Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19253B078 + (13:39:41, 4 January 2025)
- ML19253B066 + (13:39:42, 4 January 2025)
- ML19253B064 + (13:39:45, 4 January 2025)
- 05000317/LER-1979-032-03, /03L-0:on 790806,12 Charging Pumps Placed Out of Svc Due to Low Suction Pressure.Caused by Faulty Pressure Indicating Switch 1-PC-224Y.Internal Parts of Switch Replaced & Pump Returned to Svc + (13:39:47, 4 January 2025)
- 05000317/LER-1979-032, Forwards LER 79-032/03L-0 + (13:39:48, 4 January 2025)
- ML19253B060 + (13:39:49, 4 January 2025)
- ML19253B058 + (13:39:51, 4 January 2025)
- 05000318/LER-1979-030-03, /03L-0:on 790805,control Element Assemblies 6,7, 49,51 & 53 Failed to Initiate Motion Inhibit Function. Caused by Drifting of Motion Inhibit Setpoint Voltage Levels.Setpoints Will Be Reduced + (13:39:52, 4 January 2025)
- 05000318/LER-1979-030, Forwards LER 79-030/03L-0 + (13:39:55, 4 January 2025)
- 05000333/LER-1979-006-03, /03X-1:on 790124,during Normal Operations,Ground Fault on 125 Station Battery a Noted.Caused by Bellows Failure on Pressure Switch Circuit safety-relief Valve 02-RV-71J.Ground Cleared.Valve Restored to Operation + (13:39:57, 4 January 2025)
- 05000333/LER-1979-006, Forwards LER 79-006/03X-1 + (13:39:59, 4 January 2025)
- 05000366/LER-1979-094-03, /03L-0:on 790822,during Spray/Sprinkler Valve Checks,Only One Fire Pump Was Operable.Caused by Inadequate Procedures.Procedures Revised + (13:40:02, 4 January 2025)
- ML19253B048 + (13:40:04, 4 January 2025)
- 05000333/LER-1979-015-03, /03X-1:on 790315,during Load Reduction & Shutdown, Rod Sequence Control Sys Failed to Pass Operations Surveillance Test F-ST-23A.Cause Unstated.Mode Switch Moved from Shutdown Position.Sys Repaired + (13:40:06, 4 January 2025)
- ML19253B046 + (13:40:07, 4 January 2025)
- 05000366/LER-1979-094, Forwards LER 79-094/03L-0 + (13:40:08, 4 January 2025)
- 05000333/LER-1979-015, Forwards LER 79-015/03X-1 + (13:40:13, 4 January 2025)
- ML19253B040 + (13:40:14, 4 January 2025)
- ML19253B037 + (13:40:15, 4 January 2025)
- ML19253B038 + (13:40:15, 4 January 2025)
- ML19253B036 + (13:40:16, 4 January 2025)
- ML19253B035 + (13:40:16, 4 January 2025)
- ML19253B033 + (13:40:17, 4 January 2025)
- 05000259/LER-1979-018-01, /01T-0:on 790823,during Insp,Restraints on Certain Core Support Structure Sys Found Inoperable.Caused by Pipe Vibration &/Or Improper Installation During Const.Restraints in Units 1,2 & 3 Being Inspected.Rept Will Be Issued + (13:40:18, 4 January 2025)
- 05000259/LER-1979-018, Forwards LER 79-018/01T-0 + (13:40:20, 4 January 2025)
- 05000293/LER-1979-033-01, /01T-0:on 790828,reactor Scram Occurred as Result of Loss of All Offsite Power When Station Switchyard Was Struck by Lightning.Emergency Diesel Generators Functioned & Assumed Emergency Loads as Reactor Maneuvered to Shutdow + (13:40:23, 4 January 2025)
- ML19253B026 + (13:40:24, 4 January 2025)
- ML19253B025 + (13:40:25, 4 January 2025)
- ML19253B023 + (13:40:25, 4 January 2025)
- ML19253B022 + (13:40:26, 4 January 2025)
- 05000293/LER-1979-033, Forwards LER 79-033/01T-0 + (13:40:27, 4 January 2025)
- ML19253B018 + (13:40:28, 4 January 2025)
- 05000334/LER-1979-031-03, /03L-0:on 790807,during Testing of Emergency Diesel Generator Sequencing Circuit,First Loading Sequence Was Shorter than Required.Caused by Starting Point Being Off Zero.Sequencer Cycled & Adjusted to within Spec Limits + (13:40:30, 4 January 2025)
- ML19253B015 + (13:40:31, 4 January 2025)
- 05000334/LER-1979-031, Forwards LER 79-031/03L-0 + (13:40:32, 4 January 2025)
- 05000321/LER-1979-050-01, /01T-1:on 790725,RHR Pump Was Found to Have Excessive Leak at Mechanical Seal.Removal of Pump from Svc for Maint Violated Tech Specs.Leak Caused by Ruptured Seal. Seal Replaced & Pump Returned to Svc + (13:40:34, 4 January 2025)
- 05000321/LER-1979-050, Forwards LER 79-050/01T-1 + (13:40:36, 4 January 2025)
- 05000321/LER-1979-069-03, LER-069/03L-0:on 790822,during Spray/Sprinkler Valve Checks, Only One Fire Pump Was Operable.Caused by Inadequate Procedures.Procedures Revised + (13:40:37, 4 January 2025)
- 05000321/LER-1979-069, Forwards LER 79-069/03L-0 + (13:40:39, 4 January 2025)
- ML19253B006 + (13:40:40, 4 January 2025)
- 05000321/LER-1979-071-03, /03L-0:on 790831,torus Level Was Below Tech Spec Limit.Caused by Failure of Personnel to Monitor Level Decrease Adequately.Level Returned to within Normal Limits. Plant Personnel Reinstructed to Prevent Recurrence + (13:40:41, 4 January 2025)
- ML19253B004 + (13:40:42, 4 January 2025)
- 05000321/LER-1979-071, Forwards LER 79-071/03L-0 + (13:40:44, 4 January 2025)
- ML19253B001 + (13:40:45, 4 January 2025)
- ML19253B000 + (13:40:49, 4 January 2025)
- ML19253A999 + (13:40:50, 4 January 2025)
- ML19253A997 + (13:40:51, 4 January 2025)
- ML19253A998 + (13:40:51, 4 January 2025)
- ML19253A993 + (13:40:53, 4 January 2025)
- ML19253A994 + (13:40:53, 4 January 2025)
- AECM-79-101, Requests Meeting to Discuss Comments of Schedule Assessment Team Re 790821 Review of Const & Startup Progress & Plans for Facility Safety Review + (13:40:54, 4 January 2025)