Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000280/LER-2076-015, Re Leakage of Water from a Recirculation Spray Heat Exchange Piping + (08:17:04, 5 January 2025)
- ML19105A128 + (08:17:06, 5 January 2025)
- ML19105A126 + (08:17:07, 5 January 2025)
- 05000280/LER-2076-016, Re Low Boron Concentration of 11.4% by Weight in Boron Injection Tank + (08:17:12, 5 January 2025)
- 05000280/LER-2077-001, Re Cease of Recirculation Flow from B Boric Acid Tank + (08:17:14, 5 January 2025)
- 05000280/LER-2077-002, Reportable Occurrence Relating to Boric Acid Transfer Pump + (08:17:16, 5 January 2025)
- 05000280/LER-2077-005, Failure of Reactor Coolant Flow Comparator to Trip + (08:17:18, 5 January 2025)
- 05000280/LER-2077-006, No Flow of Boric Acid from the Boric Acid Transfer Pumps to the Charging Pumps + (08:17:21, 5 January 2025)
- 05000280/LER-2077-007, Low Boron Injection Tank and C Boric Acid Storage Tank Concentration + (08:17:23, 5 January 2025)
- 05000280/LER-2077-008, Deficiency of Chemical Analysis Procedure to Determine Percent by Weight of Sodium Hydroxide in Chemical Addition Tank to RWST + (08:17:25, 5 January 2025)
- 05000280/LER-2077-009, Test of Main Steam Safety Valve Setpoint + (08:17:27, 5 January 2025)
- 05000280/LER-2077-010, Failure of Trip Valves to Indicated Closed on Control Room Panel, During Performance of Safety Injection System Functional Testing + (08:17:29, 5 January 2025)
- 05000280/LER-2077-011, Actuation of Pressurizer Safety Valves Outside, +/- 1% Band Specified in Tech Spec + (08:17:31, 5 January 2025)
- 05000280/LER-2077-012, Failure to Meer as Found Acceptance Criteria of Significant Number of Hydraulic Shock Suppressors + (08:17:33, 5 January 2025)
- 05000280/LER-2077-021-01, T Flooding of Valve Pit Containing Emergency Service Water Valves + (08:17:36, 5 January 2025)
- 05000280/LER-2077-014-03, L for Surry Unit 2 During Normal Operation, While Attempting Routine Boration to Achieve Proper RCS Concentration, No Flow Through FCV-2113A + (08:17:38, 5 January 2025)
- 05000280/LER-2077-013-03, L Re Low Concentration of Boron Injection Tank and C Boric Acid Storage Tank + (08:17:39, 5 January 2025)
- 05000280/LER-2077-016-03, T, LER 1977-016-03L Re Excessive Boron Concentration, LER 1977-017-03L, and LER 1977-018-03L + (08:17:41, 5 January 2025)
- 05000280/LER-2077-020-03, L Re Failure of Valve to Close After Opening, & LER 1977-020-03L Two Containment Temperature Was Less than 100 Degrees F + (08:17:43, 5 January 2025)
- 05000280/LER-2077-022-03, L Re Routine Sampling of Bast a Revealed Tank Was at Concentration of 11.5%, & LER 1977-022-03L Re Failure of Comparator to Trip During Routine Test of a Steam Generator Level Protection Channel II + (08:17:45, 5 January 2025)
- 05000280/LER-2078-001-03, L for Surry Unit 2 Inoperability of Condenser Circulating Water Outlet Valve + (08:17:51, 5 January 2025)
- 05000280/LER-2078-004-03, L Re Erroneous Readings of Loop a Hot Leg Temperature Protection Channel; LER 1978-004-03L Re Unqualified Welding of Two Diaphragm Welds on Heat Exchanger; & LER 1978-005-03L Re Low Current Condition from Heat Tracing + (08:17:53, 5 January 2025)
