Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000272/LER-1991-028, :on 910823,steam Generator Blowdown Outlet Isolation Valve 12GB4 Failed Closed.Caused by Failure of Valve Actuator Diaphragm.Investigation Underway.Valve Repair Completed on 910824 + (07:42:46, 6 January 2025)
- 05000311/LER-1991-012-02, :on on 910826,4 Kv Vital Bus 2A Tripped While Starting & Loading Diesel Generator 2A.Caused by Technician Connecting Jumper to Wrong relay.Color-coded Banana Jackets Installed on Relay Terminal Lugs + (07:42:48, 6 January 2025)
- ML18096A284 + (07:42:50, 6 January 2025)
- ND-18-0393, Submittal of 10 CFR 50.46 Annual Report + (07:42:51, 6 January 2025)
- IR 05000272/1991022 + (07:42:55, 6 January 2025)
- ML18096A276 + (07:42:57, 6 January 2025)
- TAC:69680 + (07:42:58, 6 January 2025)
- ML18096A275 + (07:42:59, 6 January 2025)
- ML18096A274 + (07:43:01, 6 January 2025)
- ML18096A273 + (07:43:02, 6 January 2025)
- ML18096A271 + (07:43:03, 6 January 2025)
- ML18096A270 + (07:43:04, 6 January 2025)
- ML18096A268 + (07:43:04, 6 January 2025)
- SECY-11-0161, Executive Branch Review of NRC Legislative Proposals (Redacted) + (07:43:05, 6 January 2025)
- ML18096A265 + (07:43:10, 6 January 2025)
- 05000311/LER-1990-020, :on 900512,containment purge/pressure-vacuum Relief Sys Isolation Signal Received from Radiation Monitoring Sys.Caused by Equipment Design Concerns. Uninterruptible Power Supply Installed + (07:43:11, 6 January 2025)
- 05000272/LER-1991-027, :on 910815,two Partial Mode Op I 1A Safeguard Equipment Control Cabinet Signal Actuations Occurred.Caused by Equipment Failure.Chassis Replaced & Failed Cards Sent to Mfg + (07:43:14, 6 January 2025)
- ML18096A262 + (07:43:16, 6 January 2025)
- ML18096A260 + (07:43:17, 6 January 2025)
- ML18096A257 + (07:43:18, 6 January 2025)
- ML18096A256 + (07:43:19, 6 January 2025)
- ML18096A252 + (07:43:19, 6 January 2025)
- ML18096A251 + (07:43:21, 6 January 2025)
- ML18096A250 + (07:43:22, 6 January 2025)
- ML18096A248 + (07:43:23, 6 January 2025)
- 05000272/LER-1991-026, :on 910712,steam Generator Pressure Protection Channel Discovered Inoperable Due to Lead & Lag Switch Set Incorrectly.Caused by Personnel Error.Steam Generator Pressure Procedures Revised + (07:43:28, 6 January 2025)
- 05000272/LER-1991-021, :on 910522 & 0603,Tech Spec 3/4.8.3.1 Noncompliance Discovered.Caused by Personnel Error.Amend Implementation Event Reviewed W/Prior Tech Spec Administrator + (07:43:30, 6 January 2025)
- ML18096A241 + (07:43:32, 6 January 2025)
- ML18096A238 + (07:43:33, 6 January 2025)
- 05000272/LER-1991-011-02, :on 910730,discovered That Nonradioactive Liquid Waste Discharge Radiation Monitoring Sys Channel Setpoint Not Correct.Caused by Inadequate Design Review. Design Change Process Procedure Revised + (07:43:34, 6 January 2025)
- ML18096A236 + (07:43:36, 6 January 2025)
- ML18096A235 + (07:43:37, 6 January 2025)
- ML18096A234 + (07:43:38, 6 January 2025)
- ML18096A232 + (07:43:39, 6 January 2025)
- ML18096A230 + (07:43:40, 6 January 2025)
- IR 05000272/1991019 + (07:44:20, 6 January 2025)
- ML18096A225 + (07:44:24, 6 January 2025)
- IR 05000272/1991013 + (07:44:25, 6 January 2025)
- 05000311/LER-1991-006, :on 910321,control Room Radiation Monitoring Sys Monitor Spiked High,Resulting in ESF Actuation.On 910305 Channel Low Failure Signal Generated.Caused by Broken Wire in Detector Cable.Wires Rebuilt + (07:44:58, 6 January 2025)
- 05000272/LER-1991-025, :on 910727,plant Vent Noble Gas Radiation Monitor Channel Spiked High,Causing Channel to Deenergize & Resulting in Isolation Signal.Caused by Equipment Failure. Pins Cleaned & Monitor Reset + (07:45:35, 6 January 2025)
- 05000272/LER-1991-007-01, :on 910217,motor-driven Auxiliary Feedwater Pumps Started After 125-volt Dc Distribution Cabinet Power Supply Transferred to Emergency Power.Caused by Inadequate Administrative Controls.Schematics Reviewed + (07:45:41, 6 January 2025)
- 05000272/LER-1991-008, :on 910217,reactor Protection Signal from Nuclear Instrumentation Sys Received.Caused by Personnel Error Due to Inattention to Detail.Individual Counseled & Event Reviewed W/Personnel + (07:45:45, 6 January 2025)
- 05000311/LER-1991-010-02, :on 910723,ESF Actuation Signals Initiated. Caused by High Channel Spike on Channel 2R1B & Noble Gas Monitor 2R45C Due to Faulty Equipment Design.Detector Assembly Replaced & Design Mods Underway + (07:45:48, 6 January 2025)
- IR 05000272/1991080 + (07:45:51, 6 January 2025)
- ML18096A211 + (07:45:54, 6 January 2025)
- ML18096A210 + (07:45:56, 6 January 2025)
- ML18096A209 + (07:45:58, 6 January 2025)
- ML18096A208 + (07:45:59, 6 January 2025)
- ML18096A207 + (07:46:01, 6 January 2025)
- TAC:68596 + (07:46:02, 6 January 2025)
- ML18096A206 + (07:46:06, 6 January 2025)