Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18113A846 + (04:38:52, 6 January 2025)
- ML18113A845 + (04:38:52, 6 January 2025)
- ML18113A844 + (04:38:53, 6 January 2025)
- ML18113A843 + (04:38:54, 6 January 2025)
- ML18113A842 + (04:38:55, 6 January 2025)
- ML18113A839 + (04:38:56, 6 January 2025)
- ML18113A840 + (04:38:56, 6 January 2025)
- 05000280/LER-1979-002-03, /03L-0 on 790115:electrical Penetration Between Turbine Bldg & Emergency Switchgear Room Not Properly Sealed.Caused by Penetration Being Broken During Previous Implementation of Design Change + (04:38:58, 6 January 2025)
- 05000280/LER-1979-002, Forwards LER 79-002/03L-0 + (04:39:00, 6 January 2025)
- ML18113A835 + (04:39:01, 6 January 2025)
- 05000281/LER-1979-001-03, /03L-0 on 790112:personnel Batch Inner Door & Emergency Escape Manway Not Leak Tested within 72-h After Opening Because Escape Manway Safety Lock Believed Broken, Posing Hazard + (04:39:03, 6 January 2025)
- 05000281/LER-1979-001, Forwards LER 79-001/03L-0 + (04:39:05, 6 January 2025)
- ML18113A831 + (04:39:06, 6 January 2025)
- ML18113A830 + (04:39:07, 6 January 2025)
- ML18113A827 + (04:39:08, 6 January 2025)
- ML18113A826 + (04:39:09, 6 January 2025)
- ML18113A825 + (04:39:09, 6 January 2025)
- ML18113A824 + (04:39:10, 6 January 2025)
- ML18113A823 + (04:39:11, 6 January 2025)
- IR 05000280/1978034 + (04:39:12, 6 January 2025)
- ML18113A820 + (04:39:14, 6 January 2025)
- 05000280/LER-1978-038-03, /03X-1 on 781108:review of Operational Data Showed That Quarterly Calibr of Nuclear Power Range Instrumentation Had Not Been Performed Per Schedule,Due to Scheduling Error + (04:39:15, 6 January 2025)
- 05000280/LER-1978-031-03, /03X-1 on 781001:during Normal Operation,Channel I Pressurizer Level (Protection) L-I-459 Drifted High.Caused by Drift of Electronic Zero Adjustment,In Conjunction W/ Leakage Thru Transmitter Bypass/Equalizing Valve + (04:39:17, 6 January 2025)
- 05000280/LER-1978-031, Forwards LER 78-031/03X-1 & 78-038/03X-1 + (04:39:19, 6 January 2025)
- ML18113A815 + (04:39:21, 6 January 2025)
- 05000280/LER-1978-041-03, /03X-1 on 781121:during Performance of PT-39-1 at Full Power,Snubber 1-WAPD-HSS-141B Had 0 Fluid Level in Reservoir,Due to Crack in Reservoir Glass + (04:39:22, 6 January 2025)
- 05000280/LER-1978-041, Forwards LER 78-041/03X-1 + (04:39:24, 6 January 2025)
- ML18113A807 + (04:39:25, 6 January 2025)
- IR 05000280/1978033 + (04:39:27, 6 January 2025)
- ML18113A801 + (04:39:32, 6 January 2025)
- ML18113A802 + (04:39:32, 6 January 2025)
- ML18113A799 + (04:39:33, 6 January 2025)
- ML18113A795 + (04:39:34, 6 January 2025)
- ML18113A794 + (04:39:35, 6 January 2025)
- ML18113A793 + (04:39:37, 6 January 2025)
- ML18113A792 + (04:39:38, 6 January 2025)
- ML18113A790 + (04:39:39, 6 January 2025)
- 05000280/LER-1979-001-01, /01X-0 on 790102:potential non-conservatism Noted in Calculations Performed in Monitoring Heat Flux Hot Channel Factor.Caused by Failure of Sys & Procedures Used for Relevant Surveillance.Input Values Adjusted + (04:39:41, 6 January 2025)
- ML18113A788 + (04:39:42, 6 January 2025)
- 05000280/LER-1979-001, Forwards LER 79-001/01X-0 + (04:39:43, 6 January 2025)
- ML18113A780 + (04:39:44, 6 January 2025)
- GNRO-2018/00020, Transmittal of Annual Report of Individual Monitoring - NRC Form 5 for 2017 Per 10CFR20.2206 + (04:39:45, 6 January 2025)
- ML18113A774 + (04:39:46, 6 January 2025)
- ML18113A772 + (04:39:46, 6 January 2025)
- ML18113A771 + (04:39:49, 6 January 2025)
- ML18113A769 + (04:39:49, 6 January 2025)
- ML18113A768 + (04:39:50, 6 January 2025)
- ML18113A767 + (04:39:51, 6 January 2025)
- IR 05000280/1978032 + (04:39:52, 6 January 2025)
- ML18113A764 + (04:39:53, 6 January 2025)
- ML18113A763 + (04:39:57, 6 January 2025)