- 05000280/LER-2078-007-03, L Re Failure of Sola Transformer, & LER 1978-007-03L Re Trip of Boric Acid Transfer Pump on Thermal Overload + (08:17:55, 5 January 2025)
- 05000280/LER-2078-009-03, L Re Snubber Body in Contact with Structure; LER 1978-009-03L Re Trip of Boric Acid Transfer Pump; & LER 1978-010-03L Re Failure of Pressurizer Channel + (08:17:57, 5 January 2025)
- 05000280/LER-2078-011-03, L for Surry Unit 1 Loss of Service Water Flow Through Charging Pump Intermediate Seal Cooler + (08:17:59, 5 January 2025)
- 05000280/LER-2078-012-01, T for Surry Unit 2 Failure to Meet Containment Integrity + (08:18:01, 5 January 2025)
- 05000280/LER-2078-006-01, T for Surry Unit 2 Review of Fire Protection Yard Piping Revealed That Two Pipe Extensions May Not Have Been Seismically Qualified + (08:18:03, 5 January 2025)
- 05000280/LER-2078-014-03, L for Surry Unit 2 Charging Pump Service Water Pump a Tripped on High Current + (08:18:05, 5 January 2025)
- 05000280/LER-2078-013-03, L for Surry Unit 2 Reactor Brought Critical Below Minimum Insertion Limit on D Control Bank + (08:18:06, 5 January 2025)
- 05000280/LER-2078-015-03, L for Surry Unit 2 Finding of Air Leak on Header of Control Room Emergency Air Supply Bank + (08:18:08, 5 January 2025)
- 05000280/LER-2078-016-03, L for Surry Unit 2 Failure of a Redundant Heat Tracing Circuit on Boron Injection Tank Inlet Pipe + (08:18:10, 5 January 2025)
- 05000280/LER-2078-018-03, L, LER 1978-018-03L, LER 1978-019-03L, & LER 1978-020-03L for Surry Unit 2 Related to Snubbers + (08:18:12, 5 January 2025)
- 05000280/LER-2078-025-03, L for Surry Unit 2 Excessive Gap Around Battery Room Ventilation Duct + (08:18:14, 5 January 2025)
- 05000280/LER-2078-023-03, L-0 Re Axial Power Distribution Monitoring Was Exceeded,& Three LERs 1978-021-03L-0, LER 1978-023-03L-0, & LER 1978-024-03L-0 Re Inlet Circulating Water Temperature Exceeded + (08:18:17, 5 January 2025)
- 05000280/LER-2078-003, /03L-0. Follow-up Inspection for Valve Cleanliness, Discovered That Containment Spray Isolation Valves (MOV-CS-201C and D) Contained No More That Five Milliliters. Technical Specification TS 6.6.2.b.(3) + (08:18:19, 5 January 2025)
- 05000280/LER-1978-027, Submit LER 78-027/03L-0 Re Seven Snubbers Not Meeting Inspection Criteria + (08:18:20, 5 January 2025)
- ML19105A039 + (08:18:26, 5 January 2025)
- ML19105A036 + (08:18:27, 5 January 2025)
- ML19105A037 + (08:18:27, 5 January 2025)
- ML19105A035 + (08:18:28, 5 January 2025)
- ML19105A032 + (08:18:29, 5 January 2025)
- ML19105A034 + (08:18:29, 5 January 2025)
- PMNS20190413, Pre-submittal Meeting to Discuss Future Submittal of Westinghouse Electric Company WCAP-10965-P-A Addendum 3, Updated Nexus Cross-Section Methodology Topical Report + (08:18:30, 5 January 2025)
- ML19105A027 + (08:18:30, 5 January 2025)
- PMNS20190397, Forthcoming Meeting to Discuss the NRC Staffs Implementation of Its Enhanced Process for Ongoing Assessment of Natural Hazard Information + (08:18:31, 5 January 2025)
- BYRON 2019-0040, Cycle 22 Core Operating Limits Report + (08:18:34, 5 January 2025)
- ML19105A020 + (08:18:35, 5 January 2025)
- ML19105A018 + (08:18:36, 5 January 2025)
- ML19105A019 + (08:18:36, 5 January 2025)
- ML19105A017 + (08:18:37, 5 January 2025)
- ML19105A010 + (08:18:38, 5 January 2025)