Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19256G227 + (03:49:39, 4 January 2025)
- ML19256G225 + (03:49:56, 4 January 2025)
- ML19256G224 + (03:49:58, 4 January 2025)
- ML19256G223 + (03:50:00, 4 January 2025)
- ML19256G222 + (03:50:02, 4 January 2025)
- ML19256G221 + (03:50:09, 4 January 2025)
- ML19256G220 + (03:50:11, 4 January 2025)
- ML19256G219 + (03:50:12, 4 January 2025)
- ML19256G218 + (03:50:14, 4 January 2025)
- ML19256G217 + (03:50:15, 4 January 2025)
- ML19256G216 + (03:50:18, 4 January 2025)
- ML19256G215 + (03:50:20, 4 January 2025)
- ML19256G214 + (03:50:22, 4 January 2025)
- IR 05000070/1979003 + (03:50:24, 4 January 2025)
- ML19256G212 + (03:50:28, 4 January 2025)
- ML19256G211 + (03:50:30, 4 January 2025)
- IR 05000498/1979017 + (03:50:31, 4 January 2025)
- ML19256G208 + (03:50:36, 4 January 2025)
- ML19256G207 + (03:50:39, 4 January 2025)
- ML19256G206 + (03:50:43, 4 January 2025)
- ML19256G205 + (03:50:45, 4 January 2025)
- ML19256G203 + (03:50:55, 4 January 2025)
- IR 05000395/1979031 + (03:50:58, 4 January 2025)
- ML19256G200 + (03:51:02, 4 January 2025)
- ML19256G199 + (03:51:04, 4 January 2025)
- 05000346/LER-1979-113-03, /03L-0:on 791121,hourly Surveillance Requirements Not Performed for 5.5-h While Incore Instrumentation Was Inoperable.Caused by Procedural Deficiency.Equipment Status Board Not Updated.Procedure Pp 1102.02 Revised + (03:51:40, 4 January 2025)
- 05000346/LER-1979-113, Forwards LER 79-113/03L-0 + (03:52:14, 4 January 2025)
- ML19256G194 + (03:52:26, 4 January 2025)
- 05000338/LER-1979-158-01, /01T-0:on 791211,during Mode 5,S&W Notified Util That Nonseismically Qualified Pressure Differential Switch (PDS-HV1228A & B) Had Been Used in Condenser Water Controls in Control Room Air Conditioners + (03:53:06, 4 January 2025)
- 05000325/LER-1979-107-01, /01T-0:on 791212,while Performing Visual Insp of Inaccessible Snubbers,Several Snubbers Found on Safety Relief Valve F013H Tailpipe.Caused by Reactor Scram When Safety Relief Valves F013F,G & H Automatically Lifted + (03:53:46, 4 January 2025)
- 05000338/LER-1979-158, Forwards LER 79-158/01T-0 + (03:54:25, 4 January 2025)
- 05000206/LER-1979-022, Forwards LER 79-022/01T-0 + (03:54:32, 4 January 2025)
- ML19256G188 + (03:54:36, 4 January 2025)
- 05000325/LER-1979-107, Forwards LER 79-107/01T-0 + (03:55:07, 4 January 2025)
- 05000325/LER-1979-106-03, /03L-0:on 791207,during Core Spray Sys,Component Test, Core Spray/Rhr Pump Running Annunciator Not Received.Caused by Shut Root Valves Not Returned to Normal Position After Testing on 791130 + (03:55:51, 4 January 2025)
- 05000324/LER-1979-091-03, /03L-0:on 791126,during Normal Plant Operation, Operator Noticed Containment Atmospheric Monitor CAC-AR-1259 Was Reading Upscale on Oxygen Channel.Caused by Blocked Sample Flow While Monitor Was Sampling Torus + (03:56:31, 4 January 2025)
- ML19256G183 + (03:56:35, 4 January 2025)
- 05000263/LER-1979-021, Forwards LER 79-021/03L-0 + (03:56:58, 4 January 2025)
- ML19256G181 + (03:57:01, 4 January 2025)
- 05000325/LER-1979-106, Forwards LER 79-106/03L-0 + (03:57:39, 4 January 2025)
- 05000324/LER-1979-101-03, /03L-0:on 791120,during Normal Reactor Startup, Intermediate Range Monitor D Did Not Indicate Proper Overlap on Range 7.Caused by Preamplifier Maladjustment.Preamplifier Adjusted Per Maint Instruction 3-15J + (03:58:24, 4 January 2025)
- 05000324/LER-1979-091, Forwards LER 79-091/03L-0 + (03:59:14, 4 January 2025)
- 05000324/LER-1979-098-03, /03L-0:on 791129,while Replacing Section of Flex Conduit Leading to Flow Switch,One Lead Came in Contact W/ Case,Shorting Itself & Causing RHR Logic a Power Failure. Caused by Blown F-1 Fuse.Fuse Replaced + (03:59:51, 4 January 2025)
- ML19256G174 + (04:00:02, 4 January 2025)
- ML19256G172 + (04:00:04, 4 January 2025)
- ML19256G171 + (04:00:05, 4 January 2025)
- 05000325/LER-1979-091-03, /03L-0:on 791201,seal Staging Flow High Annunciator Was Received on Recirculation Pump 1B & Drywell Floor Drain Pump Started Pumping.Caused by Excessive Packing Leakage of Recirculation Pump 1B Suction + (04:00:41, 4 January 2025)
- 05000324/LER-1979-101, Forwards LER 79-101/03L-0 + (04:01:17, 4 January 2025)
- 05000324/LER-1979-098, Forwards LER 79-098/03L-0 + (04:02:02, 4 January 2025)
- ML19256G165 + (04:02:07, 4 January 2025)
- ML19256G164 + (04:02:09, 4 January 2025)