025)
- ML18045A807 + (15:24:23, 6 January 2025)
- ML18045A804 + (15:24:24, 6 January 2025)
- ML18045A803 + (15:24:25, 6 January 2025)
- ML18045A800 + (15:24:26, 6 January 2025)
- ML18045A802 + (15:24:26, 6 January 2025)
- ML18045A799 + (15:24:27, 6 January 2025)
- ML18045A798 + (15:24:28, 6 January 2025)
- ML18045A794 + (15:24:30, 6 January 2025)
- ML18045A797 + (15:24:30, 6 January 2025)
- 05000255/LER-1980-036-01, /01T-0:on 800929,while Testing C-51A Vacuum Degasifier Pump,Radioactive Gaseous Release Occurred Prior to Required 15-day Holdup.Cause Not Determined.Release Terminated by Stopping Vacuum Pump + (15:24:32, 6 January 2025)
- RAIO-0218-58672, LLC Response to NRC Request for Additional Information No. 351 (Erai No. 9259) on the NuScale Design Certification Application + (15:24:33, 6 January 2025)
- 05000255/LER-1980-036, Forwards LER 80-036/01T-0 + (15:24:35, 6 January 2025)
- ML18045A788 + (15:24:37, 6 January 2025)
- ML18045A787 + (15:24:39, 6 January 2025)
- 05000255/LER-1980-037-01, /01X-0:on 801009,found Pipe Support Sway Strut Bushings Furnished by Corner & Lada,Inc May Become Loose or Disengaged from Clamp End.Caused by Mfg Defect.Bechtel Is Reviewing Issue for Corrective Actions + (15:24:40, 6 January 2025)
- 05000255/LER-1980-037, Forwards LER 80-037/01X-0 + (15:24:42, 6 January 2025)
- ML18045A780 + (15:24:43, 6 January 2025)
- ML18045A778 + (15:24:44, 6 January 2025)
- ML18045A777 + (15:24:45, 6 January 2025)
- PNO-III-80-100, on 800524,plant Achieved Criticality After Shutdown of More than Eight Months.During Shutdown,Extensive Const & Mod Work Was Completed Including TMI Mods,Seismic Restraint Mods & Replacement of Boric Acid Heat Tracing + (15:24:46, 6 January 2025)
- PNO-III-80-150, on 800812,unplanned Gaseous Release of 2 to 4 Minutes Occurred While Transferring Quench Tank Cover Gas to Gaseous Waste Holdup Sys.Release Was within Tech Spec Limits.Licensee Is Investigating Source of Release + (15:24:48, 6 January 2025)
- PNO-III-80-128A, on 800709,plant Was Started Up & While at Low Power,Reactor Automatically Shut Down from High Startup Rate Trip.Caused by Faulty Instrument.During Startup Control Rod 8 Would Not Move.Repairs Are in Progress + (15:24:53, 6 January 2025)
- PNO-III-80-155, on 800819,licensee Reported That Surveillance Test Had Been Performed During Power Operation Which Should Have Been Performed Only While in Cold Shutdown + (15:24:56, 6 January 2025)
- PNO-III-80-162, on 800831,labor Contract Expires.Negotiations for New Contract Are Continuing.Possibility Exists That Strike Might Be Called 800901 or Later.Strike Would Involve Operations,Maint & Const Personnel + (15:24:58, 6 January 2025)
- PNO-III-80-160, on 800827,licensee Notified Region 3 That Unit Will Be Taken to Cold Shutdown for Replacement of Leaking Control Rod Drive Seals.Shutdown Is Expected to Last Approx Five Days + (15:25:00, 6 January 2025)
- PNO-III-80-159, on 800826,while Operating at 88% Power,Plant Was Manually Tripped Because of Loss of Condensate & Feedwater Pumps.Recovery Took 2.5-h to Regain Onscale Readings of Steam Generator Levels + (15:25:02, 6 January 2025)
- ML18045A767 + (15:25:03, 6 January 2025)
- ML18045A761 + (15:25:04, 6 January 2025)
- PNO-III-80-175, on 800912,wildcat Strike Was Initiated. Pickets at Main Gate Are Being Honored by Operations, Maint & Const Personnel.Plant Will Continue to Operate Staffed by Mgt Personnel + (15:25:06, 6 January 2025)
- ML18045A758 + (15:25:07, 6 January 2025)
- ML18045A756 + (15:25:08, 6 January 2025)
- ML18045A755 + (15:25:09, 6 January 2025)
- PNO-III-80-144, on 800901,licensee Reported Unplanned Release of Radioactive Gas.Source of Release Was Failed Rupture Disc on Waste Gas Compressor.Amount Released Is Small Fraction of Tech Spec Limits + (15:25:11, 6 January 2025)
- PNO-III-80-140A, licensee Analysis Indicates That All ECCS Pumps on Affected Line Would Have Been Subj to Air Binding Because Containment Sump Valve Cv 3030 Had Been Improperly Positioned to Open Position + (15:25:13, 6 January 2025)
- ML18045A744 + (15:25:14, 6 January 2025)
- ML18045A746 + (15:25:14, 6 January 2025)
- 05000255/LER-1980-035-03, /03L-0:on 800830,during Return to Svc After Shutdown,Leakage Discovered Through Pressure Relief Valve. Caused by Loose Spring Guide within Solenoid Assembly Valve Due to Failed Brazed Joint.Guide Brazed Back Onto Plate + (15:25:16, 6 January 2025)
- 05000255/LER-1980-035, Forwards LER 80-035/03L-0 + (15:25:18, 6 January 2025)
- ML18045A740 + (15:25:19, 6 January 2025)
- ML18045A739 + (15:25:20, 6 January 2025)
- ML18045A716 + (15:25:20, 6 January 2025)