Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214F552 + (07:13:06, 4 December 2024)
- ML20214F553 + (07:13:06, 4 December 2024)
- ST-HL-AE-2160, Requests Schedular Exemption from GDC 57 for Penetrations M 23,M 26 & M 28 for Component Cooling Water (CCW) Return Lines from Reactor Containment Fan Coolers Until First Scheduled Refueling Outage + (07:13:07, 4 December 2024)
- ML20214F547 + (07:13:08, 4 December 2024)
- ML20214F545 + (07:13:08, 4 December 2024)
- ML20214F543 + (07:13:10, 4 December 2024)
- ML20214F544 + (07:13:10, 4 December 2024)
- ML20214F540 + (07:13:11, 4 December 2024)
- ML20214F539 + (07:13:11, 4 December 2024)
- ML20214F537 + (07:13:12, 4 December 2024)
- ML20214F533 + (07:13:13, 4 December 2024)
- ML20214F534 + (07:13:13, 4 December 2024)
- ML20214F531 + (07:13:14, 4 December 2024)
- IR 05000333/1986020 + (07:13:15, 4 December 2024)
- ML20214F528 + (07:13:15, 4 December 2024)
- ML20214F527 + (07:13:16, 4 December 2024)
- ML20214F520 + (07:13:17, 4 December 2024)
- ML20214F525 + (07:13:17, 4 December 2024)
- ML20214F519 + (07:13:18, 4 December 2024)
- ML20214F515 + (07:13:19, 4 December 2024)
- IR 05000454/1986046 + (07:13:20, 4 December 2024)
- ML20214F510 + (07:13:21, 4 December 2024)
- ML20214F507 + (07:13:21, 4 December 2024)
- ML20214F505 + (07:13:22, 4 December 2024)
- ML20214F503 + (07:13:23, 4 December 2024)
- ML20214F501 + (07:13:23, 4 December 2024)
- HBL-86-039, Forwards Rev 1 to Proposed Physical Security Plan,Based on Discussions W/Nrc & Description of Changes.Encls Withheld (Ref 10CFR73.21) + (07:13:24, 4 December 2024)
- TXX-6084, Interim Deficiency Rept CP-86-74 Re Rockwell Terminal Boxes. Initially Reported on 861021.S&W Evaluation Continuing.Next Rept Expected by 861219 + (07:13:24, 4 December 2024)
- ML20214F496 + (07:13:25, 4 December 2024)
- ML20214F489 + (07:13:26, 4 December 2024)
- ML20214F491 + (07:13:26, 4 December 2024)
- ML20214F484 + (07:13:27, 4 December 2024)
- ML20214F486 + (07:13:27, 4 December 2024)
- ML20214F483 + (07:13:28, 4 December 2024)
- ML20214F481 + (07:13:28, 4 December 2024)
- AECM-86-0319, Understands That Agreements Reached W/Nrc During 861007-08 Discussions Re Svc Water Sys Supply to Control Room Air Conditioning Unit Can Be Applied to Control Room Air Conditioning Sys (Loop a) + (07:13:29, 4 December 2024)
- ML20214F475 + (07:13:30, 4 December 2024)
- PNO-V-86-082, on 861117,water Observed Leaking from Spent Fuel Pool Liner Into Annulus,Through Concrete Walls Into Nonradiologically Controlled Part of Plant.Caused by Annulus Drain Valve Closed for Maint.Annulus Area Drained + (07:13:31, 4 December 2024)
- ML20214F474 + (07:13:31, 4 December 2024)
- ML20214F468 + (07:13:32, 4 December 2024)
- ML20214F464 + (07:13:33, 4 December 2024)
- ML20214F466 + (07:13:33, 4 December 2024)
- ML20214F461 + (07:13:34, 4 December 2024)
- 05000298/LER-1986-028, :on 861021,58 Out of 88 Seismic Class Is Supports on Standby Gas Treatment Sys Suction Ductwork Found Structurally Inadequate.Caused by Undocumented Design Changes.Mods Immediately Initiated + (07:13:36, 4 December 2024)
- ML20214F450 + (07:13:37, 4 December 2024)
- ML20214F452 + (07:13:37, 4 December 2024)
- ML20214F447 + (07:13:38, 4 December 2024)
- ML20214F443 + (07:13:39, 4 December 2024)
- ML20214F446 + (07:13:39, 4 December 2024)
- ML20214F441 + (07:13:40, 4 December 2024)
- ML20214F438 + (07:13:40, 4 December 2024)
- ML20214F433 + (07:13:42, 4 December 2024)